Loading...
HomeMy WebLinkAboutJOIST - 06-00492 - 520 Woodbridge St - New SFRLING REQUIREMENTS TJI®IoIsU at bsarings: Two 8d (2Y2") box nails (1 each side), 1 Y2" minimum from end. Blocking panels, rim joist or rim board to bearing plate: TJI® blocking panels or dm joist: 1 Od (3") box nails at 6" o.c. Trus Joist rim board: Toenail with 10d (3'r) box nails at 6" o.c. or 16d (332") box nails at 12" o.c. Shear transfer. Connections equivalent to decking nail schedule. Rim board rim olst or closure to TJI® oist: 1 4" width or less: Two 10d (3") box nails, one each at top and bottom flange. Via"thru 2112" widths: Two 16d (3112') box nails, one each at top and bottom flange. 3112" width: Toenail joist to rim Joist with one 10d (3") box nail each aide of joist top flange. 2x4 minimum squash blocks: Two IOd (3") box nails, one each at top and bottom flange. ctu5j X � DO NOT allow workwx to walk on joists undl braced. INJURY MAY RESULT. WARNING Joists are unstable until braced laterally Bracing Includes: • aiwxmg " bheathmg • Hangers • Ran Board • Stmt Lkles • Rim Joint DO NOT stack building materials on unsheathed joists. Stack only over beams or walls. WARNING NOTES: Lack of concern for proper bracing during construction can result In serious accidents. Under normal conditions If the following guidelines are observed, accidents will be avoided 1. Ae btocta . hrlge,e, rtm borer and ,en plab M be and support ofthe TJI a Most moat a ownpWoy pained and properly nsoad. 2. L first Wer9M, lee a braatl and wee or an exbleq dedr, mol be sebbastlad at the ands of the bay. TNS can also be aaarplbhed by a tmporary or pwma,ent deck (sheahtog) bstrled to the hat 4 feet of ptm st the and d the bay. 1 egety bndng Name of 1x4 (mWnum)'nwt be naMed to a bread rad was or WmwdMd area u M note 2 and to each pier. wftsA Mt brM'i.' R. buddne ebMaya a IGOVer b h9Ny xvbable under Ilght oJleaILYMIn tongs - lab a Works, or We layer of ,ameeed ah WIQ. 4. eheaMk9 muat be totally assorted to sad) TJI a pint before addlaoral Inde an W placed on die system. E. Endsof gantleve regtA a safety biach on DOM ton top and bnlenm surges. S. TheTs9ee must mTato Weight wlMln a bterarla d Yi• hdn true asg,n'erd. O A complete TJ-Eport framinq plan requires ti Trus Joist Framer's Pocket Guide pu Tn,[ ]n1 e4 0.ana"r• enn4-L L.N A.. [-r__�.._� w ., 4 �-[-.u."" CTJ AX PAr t. )We _ evlm�, trITMI Note from Operator Point Load Line Load Area Load O Detail Callout Label (See Framer's Pocket Guide) I Reouired Hearin Length in inches LI (Adeouate bearing has been provided if bearing length 1e not indicated.) HANGER LIST - Simpson Strong -Tie Company, Inc.® Plot ID qty Product Label Top Nails Face Nails Member Nails Notes N1 26 IUT11 30 -RIO 2-N10 H2 1 U14 14-16d 6-NIO Hanger Notes: JOIST AND BERN LIST Plot ID Length Product Plies Qty A See Layout 11 7/8" TJI 110 joist 1 N1 9' 1 3/4" x 11 7/8" 1.9E Microllam LVL 1 1 N2 5' 1 3/4" x 11 7/8" 1.9E Microllam LVL 1 1 M3 17 1 3/4" x 14" 1.9E Hicrollam LVL 2 2 ACCESSORIES LIST SELL 16' 1 1/4" x 11 7/8" 1.3E TimberStrand LSL 1 12 Shl 4' x 8' 23/32" Panels (24" Span Rating) 1 49 Rm, Rim Board _ evlm�, trITMI Note from Operator Point Load Line Load Area Load O Detail Callout Label (See Framer's Pocket Guide) I Reouired Hearin Length in inches LI (Adeouate bearing has been provided if bearing length 1e not indicated.)