HomeMy WebLinkAboutCOMPLIANCE CERTIFICATE - 06-00516 - Dental Health Center - AdditionOct 17 2006 4:33PM Sundberg & Hssociates, In 208-522-6928 P.1 0600516 Dental Health Center Addition CQMcheck Software Version 3.1 Release i Envelope Compliance Certificate 2003 IECC Report Date: 10/17/06 Data fllename: C:1Documents and SettingsljeffgolMy DocumardsIDOUG SMITFAC.OMcheck.cck Section 1: Project Information Project Title: Dental Health Center - Building Addition Construction Sim: 56 Professional Way Rexburg, ID 83440 Dwner/Agent: doug Smith DOS fafd Dental FleaBh Center 56 Professional Plaza Rexburg, ID 83440 366-3133 Section 2: General Information Building Location (forweather data): Rexburg, Idaho Climate Zone: 18 Hoating Degree Days (base 65 degrees F): 8693 Cool8lg Degree Days (base 65 degrees F): 143 Project Type: Addition Glazing Area Percentage: 16% Bulldlna Tree Floor Area Medical and Cliru®I Cale 1633 Section 3: Requirements Checklist Des igner/Contractor' Newell Goldsbo0y Sundoernnd Associates, Ira:. 111 East 1661 Street Idaho Falls, ID 83404 5226901 sundberg@lda.net J 11 OCT 2 0 ZOOG , s� CITY OF REXPI Climate -Specific Requirements: Component NamelDescriptlon Gross Area Cavhy Cont. Proposed Budget or R-Value R-Value U-Factor U-Factor Perimeter Roof 1: All -Wood JoisttRafter/huss 1633 28.0 D.0 0.038 0.D47 Exlenor Well 1: Wood Frame, Any Spacing 48 21.0 0.0 0.D62 D.067 Exterior Wall 2: Wood Frame, Any Spacing 243 21.0 0.0 0.D62 D.087 Wndrnv 1: Vinyl Frame: Double Pane With Lev-E, Tinted, SHGC 0.35 a4 — •- 0.370 0.520 Exterior Wall 3: Wood Frame, Any Spacing 424 21.0 0.0 0.062 0.067 Window 2: Vinyl Frame:Double Pane with Low-E. Tinted, SHGC 0.35 80 --- — 0.370 0.520 Door'.: Solid 24 --- -- 0.150 0.112 Exterior Wall 4: Wood Frame, Any Spectra 256 21.0 0.0 0.062 O.D67 'Window 3: Vinyl Freme:Double Pane with Low-E, Tinted, SHGC 0.35 60 -- -- 0.370 0.520 Exterior Wa0 5: Wood Frame, Arty Spacing 410 21.0 0.0 0.062 0.067 Window 4: Vinyl FrameMouble Pane with Low-E, Tinted, SHGC 0.35 40 — -- 0.370 0.520 Basement Wall 1: Solid Concrete or Masonry «8", Furring: Wood, 840 21.0 0.0 - 0.083 0.091 Wall.Ht 10.0. Depth B.G. 8.0 Dental Health Center - Building Addition - PwA 1 of 2 Oct 17 2006 4:33PM Sundberg & Associates, In 208-522-6928 • l�J (a) Budget U-factors are used for software baseline calcu€adons ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requimments: ❑ 1. Ad joints and penetrations are caulked, gasketed, weatw-stripped, or otherwise sealed. ❑ 2. Windows, doors, and skylights cedifted as meeting leakage requirements. ❑ 3. Component R-values & U4bdara laheled as cert[W. ❑ 4. Stair, elevator shaft vents, and other dampers integral to the budding envelope are equipped with motorized dampers. ❑ 5. Cargo doors and loading dock doors are weather seated. ❑ & Recessed [Ighttrg fixtures are: (I) Type IC rated and seeded or gasladed; or (o) Installed inside an appropriate sir -Malt assembly with a 0.5 Inch cieanum from combustible materials and with 3 Inches clearance from Insulation material. ❑ 7. Building entrance doors have a vestibule and equipped with dosing devices. Excepflbr:s: Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. ft. in area. 0 8. Vapor retarder installed. Section 4: Compliance Statement Compliance SMement. The proposed envelope design represented In this document is consistent with the budding plans, speclticatt ns and other calculadons submitted with application. The proposed envelope system has been designed to meet the 200i3 IECC requirements In COMch ers1cin 3.1 ease i and bo comply with the mandatary requ€rernenb In the Requirements Checklist. l I 97A ncipal rnelo ' es€gner- ame S6g afore �! Date Project Notes: - V COMcheck If for the eddtion shell only. Existing building Ilghttng and mechanical systems are existing and will not be changed or modified. Dental Health Center - Building Addition Page 2 of 2 p.2