Loading...
HomeMy WebLinkAboutTRUSSES LAYOUT 2 - 06-00475 - 495 Woodbridge St - New SFRMile M?L: IMPORTANT PLEASE READ AND SIGN THE ATTACHED SHEET BEFORE TAKING POSSESION OF YOUR LAYOUT! READ BY INTIALS DATE Trus Joist rim board 8 NAILING REQUIREMENTS TJI® ►oists at bearings: Two 8d (2Y2") box nails (1 each side), 1 Y2" minimum from end. Blocking panels rim joist or rim board to bearing plate: TJI® blocking panels or rim joist: 10d (3") box nails at 6" o.c. Trus Joist rim board: Toenail with 10d (3") box nails at 6" o.c. or 16d (3Y2") box nails at 12" o.c. Shear transfer: Connections equivalent to decking nail schedule. Rim board rim foist or closure to TJI® oast: 1�'/a" width or less: Two 10d (3") box nails, one each at top and bottom flange. 2%6" thru 2Y2" widths: Two 16d (3Y") box nails, one each at top and bottom flange. 3%" width: Toenail joist to rim joist with one 10d (3") box nail each side of joist top flange. 2x4 minimum squash blocks: Two 10d (3") box nails, one each at top and bottom flange. WARNING w Joists are unstable until braced laterally Bracing Includes: • Blocking • Sheathing • Hangers • Rim Board NOT allow workers IS Strut Lines • Rim Joist to walk on Joists until braced. URY MAY RESUL T complete TJ-%pert framing plan requires the True Joist Framer's Pocket See Trus Joist Framer's Pocket Guide for Product Trademark information MNO ROOF LOADS APPLIED. Rml A3 I 1 A17 AA A45 A48 )fin& 91 Rml MA1 JW u .--- rl Hl A3 Hl A3 AS Rml 12- 4' _. _... A4 l A3 - A22 A18 2. Rol A3 Rml C DIX rt. 1 0"'s, )We HANGER LIST - Simpson Strong -Tie Company, Inc.0 Plot ID Qty Product Label Top Nails Face Nails Member Nails Notes H1 30 IUT11 10-Nio 2-N'rD Hanger Notes: JOIST AND BEAN. LIST Plot ID Length Product Plies Qty A See Layout 11 7/8" TJI 110 foist M1 17' 1 3/4" x 11 7/8" 1.9E Microllam LVL 3 3 M2 4' 1 3/4" x 11 7/8" 1. RE Microllam LVL 1 1 ACCESSORIES LIST Rml 16' 1 1/4" x 11 7/8" 1.3E TimberStrand LSE 1 13 Sill 4' x 8' 23/32" Structurwood Edge Gold (24" Span Rating) 1 48 Rm, Rim Board LEVEL NOTES File Name: 59-Merrill Const Floor Layout 091806. Level Name: Main Floor Plotted: 9/18/2006 13:32 Design Status: Main Floor...9/18/2006 13:22 NOTE: Level design times indicated above prov assurance for proper level stacking. Design Methodology: ASO Floor Area Loading Is: 40psf Live Load and 12 ps£ Dead Load Maximum Joist Deflection: L/480 Live Load L/240 Total Load TJ-Pro Rating Information Weighted Average: 46 Lowest Rating: 37 Highest Rating; 65 Glued 6 Nailed Deckino is Required Direct Applied Ceiling is Not Required Floor Decking: 23/32" Structurwogd Edge Gold (24" Span Rating) Normal O.C. Spacing *Unless noted otherwise Scale: 1/4" = 1' JOB COMMENTS 59-Merrill Const Floor Layout CR'nATED BY HMC WEST 202 West Maln P. 0, BOX 188 REXBURG. ID8344G DO NOT stack building FAx 20i2)oe5)ies 3299 materials on unsheathed Joists. Stack only over SYMBOL LEGEND beams or walls. WARNING NOTES: Lack of concern for proper bracing during construction can result in serious accidents. Under normal conditions if the following guidelines are observed, accidents will be avoided. 1. Al blocking, hangers, rim boards and rim joists at the end supports of the TA • iou is must be completely insisted and properly nailed. 2. Lateral strength, like a braced end wall or an exist ng deck, must be established at the ends of the bay. This can also be accomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the and of the bay. 3. Safety bracing Imes of 1x4 (minimum) must be nailed to a braced end wall or sheathed area as in note 2 and to each joist. Without this bracing, buckling sideways or roNover Is highly probable under light construction toads - like a worker or one layer of unnelled sheathing. 4. Sheathing must be totally attached to each TJI Or joist before additional loads can be placed on the system. S. Ends of cantilevers require safety bracing on both the top and bottom flanges. 8. The flanges must remain straight within a tolerance of Y" from true alignment.