Daily Field Report
Project Name
The Grove
Time Start
08:00 AM
Client
Stillwater Equity Partners
Contractor
Headwater's Construction
Time End
10:30 AM
Inspection Type(s)
Concrete Placement
Location(s)
North sidewalk of building # 4
Observations/ Remarks
I first arrived on the site at 6:30 am. The contractor told me that pouring was pushed back at 8:00
am.
I returned back at at 8:00 am. I tested the concrete and reported to both the contractor and the truck
driver.
Items observed are in general conformance with approved project documents and jurisdictional requirements.