HomeMy WebLinkAboutDOCUMENTS - 06-00348 - Trejo Professional Plaza - Bldg #2Address Assignment Form
City of Rexburg
Name: �A N �"
Assigned by:
D Current Address
El City of Sugar City
� Madison County
Date: 01
El LeLgal Description D
i
Parcel No.
Address: Parcel No
Subdivisi'OnOAa Block: Lot-
City
Block: Block: Lot:
New Address:
Additions! Informatian:
10+
amici
I
a
ST
r.�
G
T� -� j0
x
Cl
Madison County / City of Rexburg GIS
CL
q
�i
1
,eD
Y L
CL
LA
http:Ilagentsmithlintranetlarcimslprzntable.aspx?apURL=http:/lagentsmithloutputlarcIMS ...
Page 1 of 1
M
R E..XB
J.-
Apricrica'.5 Faty
DATE: B /�
City of Rexburg 'TO:
P.O. Box 280
19 East Main
Rexburg, Idaho 83440
Phone: (208) 3 59-3 020
FAX: (208) 359-3024
FROM:
Message.
NAME:
4
FAX TRANSMITTAL FORM
FAX NUMBER:
PHONE NUMBER:
NAME: JANELL HANSEN
PHONE NUMBER: x 326
i
if,
Please forward this .fax transmittal to the above named individual,
r
STATE OF IDAHO
DEPARTMENT OF
ENVIRONMENTAL, QUALITY
900NO-PTH SKYLINE DRIVE, SUITE 3 • 11DAH0 FALLS, IDAHO 83402 • 208 2B-
2650
July 7,, 2006
Terry Bagley
Bagley Enterprises
423 S. Yale
Rexburg.,ID 83440
JANE'S �E, RISCH, GOVERNOR
TONT H RDE , DIRECTOR
Re: Trejo Professional Park Division #2 Water and Sewer Line Design, Rexburg ID, DEQ 6_p6_33
Deer Mr. Bagley
We have reviewed the plans and specifications for the proposed water and sewer design. 7'he project plans and
specifications appear to meet State standards and are approved.
Our approval is for the design. We will give, final project approval after the systems are constructed. Deviations
from the approved design that might result in violations of Idaho Regulations must be reviewed by this office
before field ihstallation. Please keep this office infflrmed of the scheduling of all -construction phases so that we
can make spot inspections as necessary.
Within 30 days after construction.'a professional engineer registered in the State of Idaho must provide this office
with as -built plans, or a letter of certification stating that the project was installed substantially according to the
approved design. g
A copy of the approved design and specifications will be kegs an file at this office. Please reference DEQ Na. 06-
06-33 when submiiting any future correspondence related to this proect. If you have any questions regarding this
letter or if we can be of further assistance, please call me at (208) 5&128-2650.
Sincerely,
William Tett,<&'her PE
Water Quality Engineer
Idaho Falls Regional Office
C: Jamey Johnston, Regional Administrator
John Millar PE. City of Rexburg
Paul Scoresby PE, Schiess & Associates
Christy Swenson, D7HD IF
Chris Critser, Stage Plumbing Inspector
-06,33 Trejo Professional Park div.
• _ 47 it �"
W
200523"6322
Telephone: (206) 523-6978
TO: Mike
C0: DAFA9
PROJECT-,Ragle
Professional Buildin
PAGES SENT INCL. COVER:
REMARKS:
G & S Structural Engineers
1600 John Adams Parkway
Suite 200
Idaho Falls, ID X3401
E-maPl: 9s@dataway.net
FAQ
ONE
DATA` RAnnrtM
PROJECT #;
Qnrlri rz� Dom'
[A oo1ioQ1
Fax�(208)523-6922
January 2.9, 2007
6234
PLEASE CALL IF ALL PAGES ARE NOT RrCEIVED
Mike, per my discussions with John from the Rexburg Building Department it is my understanding
fhat the ho1downs on the North and South wally are �rastalied i ncorrectly,
The holdowns located on the sides of the windows must be anchored to two confifnuous studs in
order for the holdowns to perform as designed. As I understand, the hpldowns are anchored to the
crIpple Muds that extend only up to the underside of the window silk (approximately 24"')T��attachment wMll not tra�fer tie necessary fvrces (5, �DO lbs of u�iiift).��r�
The holdowns located on the end of a sheer will pe I that i� lvC�ted on a corner must be ofiented
so that the holdown is anchored to the? two continuous studs within the shear wall panel. As can be
noted on our drawings the loc3tion of the holdown is indicatLad with a triangle. If the hoedown ;s
located around the corner, rather than as Ih1111Qwn, than the connection between the shear wall
and the two continuous studs must be designed to transfer the uplift forearound the corner framingpanel
(51100lbs.). The connection for load tr n fe-r his to oon both faces of the shear wall due to the
North and South walls requiring P1YW00d/0SB sheath-ing on each face.
used upon my undersiandinhaidown anchorwe to the shear wall panel and/or the location
of the hoedowns; the holdowns as installed are inadequate and need to be redone,, /
ik
Cc.; Kurt Karst — Alderson, Karst & Ktro Architects
John Berry — Rexburg Building Department
i
1 i� i4 20G52OUG922'
Telephone: (20,B) 523.6918
STRUCTURAL ENGRS
G 8. S Structural Engineers
1600 John Adams Parkway
Suite 200
Idaho Falls, ID 83401
E-mallbor gs@Ddataway.net
FAX
70: Mike FROM: Mark D. Andrus PE
NNOMMMI, . ,
PROJECT:
Bgaley- Professional BuIldin.
DATE: Thurscla
janua
PROJECT #: 06234
a001/004
Fax: (208) 523-6922
11,_2007
PAGES SENT INC. -L. COVER: Four PLEASE CALL IF ALL PAGES ARE NOT RECEIVED
REMARKS:
Per our telephone conversation earlier today if is my understanding that the seismic holdowns that
were installed for the above referenced building were not the holdowns Specified on the structural
drawings dated 9-G-06. Furthermore, from our conversation, the holdowns that were installed were
not installed per the requirements of Simpson Strong -Tie.
Both the current ho1down instaliatian and the holdown hardware are inadequate dor this building.
The holdowns heed to be removed and the specified holdowns installed. Due to the installation of
the incorrect holdown, care will have to he liven to provide the proper attachment of the correct
holdown. The specified holdown uses Simpson SE)S wood screws �Laa screws are not � suitable
substitute.), thus the holdown will have to be positioned sway frim the Egg screw holey that were
drilled for the lncorrect holdown.
Enclosed please find a copy of the holdown schedule that was provided with the contract drawings
and a copy of the Simpson Strong -Te catafag showing the holdown that needs to be instalied.
Also enclosed is a previous fax dated 121ml 2--06 describing That the specified holdowns are required
and the requirements for post installiqg the anchor bolts.
Sind
Mark D. Andrus, PE
Cc..ff Kuri Karst — Alderson, Karst $ Mitro Architects
1
202522GS122
I I I J 1 11 �I IJ II J 1
I I I J I S I
I I 1 r I ijir_jL Y I r It 1 r1 II 1 I.I 1 I
11 1 I I I J J 1 1 J I I r
r I' f I r 1 III
a I I I J I 11 1 III I J ' I 1 1 1f ] I 1 1
1 I [I +r I f1 I I I 11 di u. r i
ar B c a binotioa of thash W0Jf 1161
Tile HOU' sodas of holdowris cormln.s the of to
dellmllon aild 111011"I � ipWty from tPa pre -loll l:56 gonmarV viijt,j ilio
case nl Jn ��lla�lOn of nip., o:� s patica I -ed SSS -rnv4t r
HUU EI1, FEATURES
*ire -d fie c tp body virtually ll 1 n to dafl o ctio n d ua
to m5ter ;l Eitret hY
i Uses !SDS screws whIch Install aLisIly, WoMS fastonisr slip,
and providas a greater net santi n area 01 tljq pOST
Com r1rad to bolts.
SDS 114'1411w,' crews are supplied ijl the holdowns.
Lag ! craws will ngt g hiove f�jq soma jar7dj TIT errsurus lhu
prnpor felst,.,riors are usEd and is convon,lonl ror tho In tallfir
No stud bolts to GQunter ink at c pnnl gI .
MATERIAL:'Son tubas. FINISH Galvai)12ed
I '1 � TALLAT1 13 .
11 2111 9PauIfIe l a6lanor 1, 8 nm Ca iia ral NoIus,
Mace the ISD IJ ever the anchor bolt_
No iddItlanal vvuhor required.
a To too d ublo. 2x Jul mbers tagother,1119 @ 1 n1R miist determine
tho 1- tanors roquir d to bind thn rna er �o 2 t as one upit
lI I10 ul splfttlng the Ym ud. Son page 20 for o I njo rM atl o r'I-
4 STB �r Bolt, on page s44 jnr�
enc orioa optlong,
i Refer, to technical bulletin T- N HUSPE for post-In--� Called
dM1cnOra go soIutfans (see pagg 199 /or lyiqrolls).
C O OE : See pay 12 for Code L is tin g Key Darl,
i
■
TRU TURilkL ENGRS
r,)ll D't H DIGS for
a n Uf Lj C tu rl 0 0
pUrP0585
(,I,on6r
not roj Uirnd)
V I I I r II I 11 1 Y I 1 r a 7i J 1 1
I I
1 I I 1 rr 1 I r r r 1, j j' r I I r, 11 1 r
r I 1
I II I I I Yi iJ I r I II 11 I 11 r I 11 YY rl 1 I I I IY
n u I I II IrPI
0031/004
r
f
Isher ri'�� �1 ,.D IY ®w
P041 01-70 by
Daz-�lunir
Varlrnal IVDU Inslallatlon
hrg ire taflecf raised off
U76 SlY Piato VVIfi) no Jqcransa I
fl ti f l VOWS (6,90 17ate ,
For hol'du psw per ASTM t STIanar sr anC ar holt nr)t should ba
1r� JF'tl tf JU1 t l rl 11171i wrorich, WIth consideration
given to dos r 1a Futuro woad shrina c. Care sbul'd e taken to nGt
ovor-torquig the nut, impact wren hu ihoui(I not (r LIGOd.
Ia1rr1111r eP,
M o d r
sem_ Number
ncho r �r SDS V FISP PF/r#F
nit ,' W(133/1501 ��11,1511 d
i�nl rT 1A KpIIIIIIIIp ppII-
1'A 2525 2260
—�}�, j�` 10 ,
. DU5- E 5215 151 _ 2 1121/18 31/4 11 - J --
-�' 54 0 670
1 V4 r 21 30 fil
8350 719
—• i 41h.4 Ir. 1.0011irlillillIr•�•_� - 7-q g.
i�+■r�IR. eir11111�uuaFIr.•• "YY VV '4�
A.' owbla MSA N huvo bwn IrlumM for aflalio um Or wJrld lnah dumtloris wilh
nO fulVerlin rease 5IIGLad°; rndtn wham 0!hur load dUrailons P0VQFP,
, Load arc lbazz 5d CSM 110110105,1 -.011 wood Pouts., JJrnitub by tI lj Of12 1,
dolfi ctlon.; [13whsr lost u O)T!iaia dlvf d Ed by 0 o r the ug icalHiad va lijes of 1h.e
SDS 11411 � r �oarews.
31 TAA 1D0910W rnv',.t !jpn[:I1FY RRellor balt Im, luncth and (30,u;1aTronl1
d, Men Urell F'Ompoglta hirribar cul urr n Sere s I11LIS6 ba appalled 13
G. D �� rftt ki sia II W54 wills a III epEa � 1J rl h n 0 u drill J ` 11 € h r ,
1 >'" ti�r� VialueT aft �r�lld For hol�'oym TIU$h nd r"lsad uFf of sill ja%.
I
k11 �1 �!� jl i1�1t1 �� �� T rojILDI'llo R i:11l k 11 F 11 W, Ili Il ;i: (1 I J
Holda n DOIsMon
a I Hag ]yes I Allowable
0Won Lan a
llim. 111M•,1
M)0 1 ��[1 ���� I ��'rl�t��1J f � ���r1�� I+Ih X17 ile
kid L, n lwt P) , 6)',1
�ll� r. JTM Ej1'1(I�' ley 111)1 rnVN (I
x,110111 11411 INI Al flit., �ii���l�� l a011��r1W1z[ t�a�d��l MAIM
i �h� v0411M 1yJtile, ` W.R inivumnui MSA MricIII u
Ire I W1 11 f1111F,1wq1 041,1rlw I; wrl lJ1111fir a
lat"i'N 11w Im h aA'd ti :Alrr- a I .I lin -(Ili! (fin, 11 Rifil, IrrilVASM
`[111110 fII!l lie U 1001 .IE U I'd Wu.,' r vur
17
15,1`rIl1�l'�II. I :.A+�ilr'� r1�I'yill■��
���li�;�r�t:��''�' ��� Illi;���l•���k� �,3�1[a��J ��fJiJ�h�� ��rr:l�l �.1r�1���i t'�1 a�����r q�s11�
1N,lhl ��hirw l �G�1II�"R'��:��'�+1[+���1�`i
IPIII SMI Nol, IV,1111111'; ?JY 11 �f1 J II u 111 �I eIA�1
r rPPP r I'. � '' r �r l;I
+<1 # rF� ���Mi }. �ti r��LI�LLJ La LJ�"LI�!'I II -"�
r i u I q rh 11 n �41'U ra
�i
P2 W1 31f1r111,11 11 flN+'I 1110 l 1 i InM d 11 , 0J ]-,I) I;`1NP I
r _ 1 f
d'17T��Jr1 op L !IL'ICIL F �, I� � I�� �"�Ir � �II '� � r l
T"
i jNh
0.017
0.049
01061
0, w9
l.d_D40
I4Lrr� a 1�1�I�Ir:s
--+J v1 M11 —
nlei
F101.
35
X 20852%OJ6922
ZIM
Telephone: (208) 523-6918
STRUCTURAL EHURS
G & S Structural Engineers
1600 John Adams Parkway
Suite 20.0
Idaho Falls, ID 83401
E-mail; gs@dataway.net
TOS Mike FROM: Mark D. Andrus PE
G 004+'
004
Fax: (208) 523P-6922
CO: _ DAFAE3 PATE: Tuesdayr, DecemberLZ 2006
PROJECT: Raaley Professional BuYldin
PROJECT:O-
0
06234
PAGES SENT INCL. COVER' ONE- PLEASE CALL IF ALL PAGES ARE NOT RECEIVED
REMARKS--,
Per our telephone conversation yesterday,
The holdowns and the double sided shearwafls on the north and south end wars are required as
shown. The missing shear wail anchor dolts can be post -installed per the footnote #3 in the wood
wall schedule. The holdown anchor bolts can alio be post -installed. Use 518" diameter threaded
rod with 1217 embedment and Simoson ET adhesive_
If you have any questions or if t can he of further assistance please don't hesitate to contact me_
SinnerPlv
marK Ancirus
Ku rt Ka rst— f de rs o n , K a rs t & Mitror h ite cts
LVV i a rAA 2H522G922
d
.- 7-- 1.. ., - % .1
'a;49100-43
wokIN1W
[A 002/004
Z
flLU
u
Lu
u)d�
'a;49100-43
wokIN1W
[A 002/004