Loading...
HomeMy WebLinkAboutSTAFF REVIEWS - 06-00365 - American Construction Supply - Site PlanCITF REX.BURG CW America?' Fatnil)p Community September 1, 2006 Review Action Permit Number: 05 X0365 Project Name: American Construction Supply -Site Plan Project Type: Site Plan Review Reviewltem Actions Required for Ai Building Department Review Fire Separation Setbacks and Propertly Lines Number of Parking Spaces Parking Configuration Snow Storage Plumbing Review I Ii mm- "_ I nova Meets code and ordinance requirements. Meets code and ordinance requirements. 6 spaces required, 14 provided. Parking is not screened from streets. The Guilder instructed me that the Planning/Zoning guard ok'd the parking lot as is. 1 am turning this over to Jahn Millar of P&Z. There is plenty of room dor snow storage. 19 E Main St. Rexburg, Idaho 8344 Bane (2Q$) 359-3{}20 Fax {208} 359-322 0 0 07/26/2006 08/21/2006 08/21/2006 08/21/2006 08/21/2006 a 5 $_;O CITY 0 F September 1, 2006 io Permit Number: 06 00365 Project Name: Project Type-. Review Item Review Action American Construction Supply -Site Plan Site Plan Review Fire Department Review Fire Access Roads Fire Lane Signage Additional Comments Water Supply Parcel #'s 02���W �11 �U W- 19 E. Main St. Rexburg, Idaho 83444 Phone (248) 359-3020 Fax (z08) 359-3022 ions Required for_Alpproval- Approved Access provided with public roadway. Not required Please address rioted items. For questions regarding this review contact Chris at 705- 1312. Site pian shows one fire hydrant. Based on 6000 square feet, type V-13 construction, B and/or S occupancy fire flaw requirements are as follows.6 1. if building is required to have a dire sprinkler system: Minimum of two hydrants capable of flowing a minimum of 1500 GPM/two hours within 450 feet of structure. 2. Building not required to have a fire suppression system: Minimum of two fire hydrants with a minimum flow of 20(}D GPM/two hours within 45n feet. 07/27/2006 07/27/2006 07/27/2006 ?r 4 %13 �e CITY 0 F RE)MURG jerka� i4mily Community September 1, 2006 Review Action Permit Number: 06 00365 Project Name: American Construction Supply -Site Plan Project Type: Site Plan, Review Review Item Planning Staff Review Approved Site Pian F�il"N 19 E. blain SL Rexburg, Idaho 83440 Phone (208) 359-3020 Fax (2a8) 359-3022 rkctiDn$ Me�uired tar Approval Approved 1. Any lighting plans need to be aproved by 08/22/2006 John Millar. 2. Landscaped area is insufficient. At lest 10 percent of the lot is required to be maintained in landscaping. W2 El CITY OF E , R XBU RG_. Anierica's' Family Community August 22, 2006 Review Action Permit Number: 06 00365 Project Name: American Construction Supply -Site Plan Project type: Site Plan Review Review Item Actions Re_ Public Works Review Approved Site Plan Parcel #`s 1. Conditions approved by the Planning and Zoning on design code issues must be met. 2. the fence along Jet Stream Drive must be no closer than the setback line. 3. The areas shown for landscaping must be completed prior to an occupancy perm -it being issued. RO Box 280 19 E_ Main St Rexburg, Idaho 83440 Phone (208) 359-3020 Fax (2D8) 359-3022 08122/2006 y'zwL n, F.i� P'�Fj XB'URG ............................ April 21, 2008 OOON{ PLO Box 280 19, E, Main St. Permit Number: 06 00366 Project Name: Project Type: Rexburg, Idaho 83440 Phone (208) 359-3020 Review Action Fax (208) 359-3422 American Construction Supply Commercial New ReAkew Item PlanningSta''ff Reviiow Development Standards Review Parcel #'s RPRAIRCP010060 Actions 1 Design of building discussed in 8!17106 PAZ Meeting. Developer agreed to the following-: 1. To put in two windows along the side of building to break up the facade. 2. Set the fence back 15 feet from right of way and landscape around if. 3. Pedestrian connection from right of way sidewalk to entrance sidewalk not required. 4. 6 foot landscape strip between building and sidewalk not required. Approved 08/22/2006 CITY �{ -. .....,..-.� —'--rte •�-r�.r.��-..------.- RF-,?X,zB s.rr..r._...r:.............. ;--- April 21, 2008 Review Action Permit Number: 06 00365 Project Name: American Construction Supply -Site Plan Project type; Site Plan Review Review [dem Acts 4 Approved Site Plan Parcel #'s R-PRAIRCP,010060 0 royal 1. Conditions approved by the Planning and Zoning on design code issues must be met. 2. The fence along Jet Stream Drive mush be no closer than the setback line. 3. The areas shown for landscaping must be completed prior to an occupancy permit being issued. RO Box 280 19 E. Main St Rexburg, Idaho 83440 Phone (2D8) 359-3020 fax (208) 359-3022 Approved 08/22/2006 . _% 7 r a (11 1 T F RLi -U,- URG .......a.w.e.,........,. .. ............... April 21, 2008 Review Action Permit Number: 06 00365 Project Name.:Amencan Construction Supply -Site Plan Project Type: Site Plan Review Review Item Approved Site Plan Parcel #'s RPRAIRCP010060 Actions Required fi royal 1. Any lighting pians need to be aproWed by Sohn Millar. 2. Landscaped area is insufficient. At least 10 percent of the dot is required to be maintained 'm landscaping. 19 E Main St. Rexburg, Idaho 83440 Pone (208) 359-3020 Fax (208} 359-3022 08/22/2006