HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 3 - 19-00731 - The Grove at Thomson Farms PH2 - Hickory - 30 Unit Bldg 4Inspection Date 05/24/2021 File Name 20001DFR05242021YK Inspector's Signature Inspector's Name Yannick kabwika Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 05/24/2021 345b909c5362d83b-1621871615266 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name The Grove Time Start 08:00 AM Client Stillwater Equity Partners Contractor Headwater's Construction Time End 10:30 AM Inspection Type(s) Concrete Placement Location(s) North sidewalk of building # 4 Observations/ Remarks I first arrived on the site at 6:30 am. The contractor told me that pouring was pushed back at 8:00 am. I returned back at at 8:00 am. I tested the concrete and reported to both the contractor and the truck driver. Items observed are in general conformance with approved project documents and jurisdictional requirements. New Multi Photo