HomeMy WebLinkAboutRESCHECK - 06-00352 - Parkside Townhomes - Bldg #16 4 UnitsIWScheck Compliance Certificate
2003 IECC
REScheck So$ware Version 3.5 Rebase Z
Data filename: D:IMECH1Parkside 16.rek
PROJECT TITLE: Parkside fiownhomes Building 16
CITY: Rexburg
STATE: Idaho
NIDD: 8693
CONSTRUCTIQhT TYPE: Multifamily
WINDOW 1 WALL RATIO- Q. 16
DATE: 06i16i06
DATE OF PLANS: June 16, 2006
COMPLIANCE Passes
Maxirnurn LSA = 779
Your Home UA = 704
9.6% Better Than Code ([.TA)
Ceiling I - Flat Ceiling or S cissor Truss
Wall 1. Wood Frame,16
t
W 1dw l . Vinyl Frame. -Double Pane
Door 1. Soli
Door 2: Glass
Floor 1: Ail -Wood Jost/Truss:Over Unconditioned Space
Floor 2: All -Wood Joist/Truss: over Outside Aix
Fwnace 1: Forced Hot Air, SO AFUE
06 00352-06 0035s,�
Parkside Townh
omes
Checked By/Date
Gross
Glazing
Area. or
Cavity
Cont.
or Door
Pcrimetcr
L-,Va.1Pe
R -Value,
--F act r
UA
2380
35.0
0.0
71
3$70
19.Q
0.4
190
SSI
0.500
276
72
0-170
12
80
0.500
40
2278
19.0
0.4
107
778
19.0
0.0
$
COMPLIANCE STATEMENT: The proposed bu ld'.rng design described here is consistent with the building pIan
SpeGifiCatians, and Other CalCulatipns submitted with the permit application. The proposed building has been designed to
meet the 20 3 IECC requirements in REScheek Ve�-s�an 3.6 Release 2 (brmerly MECcheek) and. to comply with the
mandatory �uirements listed. in the RESc}�eck linspection Checklist.
Builder -/Designer
Date
J U L - 5 2006
CITY's
•
yfi .
REScheek Inspection Checklist
2003 IECC
REScheck Soffwaze Version 3.6 Release 2
DATE: t]6116106
PROJECT TITLE: Parkside Townhomes Building 16
Bldg. �
Dept. j
Use J
I
� CeiIings:
I. Ceiling 1: Flat ceiling or Scissor Truss, R-38.0 cavity insulation
J Comments:
i
� Above -Grade Walls:
t � � 1. Wall 1: 'Wood Frame, 16" ox, R-19.0 cavity insulation
� Comments:
1
Windows:
� ) � I. Window 1: Vinyl Frame:Double Pane, U -factor: 0.500
I For 'windows without labeled U -&tors, describe features;
� # Panes Frame Type Thermal Break? [ ]Yes[ ]No
j Comments:
l
� Doors:
� J I 1. Door 1: Solid, U-iactor: 0.170
�
Comments-,
� J � 2. Doer 2: Glass, U -factor: 0. 500
� Comments:
� Floors:
I. Floor 1: All -Wood Joist/Tniss.- Over Unconditioned Space, R-1 9. 0 cavity insulation
j Comments:
Z. Floor 2: AlI-Waod Jot stlTruss.Over Outside Air, R-19.0 cavity insulation
j Comments:
I
j Heating and Cooling Equipment:
1. Furnace 1: Forced Hat Air, 80 AFUE or higher
� Make and Madel Number
f
j Air Leakage:
[ ] 1 Joints, penetrations, and all other such openings in the building envelope that are sauces of
ai�-
i leakage must be sealed.
C ] f recessed lights must be 1} Type IC raid, or 2) installed inside an appropriate air -tight assembly
� with a O.S'° clearance from combustible materials. Ifnon-IG rated, the fixture must be installed with a
31F clearance from insulation.
f
�
Skylights:
1 f Minimum insulation requirement ibr skylight shads equal to or greater than 12 inches is R-19.
Vapor Retarderp
Required on the warm -in -veinier site of all non -vented framed ceilings, wads, and goors,
Materials Identification:
Materials and equipment must be installed in accordance with the manufacttuerls installation instructions.
Materials and equipment must be identified so that compliance can be determined.
Manuflcturer manuals fDr all installed heating and cooling equipment and service water heating
equipment must be provided.
InsuIativn R -values, glazing U -factors, and heating equipment elfficiency muni be. clearly marked on
the building plans or specifications.
Duct Insuiatian:
Supply ducts in unconditioned attics or outside the building must be insu�ateci to R-1 1.
Return ducts in unconditioned attics or outside the building must be insulated to R_G.
Supply ducts in unconditioned spaces must be insulated to R-1 1,
Retum ducts in unconditioned spm (except basements) must be insulated to R-2.
where exterior walls are used as plenums, the wail must be insulated to R-1 I.
Insulation is not required on return ducts in basements,
Duct Construction:
Duct connections to ffanges of air distribution system equigment must be sealed and mechanically fastened.
A11 joints, seams, and connections must be securely fastened With welds, gaskets, mastics (adhesives),
mastic-plus-cmbeddnc, or tapes. Tapes and mastics muni be rated UL 181 ,. or UL 18 1B.
Exception: Contlinuously welded and hacking -type longitudinal joints and seams on duct
operating at less than 2 in. w.g. (500 Pa).
The HVAC system must provide a means fc)r balancing air and water systems.
Temperature Controls:
Thennosiats are required for each dwelling unit (non -dwelling areas muss have one thermostat for
each system or zone). A manual or automatic mens to partially restrict or shut affthe heating
and!`or cooling input to each room shall be provided.
lectii c S YS terns
S p to electlic Meth. are ]required for each divelling unit,
Service Water Heating:
Water heaters with vertical pipe risme must have a heat trap on both the Inlet and cutlet unless the
water heater has an integral neat trap or is part aha circulating system,
Insulate circulating hat water pipes to the levels in Table 1_
Circulating Hot Water Systems:
Insulate circulating hot water pipes to the levels in Table 1.
swimming Pools:
A11 heated swirriming pools must have an on.la$'heater switch and require a cover unless over 20%
of the beating energy is fram non-depletable sources. pool pumps require a time cork.
Heating and COOS% . Insulation:
QAC pig' i n.9ul ds above 10-5 T
bevels in Fable 24 --------�-� •�M.�� ��.v� �a 1I'luNt ve insulatetl to the
Table I.- Minimum Insulatinn Thicknessfor Circulating Hot Water Fipes.
insulation Thkkness in In .hesbv Pine 91'
Hewed w ater
170-180
1,40-169
100-139
Non-Circulati
L I
to
1 rr
1
o.5
0.5
0.5
' i r
Table 2: Minimum Insulation Thickness fns HYAC Pip es.,
Fluid Temp- Insulation 7
Pi in aystem Typ,Q Rangg.(F) 2" Runauts
Heating systems
Low Pressure/Temperature
Law Temperatue,
Stearn Condensate (br J�ed water)
Conlfng Systems
Chilled mater, Refrigerant,
and Brine
t
=outs
201-250 1.0 1.5 1.5 10
106-200 0.5 1.0 1.0 1.5
40-55 Q.5 Q.5 0.75 1.0
Below 40 1.0 1.0 1.5 1.5
NATES TO FIELD (Building Department Use OnIy)
I Ir and LQ
1.. ?7
to 2,1
2.51t
201-250 1.0 1.5 1.5 10
106-200 0.5 1.0 1.0 1.5
40-55 Q.5 Q.5 0.75 1.0
Below 40 1.0 1.0 1.5 1.5
NATES TO FIELD (Building Department Use OnIy)