Loading...
HomeMy WebLinkAboutMULTI DOCS - 06-00450 - BYUI LDS Church Building - 8th Stake Center - Site PlanCustom Stake Cent. 06 00450 & 06 00453 BYL.II 8th Stake Center I t The following are our responses 1 compliance with the pian review commends provided on the attached 10 page fay. Page 1 -- Cover Sheet Page 2 — Building Dept. Review Items 1-5 Acknowledged Item 6 Plumbing will be installed per the 2003 UPC Page 3 — Fire Items 1 &2 Water supply: Department Review Acknowledged See the attached fire floes report and site plan indicating hydrants. Page 4 — Plannm Item I Dumpsters Item 2 Setback g Staff Review Per detaiZ F an Sheet SD - 1 the dumm em arm crrPe,nPd nn I cide.c item 3 Snow storage Item 4 walkway The open side faces the north parking lot. The sed back will be increased to 2S', The attached sketch will be issued to the Contractor as a change order. It is the intent of the design that the snow for the west parking area be hushed to the north. The storage capacity in the wept landscape strip is very limited and pushing snow into the landscape area such as this �vou�d �e�pardize the plant materials. We have provided a cropped back curb along the north area. There i's significantly more capacity for snow storage at that location. A pedestrian walkway will be added ger our phone discussion of 1.6 May. dee the attached sketch. This sketch will be issued to the Contractor as a change order. Page S — Public works Review Item 1 Sign No sign X11 be installed at this location under this pro"ect., In the future, if the owner detennimes that a sign is needed for this building then they will follow the necessary approvals process. item 2 Water -Please refer Sheet CD2. I in the plans submitted March 15th. This provides all information concerning routing of the sionn water. Item 3 Access A. curb ramp will be provided for the picnic shelter. See the attached sketch. This sketch will be issued to the contractor as a Item 4 Lighting Item 5 Ramps change order. Please refer to Sheet EO. I in the plans submitted March 15th. This sheet provides a complete lighting layout for the site. truncated comes will be provided at siode� attached drawing. Tb1s drawmg wii1 be is a change order. item 7 Dra'm*age Item 8 Spelling Item 9 Catch basin Item 14 Reinforcm'g Item I I P0 iping Note Please rifer to Sheet SD2 .1 for information pertaining to drainage pallems. Which sheet did this note refer to? The plannmg department has required this approach to be aligned directly across from the sheet cag from the gest for safety reasons. Reinforem"g will be added and the slabs thickened per city standard. We have included a sketch based an the standard and This Will be issued to the contractor as a change order. Please refer to Specifica-tions section 33 4116 "Side Sturm Utility Drainage Piping" which was submitted with the plans. This speci�ca�tion section calls out the approved piping materials. Sizing of the on and off-site piping is showy. an Sheet SD2.1 of the submitted plans. The desian was done by Aspen Engineering and their licensing stamp appears on the sheep. Dram"age calculations were submitted with the plans. Please let us know if add.itimnal copies are needed. Wage 6 Building Department Review Item 1 T)Tc item Z Service Item 3 Nater lines item 4 Testing Item S Testing Idem 6 Bond has Item 7lighting Item 8 site lighting Item 9 energy review Item 1 0 site plan item I I Item 12 finishes Item 13 We anticipate changing the type des ignation to VA for the purposes of meeting allowable area requirements. We will too bus by change ardor with the contractor. We will and. 5/9"' fweeode gypsum hoard is the second gide of wall type P-20. We will add exterior gypsum sheathing at the so�`fit areas of the five mam' enlran.ces and bebind the EInsulation Fnush System at the gables and the center walk panel at the south end of the buildm'g- These measures should qualify the building for cine -hour construction and increase the allowable square footage, to 60,375 cansidenng the frontage increase of 75% and the increase for fire sprinkler of 300°/a. OK A double check valve will be added by change order. See the attached drawm'g. OK OK -- sizing was done in accordance with code The contractor Maffl be require to bond the gasline to the main terminal bond block. OK Sight lighting — Please refer to sheet E0. 1 of the submitted plans_ The energy review was submittedwith the plans on March 15. OK OK �����0V/ Ff Nall finishes meet the staffed requirements. OK RF Item 15 est lighting Item 16 testing Exit lighting is show on Sheep E3.1 of the submitted plans Please refer to the attached document from Materials Testing and Inspection. If ftnther information is needed please contact us. Page 7 Review Action tem 1 Trusses Truss drawings ars m process and will be submitted by the contractor as soon as they are available. Item 2 Area We will madif-y the building to allow it to meet the requirements of a Type VA. structure. See item 1 0n pale b comments above. item 3 electrical All electrical lighting plans including site and building lighting, emergency and exit lighting were submitted with the plans on March 15, Items 1-4 aid item 5 Letter the General Contractor is obtaia. letter of intent from Gym State Fire Protection. That will be submitted as soon as we have it. sterns 6&7 OK Item 8 A voice evacuation system is specified for the project. Refer to the documents submitted on Marcy 15th. Item 9 A lock bow will be fumished for theproiect. We will have the General Contractor secure the forms from the Rexburg Fire Deparftnent. Page 9 Review Action item 1 Building fighfing The building mounted lighting is a cut-off type fixture providing Item 2luminescence Item 3 0 up and down figbt and will not and is not intended to provi.de, 11'ght-ing for the parking. See the attached photometric layout The overhang is only m i n i mal — j ust slightly over afoot and the upper roof planes away from the observer. Therefore it is a mar element �n the overall composition. In lieu of varying the overhang or breaking the roof line which we feel would be out of context with the arehitectural style, we chose to utilize the brick accent panels vith the quoins and stag bond brick prefer to detail G/A212) to vary the surface of the masonry wall inunediately beneath the overhang. This is a much more dominant building element. we anticipate that this will draw the attention away from the roof line. In addition, the building fagade at the lower fever which will interface visually with pedestrian displaying an ample amount of variation with th entrances, the vv�.daw treatments and the variala� 1 materials. --haw t L�� . SAY z 4 zoos 1 P, ?,"-I I . r) Q n"�N f ,.� F: V 1 1 % U �� m We feed that to deep the upper pordon of the building more simple would mean bring the focus closer to the grOund level where it will be appreciated. We hops that our design intent can be understood from this narrative. We are happy to discuss tis item furter if necessary. 5 1 M AY 2 4 2007 - LI -JI) R z:XB .. + i. R Apr. 27. 2001 8.12Aiv1 iJo, 410 4 P. Fax 1 n Plx=20835,9..302002t�0 W., =b;q, Og F= 203 ;::!iqV To: Nielson Bodily From: JaNell Hansen Fax; 522-8795 Pag�S: 9 Phone,: Re: Date' cc: Apn'I 27, 2007 LJ Urgent El For Review 0 Plea" Camnt ❑ Ple me Reply CI PIvmw Recycle r Cornmenis: Attacheci are the review nofies from the revisions that you sent. There are a few items khat sell need fo be addressed. Please contact us if you have duestians: othenr�e. we will wait for your response, thank You. JaNell Hans -en .M ke � A �4,-qy �7f r 21. 2007 8:12AM CITY OP REXBURG OW------ 1-e 14 April 27,2007 Permit Number: 06 00450 Project Name: Protect Type: Review Item No. 4104 P, --- Review Action BYU1 8th Stake Center Site Plan Review Fire Separation Setbacks and Propertly Lines Number of Perking Spaces Parking Configuration know Storage Plumbing Review Parcel #'s x , ii 4�N` ire Meets code requirements. Meets ordinance requirements. Meets ordinance requirement. Meets ordinance requirements. Meets ordinance requirement. All. plumbIng is required to be installed according to the,2003 edition of the Uniform Plumbing Code. All plumbing is required to be tested and inspected before covering. 19 1Ein St Rexburg,, Idaho 83440 Phone (208) 359�-3020 Fax (208) 359-o3022 09/21/2006 09/22/2006 09/22/2006 09/22/2006 09/22/2006 ,,...,. _,� �•. mar=� �:_�'��c+a77�+4'�r'�'i �+.-� { i 21. 2001 8:12AM Ci7Y OF Pq REXBURG. r1 eek ra fly Gomm unirl April 27, 2007 Permit Number., 06 0-0450 Project Name.a Project Type: Review item No. 4,101 P. 4_..___ Review Action BYUI 8th Stake Center Site Plan Review Approved Site Plan Approved Site Plan Approved Site Pian Approved Site Plan Parcel ffs ■kr • �„ • e F F RPRWSTAT030040 i Garbage container mush be fully screened from view of the right-of"way. The front yard setback along Trejo, near the intersection uric Manch, is only 20 feet. This landscape strip must be 25 feet as required by code. For snow storaga purposes, it is recommended that tine bushes along the west of the parking lot be sat further toward the sidewalk, leaving spaca for snow to be pushed off the parking ion more conveniently. Intemal pedestrian walkway must connect to the right of way along Mariah Ave. Please provide anther walkway from the West entrance to the sidewalk Tong Mariah for pedestdan safety. 19 E Main St. Rexburg, ]daha 83440 Phone (2a8) 359-3020 Fax (203) 35S�-3022 04/26/2007 s rE 9 d ,M A Y 2 4 0 N L---- A. P rVy. � 1 27. 2001 8:12AM CiTY OF REXBUR. G CWIRSAFNME- m �rnrs(cn� f� Cornmuniry April 27-, 2007 Permit Number: 06,00450 Project Name: Project Type: Review [tem 140, 4104 P. 5_..--- Review Action BYU1 8th Stake Center Site Plan Review ftor-. Up •, � �r7^ ,may„{� �� - s-wr- •� .� a��� r. , Approved Site Pian Parcel fPs RPRWSTAT030040 a Comments for BYU-1daho 8th Stake Center (3- 28-07) 1. The sign at the corner is an the site Wangle fbr traffic. 2. Where is the water from the catch basins in parking lot going? 3. Is there handicap access to the Picnic ShelteO 4. Need lighting plan for parking tat, 5., Sidewalk handicap ramps along street reed to have truncated dimes per eitystandard. & Are Dumpsters screened? T What is the drainage pattem? S. Under general nags sutting should be cutting. 9. Catch basin in south entrance from Marlah ave., can dive approach be move? 10. Curbing, sidewalk and approaches need to be reinforced. 11 .1Nhat are the pipe types.? Because of the size of the building and the parking area I need to sae the engineering design dor the sizing of the cin -fife ,piping and the impact this development will have on the off-site piping. Thee calculations need to be dans by an engineer. 19 E In st Rexburg,laaha 83440 Mane (208) 559-3020 Fax (208} 359-3422 - # fk, Y 2 4 2007• r L.1 r .1,. r..} � �aC r) }��.lrk �� i re. OM1'• J il�tlP A7, 200 : 1 M1 C; I T Y 0 F vie REXBURG- •�+wa�. Review Action April 27, 20,07 Permit Number: 06 00453 Project Name: BYU1 8th Stake Center Project Type. Commercial New Construction - Over 2 Million eView Item Building Type Compliance Water and Sewer Service Plumbing Potable Water Review Plumbing Sewer Drain Review Plumbing Storm grain Review Electrical SerVica Review Energy Conservarton Compliance Review Electrical Circuits Review I Building Type is VB. No. 41011 P - 6 19 E Nbin St, Rexburg. Idaho 8WO Ffiane (2Q8) 359-3020 Fax (208.) 359m3022 z, All plumbing services are required to be inspected and te.5ted before covering. All water lines are required to be tested and inspected, Wader line requires backflow prevention if conn acted within 1500 ft, of a dire suppression line,. � All drains require tasking before covering. I 09/27/2006 09/27/2006 0912712006 09/27/2006 Storm drains are required to be tested and Q912712006 inspected before C*vering. All lines are required to be installed and sized ending to the 2003 Uniform Plumbing Code. (ep Required to bond the gas line to the mein terminal band block. -7 Reviewed the lighting allowance and it meets the 2x03 IECC standards. Approved for permit. � Need to see lighting plan to approve review. Energy Conservation Compliance Review �� Provide efectrical energy review as per the 2003 Intemational Enegry Conservation Cads. Complies with approved Site Plan Review to Site plan his been reviewed. Building Cads Firs Compliance Review Interior Environment Mechanical Review Accessibility Review Exiting Review Structural Review o Meets cads requirements. Wall and ceiling finishes must meet the requirements of !BC Section E103. 13 Meats code requirements. it( Meets code requirements. i i; Please identify exit lighting throughout plans. Provide a letter from the special in$ firm that identifies that inpspections will perfo alon with the intervals. 0312312007 03/23/2007 03/23/2007 03/23/2607 04/02/2007 0410212007 1121wipA- 11MlL�YJ(+��T�fl 04!02/2007 hey !de V., AY 2 4 20 07 (;'I�rjY OF REXBURG AP 27. 2007 8:13AM I`' F REXBURG Amolfa4� April 27, 2007 No. 4 104 P. 7 Review Action Permit Number,: 06 00453 Project Name: BYU1 8th Stake Center Project Type: Commercial New Construction - Over 2 Million Raviaw Itam Waste Water Application Height and Area Review Waste Water Grease Trap Form Misoellaneous lirli=- ;Vrz 1,11,1121AMI'mr_v0xi1nZAi61 11 a truss drawings. The allowable area as par IBC Table 503 for an A3 occupancy in a VB building is 6000 sq. ft. An additional 75% for frontage brings the total up to 10500. Sprinklers raise the sq. footage by 300% to 31500 sq. ft. Area shown is 37713 sq. ft. Please make the necessary changes and Please provide electrical lighting plans. Identify emergency and exiting lighting, 19 E Nizin St. Rexburg, Idaho 8344 Phone (248) 359-3020 Fax (203)359-3022 AP r. 27. 2001 8 ;13AP� 4Qp 46AaopWQ CISY O JRGY A' wily Cxynmunity April 27, 2007 No. 4104 P. 8 19 E Wir, St Rexburg, klaho 83444 Phone (2Q8) 359-3020 Review ActionF" (2-08),359-3022 Permit Number: 06 00453 Project Name.* BYUI 8th Stake Center Project Type: Commercial New Constructionw Over 2 Million RevIew Item0 rte!ke '* Reguimd Fire Flew Water Supply Fire Access Roads Fire Extinguishers Automatic Fire Extinguishing System:5 Standpipes Commercial Cooking Alarm Sy*tems Other Comments Parcel #'s 111 '14 a %6MI MI FA 3 Agtio.n, _mAemm.0 Seg site plan, review. See site plan review. See site plan review, � Firs extinguisher are required through out occupancy. Extinguishers are required to be installed before final fire i � Please submit letter of indent from certified fire suppression contractor. G NIA 7 N/A � Fire warm, requires a voice evacuation system. r� Lock box required for this occupancy. Farm are available at the Rexburg Fire Department,, ,'-- -- rTv 09/27/2D06 09/27/2006 09l27/2006 09/27/2006 D9/27l2006 09127/2006 U9/27/2006 09/27/2006 09/27/2006 XjT--� LU"%F RE [{1 • AP r, 27. 2007 8:13AM CIT REXBURG -- 0— CW — rAeHFWAl ro a numi r. April 27, 2007 No, 41017 P` 9 0 Oke MF : ■ i %"_" Review Action Permit Number: 06 00453 Project Name: BYU1 8th Stake Center Project Type: Commercial New Construction - Over 2 Million RevIew Item Development Standards RaVlaw Development Standards Review Parcel #'s ■ 16 pp i b �•�-P •� I I fi • e � �� • .F I z' a U 4 , INIF,. .. Please submit the following *Infarmation concerning the lighting pian for the site� 1) Liahtino mounted on building must be full cut- off and cannot be used forth lighting the pricing lot. 9 2} Please provide luminance bevel infoation to ensure perking lot lighting does not cross property lines. At least one architectural feature is required to break. up the large upper roof line an the East and West sides of the build'ing. Please submit scetches showing this for review. 19 a Win sts rZ9xburg, 1dah4 53440 Phone (208) 359-3020 Fax (208) 358-3D22 n LL. MAY 24 200J PX8-1, 27. 2001 8:12AM CITY OF REXBUR Arjicri=�.Fauj-ly C4MMUniry April 27, 2007 Permit Number: 06 00450 Project Name: Project Type: Reviewitem 4 No. 410 4 P. 3.____ Review Action BYU1 8th Stake Center Site Plan Review �y il� , r r V4'L Firs Access Roads ,Fire Lane Signage) Addifir onal Comments Water Supply Parva I #'s MAIN V, ALJ NOT REQUIRED IF YOU HAVE ANY ADDITIONAL. QUESTIONS REGARDING THIS REVIEW PLEASE CONTACT CHRIS AT 705-1312. BASED ON 38,148 SQ. FEET (TYPE VaB) CONSTRUCTION THE MINIMUM FIRE FLOW REQUIRED IS 5250 GPM/FOUR HOURS FROM A MINIMUM OF 6 HYDRANTS WITHIN 300 FEET. -SUBM177ED SITE PLAN SHOWS ONLY ONE FIRE HYDRANT -IF BUILDING IS EQUIPPED WITH FIRE SUPPRESSION SYSTEM FIRE FLOW REQUIREMENTS ARE 2625 GPMITREE HOURS FROM A MINIMUM OF 3 HYDRANTS WITHIN 400 FEET. -PLEASE PROVIDE HYDRANT FLOWS FOR ALL EXISTING AND PROPOSED HYDRANTS. SITE PLAN SUBMISSION ON 02/08/07 SHOWS TWO FARE HYDRANTS., PLEASE PROVIDE MORE DETAILS AS OUTLINED IN PREVIOUS COMMENT. 19 F. NbIn stv Rexburg, kiaha 83440 .bone (2(38) 359-3020 Fax (208) 359.3022 I$�% P5011111 09/19/2006 09/19/2006 h AY 2 4 2001 cr 0 10/17/2006 U: 40 I. 2085258381 FIRE PROTECTIUN 3wD IFI'RE PBOT� CllrLIQN, INC* P.O. Box 501545 Idaho fells, ID 83405-0845 Telephonw. 208.525.8377 Fax: 208.525.838i fi P1-"te (;fianC@3d!r1se.(;nM pate. October 17, 2006 To.a Cory Robert� RE ; BYU-J 8"' Stake Center. Fat N From* 522-8785 parol Henscheid THIS TRANSNfIT'1'AL CONSISTS OF PIIS COVERSHEEN' PLUS 4 PAGES) INFORMATION: Cory - Enclosed are water flow test summary sheets dor t1le three hydrants indicated. vn the .sttached site pian. These flows vvexe perfo.rmed-this moarm"ng. If you. have any questions conce�-ning these., please give me a Gall. CV,ii "we braeLues" 6:312 S. Hurggrdl Way PAGE 01/05 zz LID LIF1 M AY 2 4 6NA, TY 0 "w Pt 74� X B U F-1, ir t G ■ r. m 20/1712006 07:40 2085258381 rrR'�Ilrr�� Ku— q.A=M=d T 1 Cn 3 D FIRE PROTECTION PAGE Oc t. 10, 2 0 0 km i Isoc B-%o,,d 'ly Asates, No,~ - s � Ir W. -WIN ollill "IIIIIIIIIIIIIIIIIII111111111 q. fit -e�- I JJ ■ ml=r JL , r � Mob 015,001 Immml 04 M06,, Pill im IN r i it r P ,..r, A. ' r I y et 7 i TROL om. _ .1E�� lrl�fFri�i�l ■UWE JW i 1 :+.�� ■' i wPr""w. riME@ ON ffr■i 1.■Pil■■ melmo— ' 1■4+� In mdffiRRINEENEEN NENEVEMEEN 16P P; WE e jA � .0 r■i ' � k r r i• T a a. 1' JOEIL ' r r� 1I •� -1 �1 �1 h I 1 1 aa r r i j IP I ■ �■ 1'L is ■ ■ ■ ■ JI ■ ■ 210 m . w ■ 1 ila � y ■ � 7 �■ t 1 � � ` ■ � '. _ . � _ ! !Fri - 11 � � �1 1 r i 'i ` .• a !, fM ,+�. Jr �- ■ ` 1 Y 1 �� it - *F X i■a rr f .■ r ■ M 7 ■ Ym+ lr ■ � t qp :A F Vr y i} = •� err ■ i 1 i 1 k : . ■ .. . . i ■� ' a ■+ M t 17 7 ■f� . Pi F� `I `.. q 1y 'E i 1 1 R 1' ■ 1�. ZZ .- . ■ 1 ■ a PT w •ye 1 y���a• F s4P6 P. a ■' 1 � ` y �, �� fI■P�1� IyrPr i 1 ■ �. i r db — sa ®JT rte.-' ■ v T Tri 0— Ord w ■'' i 'a I 1 .51 or p Al t rmommommommmmid hmmmw- 1 i 49 il —1 Ml'1 ��, IV am R� �1 USIN NO it 62/05 ! i■ R i r k� ik r !■lam ■ � R-�.'�� ii� QIP °F r'r b-- J& 2 � Id WAK 91 RSI so/qo A.Dvd NOIiO731M]d 2�ff� G S TeHSZsaoz ov :zo 9006/LT/OT "PT7 5 90OZ/Ll/(3T so/co 39vd NDH0310�ld Cl E TaHs�;SsKr OV :LU. ja Ewa 9007-,/LT/OT 6 LAN 1 3 , /2» PREFORMED EXPANSION �JOINT FILLER TRANSITION SLOPS BACK OF WALK * '-, _ x-� T r _ - - ` - ' - ` • -' . • � •a ' ' . • • * }ry � ;+� .. r ' a • ' .� s- •m + + • i a 50' MAXIMUM- 1/4"' PER - ' a . m 1/2" PREFORMED. JF'-'■ a a a -• q- . a y • r r r . . ' f yI. flU PACING , e � + � • - SIDEWALK. f a EXPANSION JOINT a r 4 FILLED r REQUIRED D AT ALL'IDE a IF -APPROACHES ,�. J • r a a _ q t t q •. Fp i • _ , • m i y■..M P. • � a • + . � a ' ' - ` - � • ' e a � ,* � - _ i a, i - +T! ■ + " r- . a - a i a ' k . - , - .. - • - + a r � rj V J '- e a ' - a -a - i`S- a } • +r } • - -' Ya• •. _ a - y . a . r s + - - �- -' . J• ` + - " + .F )SCAPE TIF a LANDSCAPE STRIP _ a � a +' a � r m rte. • } tix • • • - • t • i ! M r A'L.aF.ia1 a x'. " � - + + - • w • • - F • s � r + ia. - F a } m + a'i , . a . x + • � � � T ' tie • r a + ! y + - r i a + a r ` • +• _ • + - * e - J 01} T i ! y r - i T i r T i -+,F q • x • 4 •' 6 _ + '■ a a + r a -± i '—Cr DRIVEWAY VADTH 3F��1! I l $ n;, _D P Quern q P f`T1 nN TR AN I T1 fRANSI-1710'Np N AT L ■3 TYPICAL DRIVEWAY (LANDSCAPE STRIP) 4 REBARS EVENLY SPACED IN NON—EXTRUDED CURE VAR. SECTION DETAIL NO SCS T 1.3 LINE SEE NOTE #1 REBAR 18- ON CENTER BOTH WAYS COMMERCIAL DRIVEWAY 1. 12" OF GRANULAR FILL (SEE lSPWC STANDARD SPECIFICATIONS SECTION 801 & 802) SHALL BE REQUIRED UNDER ALL. CONCRETE_ ANY ALTERNATE DEPTH INCLUDING NATURALLY OCCURRING GRANULAR BASE MATERIAL ENCOUNTERED MUST BE APPROVED BY THE CITY ENGINEER. 0 t' ■ e' F ., • �'.wya^yy � i ~ e��1 j �- 0.x!7"�• S J�rY.I tiiJd} - yJ�se�r�� tee- •r. �• -}ay�w.er�:�Fs RdA-vi.l,ii.lauewi--:iP �I�^'^� t J 'k er -svi =T•4 - l K E A !. {�f-fir•• y �• $ PROJECT: It�L'Zd7��rG7YYI6rimf ALL CONCRETE SHALL BE CURED WITH A CURING COMPOUND AS SPECIFIED IN THE STANDARD SPECIFICATIONS OR AS PIRECTED BY THE CITY ENGINEER. (SEE iSPWC SECTION 703) TANUARD SIDEWALK WIDTH 15 5 FOOT W/ BROOM FINISH. TANDARD SLOPE 15 1/4"' PER FOOT TO STREET. LACE PREFORMED EXPANSION JOINT FILLED Al' DRIVEWAY CONSTRUCTION ND AT MAXIMUM SPACING OF 50 FEET SIDEWALK. 1-112 SLOPE MAXIMUM it �y� WAS • 4r e. t +, '.i+:, i. , i ,; ,.: �.y .,• , t. •: ,� ,�..... .�u+rm.�eo- .az�r�emtr�.:�s.,_c , --o-r�• ! y.,,.�..::.. �.._ r .: ,:,•.. .. $. d1vF7 �: ., --. .:'�SC{ :r'i. ..T. F}:' _ }..-r:_.-.. ..7, f. :�-_:�.}. 5&.:3:5, }.:.}vmllz,S. - _.,_,,.-rrr„r_..T.. ....--...,„...`' i �,'•”. .Y.,r°.'+?5 ,'�. ,... ..• ' ' •. e�. F.,.-.. F� TITLE: TMCAL DRIVE APPROACHES, SSE SD1.1 Bodily & Associates P.A. � A reb i g fir.;; � , �.; a �� •_.; MAY, 2007 P'ROJEC'T No. �fffIIIIeI/II�.ffl DRA K . CORI. 1 MAY -18-2007 11:52AM F ROM—EN G I NE 9 RE D SYSTEMS o.. TYPICAL UNION--�-- _ � COMBINATION PRESSURE 208-233-0529 T-039 P.002/006 F-835 PRESSURE GAGE 0 — T00 PSI RANGE -GAUGE COCK 2--i/2' SUPPLY -i"U OuiLulNG REDUCING VALVA AICD '7 STRAINER. SET 01SCHARGE: IF 0 50 PRIG_ RUN DRAIN TC FLOOR DRAIN F r DOUBLE CHECK VALVE uHioN (TYPICAL) ^� BALL VALVE MECHANICAL ROOM FLOOR WATER SUPPLY FROM STREET WATER SUPPLY TO LAWN SPRINKLER VERTICAL WATER PRESSURE REDUCING STATION DETAIL L5 MAY 2 4 2'007 TL, 0 F R EX B U R fu"" L m- A 19 2007 11:34AN y • T yi HP LASERJET y FAX 1 P. I r k - ` H113 W'f A ■ PAGE R'C bF 4 MATERIALS REUlSlDt! DUE-T19IlOOi SI3 JI+Ic��3fitCrt�Sl P.!"iA 6�c+hl &.f"nLrC1'GlrThtdL'60 TESTING & FA [_L!a\P703 3 5 - BY U 1 5 C u s�ro m LE) S QP0S L 7 PR0PQSA \bpi -0 INSPECTION • Ll i l 1 i t U 4 tion Materials Testing sp tioris CORY ROBERTS ]PRONEN-F (2M) 522-8779 NIELSON 1130DILY &. ASSOCfATES, PA FAX: (zoS) 522w-8785 PO Box 2212 Idaho Falk, ID 5340.3-2212 . Re,: Te-sti-nu and Ins'pcUion Serv`ces for the . :ProiDosed PToiect: BM $ Custom Stake Center- Rexburg, Idaho Dear Mr. Ro'bertsl The enclo�ed cost proposal hag.been prepared foryour revieur and Materialse�alua�ion_ Testing & Lnspectian, Ines. (XITI) appreciates tlie, opportunity to submit this estina.te to� provide materials testincr and inspection servic-�s an the above refeTenced project The estimate is based. ov..our reNiew of plans,, specifications, sear projects and City of Idaho Falls requir.arnenfs. Thi -estimate is also used on a presumed can�tr�.c�ian schedule. If the construction schedule dries nat follow MTI' estimated production rages and schedute, the quantifies and number of trips required will vary_ Please review the number -of trips and quantities to insure, that each item follows your consiru.cti o n schedWe/production rates. Variances from our estimate and your schc�dulefpxaduction rats wiff be billed at the indicatccl unit rate. The result may ire a decreasu or 6crease in the total testing and inspection'Costs_ Scope of sery-iac,%,s for the tr�ject haeme been autli�eti below:- �3632 0D SF Wood Structu-re'-* The Srope. of Servicesincludes; Z) soils testing and inspection,, 2.) concrete . J. testina and inspedion, and 3) asphalt testing and inspection. The scope mgy be ad` ust�d based on the actual s-pecial ins action re uir�zn.ents. Costs. will be d_ependent -an the actual nufiXber of Wps/dme dor testina and inspecdons&_ - A. detailed explanation of testi.nc-J'insgecti�n item for�each phase of construction has be= provided b(,N,-1ows. Sams -- FI -11 placement monitoring and campaction t -,sting rviii be performed finraughout the project Geateuhnical observations will also be rerforined during stippir?g activities aud at faotin�T baaring surfaces.�' • Concrete —This estimate is baseA an the assumption that structural concrete will b6p.L itsted at the InternatiQr.al Buelding Code minimum intervals �f one set of 4 con�ete Tcylinde�s far each 1 �C} cubic yards car fractiozs hereof of each concrete mix pPatzci each day.. � Asphalt-- Monitoring of placement aid density tesiing will b:. performed. Asphalt cores will be, taken to veru thicImess and density of asphalt and to perform nuclear gauv coRelation. It is NffT,s intention that our services Nvill cornpIement your ef'orts towa-rds rnainfi.auuxag the highest standards of qaal�.ty. Please let us ow if you require additional information. We than.k you for considering our hum and lookfonvard to ivarking with you on this project. RespectfiiUy Submitted, - - I Materials Tegtixxg & Ing ec#iarn, Inc. L� 3 L A. . tl IVI 2 LAO 4 2no -49 rotp#x I 4h Daa Kin(;3' ........... .............. r n Idalio Man- L7gel.4 . ...... J 1230 [4arth Skyline Qr�ve, Ste. G •Idaho Fabs, Idaho 83402 (208) 529-9242 Fax (208) 529-6911 . . _ eirntiQm1Hd.com • wWW.mti-id.00m Form )Xxxac Ray o MAr 19 20071 1 HP LASERJET FnX P. 2 _ r• 3! NnE 42 OF 4 L • L a MATERIALS; _ LD S STAKE DOC INSPECTION' a Y 0 Z1 Envlronme�ltal .�-es 0 l. icer ils Testing �� sti ated Tbo f` I l Dwi n tslimatr, 01 StfVlCeS is based on curreAt IVM standard res and e t lata d project q u t fs _ laspectiari and testing ra cs arb d on Jiisl 1 ca - i r rr r i soh Ett cost m ate' - They will e z r� ent on the tori ct r 1 t �� ' u r [ . s below - P� Word p rm � 1 t x not required day is subject to 1)111cd at 1.5 tmvs the day rats, Hourly rales wiU be ch��, d from pow to pow- Thx3 is a firm and materials o . a of Trips Units 9 of Un lbs Rate Toils So I LS INS PECTI b N TESTING ' Field Dens icy Testing 02922 27 ho urs 11101 54�,00.0 I iT T 18 D each 3 S125,00 $375.00 * is- Coarse Fine 1 1 1TI 1 f T $x`5.00 $225-00 - _ c $75 -OG 0 . X -t r e rg Limits D4318JT89, T190 hours 8 $40.00 $240.00 Sample- 4 hourr. 16 $65.00 $1,040.00 -Staff Geologist Sub -Total. K280.00 CONCRETE INSPECTION & TESTING Concrate Inspector houa 120 $x`0.00 Epoxy BoluDowel Inspector ho un $40.DD Concarete Cylinders 0Z91TZ, each, 1.20 _ Cylinders Pick Up 3D h urs so $40-00 P1400.00 ` Sub -Total F 'MASONRY 11qSPEC710N & TESTING ` F Masonry Inspector hours $40.00 $O.DD Mortar Cyl incfers 3trenath C1 G9fT1 US set of 3 $45.00-$0.00 Grout ' 1set f F CMU r ssiv Strength (Prisms) (Groomed) G1 314 set Df 3 S225. 00, MU Compressive Strengt (BlockOnly) 0140 set Df 3 $75,00 � CMU Absorption, Dainshy & Moisture G140 set of 100. E � . Sub -ill $0.00 STEEL I + TI N & ` E STI N ' ,structural Steel Inspector hc)ur �.()0 $390.00 Ultrasonic Inspection AVVS 01.1 hDura $70,00 $0,00 _ Fab Shop Inspector hDurs $0.00 Firtapfocfing Inspector hours $60,oa $0.00 Bond Test of Fireproofing e a h $25.00 $0.00 Dans it l=i reproofin g ESPOS T e a0h t $0.00 ' Sub -Total $390.00 ASPIAIALTINSPECTION &TESTING Asph aft Field D n i Testing D2922 4- hou rs 32 $40 00 1 �2SO.00 4 alt s ' J , 1 hour $125-00 . 00.0-D . Asph alt CQi-a Specifies Gravity, Height, Diameter, Weight each 1 $25-00 S Z3 a0-0 AsphaltContent-by ] Won Method MS071T308 $100-00 $0.00 Mechanical Analysis D , ° each $55.00 ' Sub -Total S21080o00 Misc. NT - F . - M[lea e -:60, rpilas Roan Trlp 100 miles E50 0 D SO.54 .1240.00 �R Zai �t,•'" R - i ::L! it � f a hours tiTo l $31495.00 EstimatsPe i To Mq$246.001,2 4 . � ..i•1�P.+er+-ai Fasaaa�.w.s„---e_r°-.-err-r-r�, JF - U 1:6 - T .1230 Nom Skyline Drive, Ste. C# Idaho Falls, Idaho.83402 (208) 529-8242 Fax (208) -9.0T6, 11 ' ° • lMtight 1 f d. *. Mfl- - r orpl xxxxx Fav D In. Mir 19 200VI I om 34AM HP LA i i • �k MATERIALS TESTING F: EET FAX PAcwrz #3 OF 4 L ii LIFJYFa DATE 4Y 1'7 1 7 . OPOSALSW KOPDSALSO.AHO FALL! BYU 8 G Usti LDS STAKE.D00 nii 1 fn g L Special s p ton0 n ir nServicessi PROFESSIONAL SERVICESCONTRACT THIS AGREEMENT is made and entered into effective thisIiJlondav, March_ 19. ��C17_�}� �Cl� �2�r����1 THE CHURCH OF JESUS CHRIST OF LATER DAY SAINTS (TLIENT� and MATERIALS TESTING & iNSPECTION, INC. ("CONSULTANT) and is Made wish reference to fh�-" fo[iavLing facts -and objectives: . . RECITALS; CLIENT intends -to have MT1 Perform Spadal Impaction and testing ire accordance with the Proposal jExhlbit r t he RYU1 8 Gustom Stake — ur (hereinafter r fe rrad to a s the 'Pr ') r ■ i e NOW, TH I r i i their mutual r c r� r� f CLIIT r d l i ,CTi (ori r s n r6 f the performance. of rc)f ior� i materials testingarid_ construction inspection services b CONSULTANT a d the pawent for t>� rim CLIENT, T* � forth !ow. Verbal authorization of work activities constitute of this riraposal SCOPE F�E I _ T h -el services to b prformed bCONSULTANT under this described i Exhibit "N' attached a r r r. a ■ •-+ r �E -Jf erato and i t orated herein this ref r n � a though fully set fore. Any .t,rnat� qu nt� i � . nt in d in I ibit nr e tirnal only and CLIENT reel tin t ' > S LT T e entitledt payment for reasona bl er E rendered in c of 1he estimated quantities awflor wsl figures as desGdbad in E ibit ' "F+ PAYMENTS T CONSULTANT. CLIENT email pay CONSULTANT for cervica - rendered hereunder in ac=rdancewith the F and CONSULTANT submit monthly statements for m rendered i ' f r paw n! s heduk attached hereto a Exhi■t �R reimbuTS2blaexpensea incurred_ Administrative a�r l anagemant time for r pDrt review and preparation, schadule changes, ar c th r projee related activities will be added to the inspector sftech ni ian`s time Vii[ monthly atem n is submitted t CLIENT &hall b the time of the billing unless at he mi e specified in this r mentIf CLIENT fails to pay CONSULTANT withinta I It _ thisy (31D). days aNer receipt of monthly :statements f r services ran er d and for_re rnb-ursable expenses incurred, CL[ENT r to pay one ard'a half r nt1. % n irilarest per month until the nr thl t t nt are Pa id in full. CLIENT further agrees that nonpayment of monthly statements c)nd n = r 2 p-eriod cohstitutesmaterial breech of this Agreement with th5 e cep cn Df masonabl'y disputecl amr)unfs that jp,oLn written notice from CONSULTANT, the dam, obliLg@Mons and respansibilifies of CONSULTANT underthis r � ent are t rmIn t _ -in such event GLIENT shall promptly -pay CONSULTANT for all fees, charges and a co outlined i n. Exhibit "A" provided by CONSULTANT up to the d2te of termination. T Ell- SERVICES. GONSUL7i ALIT will act for CLIENT in a prc)fessloral rr, annBr, using that degrae of care and sHl ordinaily exercised b nd r� "r t r t it 1 standards the professional r i � re Ise or similar locality of the Project site. CONSULTANT makes no err ar�t sinner expressed or it pli , a to its findings, r omm ndaticin , specifications r p� i n l i � LT T W111 provide only those sarvices that, in the- c)ption of CONSULTANT, lea within the -techniml and prcfasslortal areas of expertise of CONSULTANT as set forth in Exhibit "A' and which CONSULTANT 'i's adequately cuffed and equipped. to Perform. CLIENT shall Fe�Iu t in writing if CLIENT desires CONSULTANT provide r i outside . of the cope f services d cri i in Exhibit it M , tta h d Loreto. CONSULTANT shall advise CLIENT in vviriting of any rVices: that He out-nidie, thtenlcal. and profossional axpartise of CONSULTANT. • J I '. SAMPLE DISPOSAL, u iM a cs otherwise agreed t c% �r ti r r r f removed r r "r0j t Consultant i laboratory will, upon completion of testing, be disposed, by CONSULTANT. CLIENT r her a rs s the ocst for dispDsalll of Hazardous IV112teri to inn 1jde the cftracfer�izaton costs shall be borne b CLIENT - V., , . UENTi' PONSIBIL[rIE& CLIENT or CLIENTS autheriz cl representatives Wll provide CONSULTANT Mth all revised an • updated plans,a non Benda, change orders, approved s hop. dr2wings and any other inforM tic)n for the proper penrmance of CONSULTANT p urs u nt to this AgreEment. CONSULTANT AI T shat i n t to r sporicide for any. errors and/or Dari ss ons in the parformance of CONSULTAN7S wow orcw0ces rendered resulting ftorn CLIENTS falbre to provide CONSULTANT with revised and and other �� r t� �� proper performance. �U d2t d pl r� ., p xfc tion , Bed .n r , � CONSULTANT. (CLIENT iovill arrange and prDvicle amass to -each area in wbry h it -11 be necessary for CDNSULTANT to perform its o r _ 1. INSURANCE. N LT T shall qecure and maintain throughout the full period of this Agreement sufficient *insurance to prateGt it adequately fmm Glaims under applicable Workmen's rDr p tion Acts and from i ims for bodify injury, death or propeffy darn -age _ may arise fr rn the per-forffance of serVices under this Ci ta.. -ire addition, 00 N LlLTANT shall secure -and maintain throughout the full pe6 d of Agreement sufficient PFaicsal Liability r rlit - insurance to prc)tect it adequately from,-c..1airns arising from errors oy omissmns 4 PrDfaSSi0n2t1 _ . 1 ,tai F = Tl FL4 KgY LTi T� E 1 I �iLITi . CONSULTANTshall riot b responsible fo� and/or � iii � �� r� h y -• T9 oar r rf, � _ _ IT a design of the PrDje t c the failure a n _ ntr to r u ntra for •tc cons Lr� �� t l� th E 1 Prod ct i n c nc T t� t_ Contract documents r o r i n or ae t . ra D is dation cont ined In an c ri p o odea ar ritt n issiddl 6 CONSULTANT. CONSULTANT is not authorized tc revoke, after. ralmx, enlarge r rele'ase any P � _ pe sFitic)n or ether contract documents, nor to approve or accept arty porfi ri of the wort,unless p ifl l l uthonz I n - i ire b • LIE T r his uth rl rep n tali U L-1 ANT til n ot have e dht f r jctir� or the t to stop work. ex pt fi such perk) an may be req ulr to con' duct sampling, testing, or inspection of operallons covered by this r% 17"V n2l r- n 1P rllk f -- I :P S 'j ypJ 3 f y y17yJ '•7Y y,, . 4 2.+ . liA 1, Drive,Ste. _ Idaho Falls, 8Idaho 83402 (20) 524-8242 -K (208) Z? it +l■ :k Rii � 8mf" _ a )DOM Re's 0 + M�ir 13 2007 11 : 3snm aV ■a• *L•sMATERIALS TE TINe•Fi _ �� 9JJ • . . ,SLY tI SPECT10N i Y LnEET FAX p.4 • ' REVIS ON ' DAT I--• 119MhO� T� j'� �j y�. �J'� �y �y1���•_•.yV. F � P 7 0335- RYU 15 C IY L Obi', LD S TAJD'C ' [ = � %ni .l ngin ri n El on ti n l~ rr l Tasting Specs nsp ti0iiS AgreeN�,Hablr r ulli from the asiuns r Ire -tigovernmentala s s dedications, general Including but not hrnit d to, permit pr c rr , n lro ntal impact reports, go a.rnment l hu.d nnti plans and amendments thereto, 7oning mattersir annexations or n lid t o n a use 6r cnRciftional use permits id/ r building permits. SCOPEVill. CHANGES IN OF WORK. CLIENT, without invalldating this r rent may order changes in the scope r character of and/Dr workper-formed by GONSULTANT, either d cr a r or- in r a 1 r i anis ung IJ LT I T work orservices. a. i th Drl and/or services erfor • b 1 L_TA T hall :fie author' d b a ��r� change order- signed b SII �..�� charges � . � � o L I ES T and Y hallperformed under the applicable to and Dr i sorts f this Agreement. l UL7A l T II nObligated perforrn ;any changes; in the 'scope r character o f the work and)or err until CDNSULTANT is j n recelipt of a wiritten Change order s rg ned by GLI E l T "and signed by GO N S U L LACE T l ndi cati ng its a g regiment therewith . Ix. TIMOM .INF UABILITY. Should MT1 or any DI` its pro scion al em playees bla..L fo and to have been neg 11 r,t i n fly e perfo rman its. Work to have rade and breached n rens or implied warranty, represLanLation or cont rt, liana, all parties claiming through li, ��d SII � r l� � Parties clairning to have in ary way relied upon ITT' c�ri-1 agree that the maximum aggregate amount of the iiab llt ,o T1' its ulcers, I is a and agents cull be lim d to ,]DOD- D or the tr>tal amount of the T pail to T1 under thi.G gre m nt or the limit cf any c>ion [` lien t -purchased insurance, iii �� r mount is Y tenter. X. COMPENSATION FOR SERVICES RENDERED. CLIENT recognizes that alae estimate noted in Exhibit "'A7 fit provided) was obtained iiirou h a diligent evaluation of -the ntract documenfs and schecluled discussions wilth the Owner, relevant su L;rtr ct rs and the nSr2l. ntr tOl% CLIENT recognizes that the testing and I inspemion industry, and the services rendered herein under this contract, are h duly driven. and are a andated , bthe scheduling and manning f the ontra ar . Sh uid such items, for exampfe, as 1 h e a quantityoncr t la r n fieldgild or o steel ldi n g lead ule r m awn la r� r� t d Iter from that qu Med t th rn our ro oral, CON S U L'TANT shali be entitled to compensallon for services randered. OVERTIME AND BILLING MINIMUM. CLIENT recognizes the aff ached Exhibit "N which outlives billing minimums of two ) hours for n e . icrendered on site. In addition, CLIENT r =gnizes that, n Occasion* due t the1� ui of the ntr r 0r r l ant - 1tnir�CONSULTANTrll r� ub r1tra r , occasional o e ftim� will encountered. roue to tea nature f r erotica o f fts until th day the said cilmoc r . CLIENT agrees to. c3r- pen.sate CONSULTANT for such ovattme. X11. LIMITATION OF SERVICES PROVIDED. The seMcas provided ur u a rpt io 1 his agreement aria intended Palely for the use and ban eF the LIE T noted above. oar er n �r nti� hall b nlitled to rely n services, opinions, r or mend D0rr , plans.. r Specifications provided pursuant to t r agreement vAthout the 6>cpFessed n cc)nsent of CONSULTANT. Xill. INDEMNITY. CLIENT agrees to dcknmd, indernnify, and Cold CONSULTAWF, its officers, directors, mIo --,--., agents and rods end ni c.ontractors harmless from any and all i aims, suras or liability r personal innar , death, illness, p foiled damage, damage to natural fi ` I 3 resources In or naIt irisin or alleged .fo have -ars n prat f performance f CON LTA Twork to the extent th t u h l rr`n Dr dans gas we Fe due to the negfig "n ce of the CLIE=-N.T, except to• the a fa nt due to gross neg1i genca or Intentionally wrongFul conduct of U CYAN. CLIENT fur'ler agrees to compensate CONSULTANT for all cost, expenses and fees reasonably incurred in defending n such clairni including court ccsts and -attorney's fees., In the event CLIENT -shall bring arty C�ti n a Inst CONSULTANT, + to the extent CONSULTANT prevails in such Fiction, CLIENT shall proViJe the same compensation. KV PROVISIONS SEVERABLE: The unenforceability r invalidity of any provision c r prcwisjons hereof sNall not render any offer provision or ro ion urienfor ea l or invalid. N thin ire the Agreement hall'r lie � � r from its r ��r� i� inti under h � �r contract. This agreernent cont-air,.sthe entire and integrated Agreementbeatween CLIENT and CONSULTANT and supersedes all prior negotiations, r r nta i n'r agreetent-s, thr n or oral. This agreement ren of be amended or modified exoept by a written Agreement, executed by each of h6ew,* partit=..s hereto. This Agreement is cloverelad by the lawss if the state of Ida hOL . , IN WITNESS WHEREOF, the parkas hereto have ex-r1uted,this Agreemerit as cf the date and year filmt above written, it Dorse, Idahc). ACo Itant:Client Materials Testing n u lncw - Compaq Name Lo� niz;f" iK ■....F - a. 0 wl"'.P •. MAY 2 a 2007. Name Tiff* D ate 9 T , 4 a U *� 12 30 N a Fth S kyl in'e 0 �V , _ ' Ida leo Fa lis, I loaf 83402 (20 -8242 Fax 529-60 11 . wwwr + Nielson lBodily& Associates PA `j) �') Architects U TRANSMITTAL -k-way P.O. Box.21212 Idaho Falls, ID 83403-2,712 Telephone 2081522-8779 F 990 John Adams Pai ax 2 0 8/522. - 8 785 Date: March 15, 2007 To.. City of Rexburg 12 North Center Street Subject.- BYIJI 8 Custom Stake Rexburg, Idaho 83440 Center TR.A- NSMITTED HEREWITH: COPDe�c�i�ationles , 1 Site Flan Checklist 1 Buxldzng Permit Application 1 Comm Check - Mech, Elec., Etc I Soils Report 1 FAA Proposed Const- uctioxa Application ,Remarks -- Nielson Bodily & Associates FA MSere 11 Or r ItLL -n U- M AY 2 4 12-007 � � �. r Site Plan Review Checklist Project: Wit_ Permit # nl0 done: � ,•'� �' � c Surrounding Land Uses: L��-I Elevations submitted: yes landscape Plan submitted: \q-05 Lighting Pian submitted: Use Consistent with zoning designation Compliance with Comprehensive Plan Flood Plain Check Plans are to stale North arrow Building Coverage Building setbacks; Front yard - fjCC Side yard Back yard t. V �9 �jDin erg hJ�A.riain �'�'Cpaa t�rYt9r o�t1v�`�°�}. building Height Minimum distance between buildings Clear site tirangfe Driveway, parking lot dimensions Parking space # Parking space sizes Parking isle widths Handicapped requirements Unloading, loading area Parking spaces located in close proximity to buildings Sidwalks along right of way Internal pedestrian walkways 1 n 1 _ Snow storage � Open/common spaces functional? R equ pec[ Cta 9 V Fencing/screening (HVAC equipment, dumpsters, parking, etc.} Trash dumpster shown and screened _'Ln �A 8u (landscaping requirements ? ,t,; I Lighting Design standards �� Committee Meet!ingrHe-ld(if needed t ON 7 f Provided F �a-1� tloie� 4� 'Wjk" NotLj LOOZ/Z/t sluaS yNIozenndlnoi{ltuzsjuasell: dlly=7�(ld�y��xdse•ajge�utad�suzroie��au�s�ut�s[���: d�u suo�}�;uas��daa IE691 1[ue JO; papue1ui }ou sl pue Alu4 sasodlnd ►[etdsip ,so; papue;Ut St dew styl :M3W4briOSSG 13o T a$Ed SIrJ -5mgxag jo S4!D /IclunoD uoscpuW ASPEN ENGINEERING. INC. 10265 N. DORIAN AVE. IDAHO FALLS, IDAHO 83401 (208) 542-1911 PROJECT NAME: BYU-Idaho 8th Stake - 8 ward building PROJECT #: 2006.061 CLIENT: DATE: INPUT Avg. Parcel dimenc. Parcel Area Design storm Required storage Nielsen -Bodily Architects 4/16/2006 EXISTING STORM PEND Perimeter Elevation Dimensions inlet Elevation Max Depth Total pond volume provided Percent usage from this site Hard Surae areas.- Concrete reas:Gancrete Asphalt Roof Total i29 feet 7.48 acres 141926 128,278 39,682 182,886 Hard Surface Percentage of Site EA9 447 feet 325,828.80 s.f. 1.3U inches 35,298.12 cubic feet, 4755 Approx. 4747 Approx. 8 feet 627,264 cubic Feet s.f. (does not include sidewalk at streets) s. f. s. f. 5.f. 56.13 0600450 BYUI 8th Stake Center *��_ V�M:R ■ dppp- 4 ■'lir it Kim for -au # F.0 i .dlL_ . ra ib 4"7 -dP to-# ap ■ , 1 Nielson Date: Subject'.- ra F Bodity.& Associates PA )Architects TRANSMITTAL 990 John Adams Par;waye P., 0. Box 2212 * Idaho .Falls., ID 8340 3 -2212 & Telephone 2081522-87.9 s, cLt 20812 -8 785' September 8, 2006 BYU-I 81h Stake Center TRANSMITTED HEREWITH: To: City of Rexburg 12 N. Center St. Rexburg, Idaho 83440 Copies Description 2 Plans /Specifications I Com Checks 4 Site Plans I Commercial Pre-Consiructian. Checklist I Plan Review Check 13576 Remarks: Nielson Bodily & Associates PA OL7- REXBURG