Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 2 - 19-00740 - The Grove at Thomson Farms PH2 - Blackoak - 20 Units - Bldg 5Inspection Date 05/21/2021 File Name 20001DFR05212021HR Inspector's Signature Inspector's Name Hunter Redd Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 05/21/2021 09FF728D-B268-4829-B6A3-926A0F53BD99 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name The Grove Time Start 11:30 AM Client Stillwater Equity Partners Contractor Headwaters Time End 01:00 PM Inspection Type(s) Epoxy Embeds/ Anchors Location(s) Building 5 epoxy inspection Observations/ Remarks Met required specs for project. Items observed are in general conformance with approved project documents and jurisdictional requirements.