Loading...
HomeMy WebLinkAboutLETTERS - 06-00400 - Premier Performance - RemodelOr/ 021" 20x6 31 1 nDes[n tellge� �e LLC Stru'u'fur.lEngineering � i 1'037 $r1lrsvre Drive Rexburg, 1dch.* pdjQ Date: September 29, 2006 TO-' City of Rexburg Building Departmen-t Sub�ect: Premier Pi-oduct, Remodel Dear F S r : PREMIER PERFORMANCE 11' P G ' 01 Premier Performance Remodel Callow—p08) 3594461 FAX: (208) 359-0740 I have reviewed the exiting buddling laYout along with the lap a fo��owingcvmme�nts�y ut a�the new addt�ton and have the The- second door addition provides additional workspace o� the main floor. same occVancY tYPe (13) that exisis on the The existing mein floor space belovAir the new isccond hoar addition has separated by a one hour constructed walls. �'�,e storage area isbelow t the business �-ca and �coragc arca cci�in� of ��e main floor storage area shall also he nne hnurE.-re. x� he new addr#ian therefore the r�C� Canstnzctxan_ The second floor has two exits provided by the two stainva s one exis6ng�' � and one new. The second fl 0or walls have windows spaced close- than 50 feet tie need asise�s.and �xovid� access tv ,fire depaytMent if 111y Upixiiuu Lhdt [he new addition as described above meets there uir� q mens Of the cede. Ple:aze call if you have, any further questions. Respectfully, Scott A Spaulding, P Leslgn inte]ligencq� ; LL E C E I E 0 OCT 2 2006 �-r CITY OF REXB-.,JRG I 0 6en7 B: Design Intelligence, L • Des fngteelltgejzce, LLC Structural Engineering J 7 EriAsonDrive Rexburg., Idaho $3440 Date. October 1 7, 2006 To: Val Christensen City of Rexburg Building Dep&rtnielit Subject: Premier Performance Remodel Dear Sirs; - '-9-0740; Oct -17-06 11 r 1 M- Ca[l: (208) 359-7461 FXY6- (l08) 359-0740 rl• il, it gage Premier Performance I have previewed the construction of the existing poilion of the building with Parley Va ora anal am sa#�sfied that there are sufficient shear walls to meet the requirements of the code and to assure that the interiar of the building isnot dependent an the steel structure of the bwlding for its support.. Please call if you have any ftiTther quest -ions. Respectfully, I DY, uesign Intelligence, LLC WL - am -V 208-359-0740; Des gn Intelligefice, LLC StructuralEngineering 1031 Erikson Drive Rexburg, Idaho 83440 Date: October 17, 2006 To: City of Rexburg Building Department Pages: 2 including Cover Subject: Lette'r'. for Premier Performance Message0 : Please call if you have any quest"vns. Thanks, Scott A Spaulding, P.E. President Design Intelli Bence, LLC f'dsfd I Oct -1-0 11 :1f• Cal[: (208) 359-1461 FAX,- (208) 359-0740