HomeMy WebLinkAboutSPECIAL INSPECTION 2 - 19-00740 - The Grove at Thomson Farms PH2 - Blackoak - 20 Units - Bldg 5Inspection Date
05/21/2021
File Name
20001DFR05212021HR
Inspector's Signature Inspector's Name
Hunter Redd
Reviewer's Signature Reviewer's Name
E. Vail
Reviewed Date
05/21/2021
09FF728D-B268-4829-B6A3-926A0F53BD99 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name
The Grove
Time Start
11:30 AM
Client
Stillwater Equity Partners
Contractor
Headwaters
Time End
01:00 PM
Inspection Type(s)
Epoxy Embeds/ Anchors
Location(s)
Building 5 epoxy inspection
Observations/ Remarks
Met required specs for project.
Items observed are in general conformance with approved project documents and jurisdictional requirements.