Loading...
HomeMy WebLinkAboutJOIST - 06-00360 - 752 Nina Dr - AdditionIMPORTANT PLEASE READ AND SIGN THE ATTACHED SHEET BEFORE TAKING POSSESION OF YOUR LAYOUT! READ BY INTIALS DATE NG REQUIREMENTS TJI®loists at bearings: Two 8d (2Y") box nails (1 each side), 1 Y2" minimum from end. Blocking panels, rim joist or rim board to bearing plate: TJI® blocking panels or rim joist: 10d (3") box nails at 6" o.c. Trus Joist rim board: Toenail with 10d (3") box nails at 6" o.c. or 16d (3Y2") box nails at 12" o.c. Shear transfer: Connections equivalent to decking nail schedule Rim board rim joist or closure to TJI® oast: IY4" width or less: Two 10d (3") box nails, one each at top and bottom flange. 21116"thru 2112" widths: Two 16d (3112") box nails, one each at top and bottom flange. 31/2" width: Toenail joist to rim joist with one 10d (3") box nail each side of joist top flange. 2x4 minimum squash blocks: Two 10d (3") box nails, one each at top and bottom flange. ( t W Pon - DO NOT allow workers to walk on joists until braced. INJURY MAY RESULT. WARNING Joists are unstable until braced laterally Bracing Includes: • Blccs ny • Sheathing • i -v qws • Rim Board • Strut ones • Rim Joist WARNING NOTES: Isi DO NOT stack building materials on unsheathed joists. Stack only over beams or walls. Lack of concern for proper bracing during construction can result in serious accidents. Under normal conditions if the following guidelines are observed, accidents will be avoided 1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI m Joists must be completely installed and properly nailed. 2. Lateral strength, like a braced and wall or an existing dock, must be established at the ends of the bay. This can also be accomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of Wsts at the end of Ne bay. 3. Safety bracing lines of 1x4 (minimum) must the nailed to a braced end wall or sheathed area a9 In note 2 and to each joist. Without this bracing, bucking sideways or rollover is highly probable under light construction bads - like a worker or one layer of unnailed sheathing, 4. Sheathing must be totally attached to each TJI a Win before additional loads can be placed on the system. S. Ends of cantilevers require safety probing on both the lop and bottom flanges. 6. The flanges must remain straight within a tolerance of X' from true alignment. R ECEE WE JUL 1 72006 D CITY OF REXBURG A complete TJ -%pert framing plan requires the Trus Joist Framer's Pc See Trus Joist Framer's Pocket Guide for Product Trademark lr.- T A3 TJ•Xpert, LEVEL NOTES File Name: 60 -Jim Bollinger Addition 070706.JOB Level Name: Main Floor Plotted: 7/7/2006 11:04 Design Statue: Main Floor... 7/7/2006 11:03 NOTE: Level design times indicated above assurance for proper level stacking, Design Methodology: ASD Floor Area Loadin0 Is: 40psf Live Load and 12 Ralf Dead Load Maximum Joist Deflection: L/4B0 Live Load 1/240 Total Load TJ -Pro Ratinq Information: Weiahted Averaqe: 61 Lowest Ratlnn: 61 Richest Rating: 61 Glued 4 Nailed Deckinq is Required Direct Applied Ceiling is Not Rewired Floor Decking: 23/32" Structurwood Edge Gold (29" Span Rating) Normal O.C. Spacing = 16 -- -Unless noted otherwise Scale: 1141' = 1' JOB COMMENTS 60 -Jim Hollinger Addition Rexburg, Idaho SYMBOL LEGEND Line Load Area Load ODetail Callout Label (See Framer's Pocket Guide) JOIST AND BEAM LIST Plot ID Length Product Plies Qty A See Layout 11 7/8" TJI 110 joist 1 ACCESSORIES LIST Brill Shl Rm, Rim 16' 9' x 1' Board 1 1/4" x 117/8' 1.3E TimberStrand LSL 23/32" Structurwood Edge Gold (24" Span Rating) 1 6 1 19 LEVEL NOTES File Name: 60 -Jim Bollinger Addition 070706.JOB Level Name: Main Floor Plotted: 7/7/2006 11:04 Design Statue: Main Floor... 7/7/2006 11:03 NOTE: Level design times indicated above assurance for proper level stacking, Design Methodology: ASD Floor Area Loadin0 Is: 40psf Live Load and 12 Ralf Dead Load Maximum Joist Deflection: L/4B0 Live Load 1/240 Total Load TJ -Pro Ratinq Information: Weiahted Averaqe: 61 Lowest Ratlnn: 61 Richest Rating: 61 Glued 4 Nailed Deckinq is Required Direct Applied Ceiling is Not Rewired Floor Decking: 23/32" Structurwood Edge Gold (29" Span Rating) Normal O.C. Spacing = 16 -- -Unless noted otherwise Scale: 1141' = 1' JOB COMMENTS 60 -Jim Hollinger Addition Rexburg, Idaho SYMBOL LEGEND Line Load Area Load ODetail Callout Label (See Framer's Pocket Guide)