Loading...
HomeMy WebLinkAboutFINAL INSPECTION CHECKLIST - 06-00521 - 118 S Hidden Valley Rd - Basement FinishM 14"/� FINAL INSPECTION CHECKLIST Date: 4,-- Project: w�vr� ry ,P��-. Job Address: f t $ s, V�i[ey l Building Permit Number: p(v oaSZ( The following comments based on the 2000 edition of the lntemational Residential Code should be resolved before an occupancy permit is issued. This correction list is not a building permit. The approval of plans and specifications does not permit the violation of any section of the lntemational Residential Code or any federal, state or local regulation. OUTSIDE f�jouse Numbers (visible from the street) .,ZGrade (yard is sloped away from foundation) Sidewalk & Landscape Strip 5' wide (WI 6 of granular borrow (hill 12")) --7' LS strip ZFront Setback Coverage 60% min green Zwindows - Covers and Screens (shall be releasable or removable from the inside for egress �ndow wells min. 24" clear out and above well / Exterior " Steps 7 3/4 max. rise & 10" min. tread p ( ) Stairway Handrails 4 or more risers or over 30" (<4" max. spacing of uprights) OGuardrails (provide if over 30" above floor/grade -& 4" max sphere spacing for uprights) Landings (36" x 36" min., (not req. at the top of the stair if a door does not'swing over stairs) Thresholds 1 1/2" max. above floor or landing (7 3/4" max if door does not swing over landing) Posts (required uired to be treated, redwood or cedar if in contact of concrete / earth) Roofing (no apparent leaks, installed properly and roofing as per plans) Masonry (lintels as per table 703.7. 1) _Z,-Roof Ventilation (as per plans) INSIDE ZEgress Doors (all egress doors must be able to open from inside without use of keys or tools) Safe Glazing provided in all doors within 24" of door arc and below 60", & in tub enclosure tY 9 P — /Bathroom Ventilation (either operable window or fan that vents directly to outside) /Sinks, Bathtubs and Showers (check for caulking, operation and leaks) Zstalrway Illumination (switch at top and- bottom) / Stairs (7 3/4"max. riser, 10"' min. tread, (nosing 3/4"to 1 1/4" with solid risers) _.,/Handrails Cont (34" to 38", 1 1/2" to wall, and grip 1 1/4" to 2" dia. upright < 4",triangular space 6" max) /Guardrails 36" high and continuous, Req'd 30" or more above grade or floor(, uprights 4" sphere max spacing, triangular space 6" sphere max spacing) /Garage Dwalled and to ed firewall enetrations and electrical boxes door to house 20 min. rated(Dry taped, P > ducts penetrating firewall must be 26 gauge min. & not open to garage) / E Iress Windows (clear 20" width and 24" height, 5.7 sf min. opening with 44" max. sill height) Smoke Detectors (in each sleeping room, outside in immediate vicinity and on each story/basement- split levels (w/o doors), only on upper floor --all interconnected without a disconnecting switch) Foam Plastic (meets requirement of R318) )Water Heater Anchorage as over 4' with flex water Conn. shall be anchored or strapped to building) 2Water Heater Vent (check air flow with return in finished basement) /Clothes Dryer Ducts solid metal ducts, no screws- in duct vent direct) to outside rY ( Y ) 2—pDuct Supports (metal ducts supported 10' min spacing & non metal as per manuf. installation instr.) Duct Insulation (duct in non conditioned areas shall be insulated) /Gas ►� " Line Supports spacing 10 for up to 3/4 , -12 for over 1 and 6 for tubing up to 1 1/2