HomeMy WebLinkAboutLETTERS - 06-00400 - Premier Performance - RemodelOr/ 021" 20x6
31 1
nDes[n tellge� �e LLC
Stru'u'fur.lEngineering �
i
1'037 $r1lrsvre Drive
Rexburg, 1dch.* pdjQ
Date: September 29, 2006
TO-' City of Rexburg Building Departmen-t
Sub�ect: Premier Pi-oduct, Remodel
Dear F
S r :
PREMIER PERFORMANCE
11'
P G ' 01
Premier Performance Remodel
Callow—p08) 3594461
FAX: (208) 359-0740
I have reviewed the exiting buddling laYout along with the lap a fo��owingcvmme�nts�y ut a�the new addt�ton and have the
The- second door addition provides additional workspace o� the
main floor. same occVancY tYPe (13) that exisis on the
The existing mein floor space belovAir the new isccond hoar addition has
separated by a one hour constructed walls. �'�,e storage area isbelow t the business �-ca and �coragc arca
cci�in� of ��e main floor storage area shall also he nne hnurE.-re. x� he new addr#ian therefore the
r�C� Canstnzctxan_
The second floor has two exits provided by the two stainva s one exis6ng�' � and one new.
The second fl
0or walls have windows spaced close- than 50 feet tie need asise�s.and �xovid� access tv ,fire depaytMent if
111y Upixiiuu Lhdt [he new addition as described above meets there uir�
q mens Of the cede.
Ple:aze call if you have, any further questions.
Respectfully,
Scott A Spaulding, P
Leslgn inte]ligencq� ; LL
E C E I E
0
OCT 2 2006
�-r
CITY OF REXB-.,JRG
I
0
6en7 B: Design Intelligence, L •
Des
fngteelltgejzce, LLC
Structural Engineering
J 7 EriAsonDrive
Rexburg., Idaho $3440
Date. October 1 7, 2006
To: Val Christensen
City of Rexburg Building Dep&rtnielit
Subject: Premier Performance Remodel
Dear Sirs;
- '-9-0740;
Oct -17-06 11 r 1 M-
Ca[l: (208) 359-7461
FXY6- (l08) 359-0740
rl• il, it
gage
Premier Performance
I have previewed the construction of the existing poilion of the building with Parley Va ora anal am
sa#�sfied that there are sufficient shear walls to meet the requirements of the code and to assure that the
interiar of the building isnot dependent an the steel structure of the bwlding for its support..
Please call if you have any ftiTther quest -ions.
Respectfully,
I
DY, uesign Intelligence, LLC
WL -
am
-V
208-359-0740;
Des gn
Intelligefice, LLC
StructuralEngineering
1031 Erikson Drive
Rexburg, Idaho 83440
Date: October 17, 2006
To: City of Rexburg Building Department
Pages: 2 including Cover
Subject: Lette'r'. for Premier Performance
Message0
:
Please call if you have any quest"vns.
Thanks,
Scott A Spaulding, P.E.
President Design Intelli
Bence, LLC
f'dsfd I
Oct -1-0 11 :1f•
Cal[: (208) 359-1461
FAX,- (208) 359-0740