Loading...
HomeMy WebLinkAboutSITE PLAN CHECKLIST - 02-00092 - Celestial Village Apartments - 3 Buildings (36 Units)cily 0/'Wexiary Site Plan Checklist Applicant Information STATE OF IDAHO File Number: P.O. Box 280 12 North Center Street Rexburg, Idaho 83440 Phone (208) 359-3020 Fax (208) 359-3022 e-mail rexburgpsrv.net Applicant: Oeakt [Y'Pe_5d -L Phone: ❑ Owner ❑ Purchaser ❑ Lessee Applicant's Address: I L5 N. 6y0 W . MA SCLr UT u40rq Zip: 4f4# -t1 Recorded Owner: Phone: 4'd 1 - 3e1 - 0 3 -&A,— Recorded Owner Address: FAX: Development Information Project Name: Ce%<L,,N I Vdlage, 4ose_ Property Address: F,,,,"r >Z� 1. Site plan must be drawn to scale, be legible and also be submitted electronically if possible. > 2. Adjoining streets labeled. 3. Right -of-way location and width, curb to curb widths and sidewalk location. 5d 4. Building location, sq footage and dimensions, with distance to property lines. 5. Show existing and proposed easements. 6. Existing utilities (waterlines, sanitary sewer lines, manholes, storm drains). 5ir_ 7. Proposed utilities including tie in location to existing services and new easements. 8. Proposed storm drain and sanitary sewer evati (for pipe inverts at manholes and catch basins). ' ❑ 9. Storm drainage plan for parking lot and roof areas, with calculations. 10. Fire hydrants and fire suppression lines (including tie to City lines). ❑ Sprinkled Not Sprinkled 11. Parking (including parking lot, mage arr mension ot,Istance between row and total numbers). _ - ❑ 12. Landscaping (type and total area, including dimensions). 5k' 13. Trash facilities. 0 14. North Arrow 15. Drawing to Scale, includin a graphic scale /a x 17" paper if possible). K 16. Proposed street improvements (cur , gutter, sidewalk, pavement, etc.) ❑ 17. Legal description of proposed building site included. g- 18. Percent of lot covered by building or paving calculated. e 19. Show 10% snow storage area. R- 20. Distance of entrances from street corner indicated. IV4 L>Y 21. Current Vicinity Map. (8 % x 11 ") at 1" = 300' scale, showing location of the property. EWNOTE: SITE PLANS MUST BE COMPLETE AND SUBMITTED FOR REVIEW BEFORE THE PROJECT WILL BE PLACED ON THE PLANNING & ZONING AGENDA.`EA •���a�aa����.x.��x��a �:�r�x ���«.�«»��*x»��a�«x«•�x�*xx�xxa«•*x*�x���x*�•z���x�x MEMO: TO: TO WHOM IT MAY CONCERN FROM: CHRIS HUSKINSON, FIRE INSPECTOR DATE: August 1, 2002 RE: CELESTIAL VILLAGE PHASE II TO WHOM IT MAY CONCERN: Upon review of the site plan drawings submitted the following items need to be addressed: 1. Water supply: No information provided as to size or height of buildings, unable to locate fire hydrants on plan. Water supply impossible to determine. 2. Dead end parking lot exceeds 150 feet to turn a fire apparatus around. If there are any questions please feel free to contact me. Chris Huskinson Fire Inspector