Trus Joist
rim board
A3
Web stiffeners
required each
side at E1W
8" diameter maximum hole for
lfr/" - 20" deep blocking panels;
"' " ,meter maximum for
I panels 9%" deep or
sorter than 12" long.
N not _cutngs.
Trus Joist rim
board
NAILING REQUIREMENTS
TJI® loists at bearings: Two Bid (2Y2") box nails (1 each side), 1 Y2"
minimum from end.
Blocking panels, rim Joist or rim board to bearing plate:
TJI® blocking panels or rim joist: 10d (3") box nails at 6" o.c.
Trus Joist rim board: Toenail with 1 Od (3") box nails at 6" o.c. or
16d (3Y") box nails at 12" o.c.
Shear transfer: Connections equivalent to decking nail schedule.
Rim board, rim foist or closure to TJI®joist:
13/4" width or less: Two 1 Old (W) box nails, one each at top and
bottom flange.
2/6"thru V2" widths: Two 16d (V2") box nails, one each at top and
bottom flange.
31112" width: Toenail joist to rim joist with one 10d (3") box nail each
side of joist top flange.
2x4 minimum squash blocks: Two 10d (3") box nails, one each
at top and bottom flange.
4n- TJAXP rt.
'74 VN;Ye L
HANGER LIST - Simpson Strong -Tie Company, Inc.®
Plot ID Qty Product Label Top Nails Face Nails Member Nails Notes
HI 19 IUT11 10-N10 2-1110
H2 1 IUT9 9-N10 2-N10
Hanger Notes:
JOIST AND BEAM LIST
Plot ID
Length
Product
Plies
Qty
A
See Layout
11 7/8" TJI 110 foist
1
Nil
19'
1 3/4" x 11 7/8" 1.9E Microllam LVL
2
2
M2
7'
1 3/4" x 11 7/8" 1.9E Microllam LVL
1
1
ACCESSORIES LIST
Hall
16'
1 1/4" x 11 7/8" 1.3E TSmberStxand LSL
1
17
Bkl
1' 2. 25"
11 7/8" TJI 110 Blockinq Panels
1
3
Bkl*
4"
11 7/8" TJI I10 Blockinq Panels
1
1
Shl
4' x 8'
23/32" Structurwood Edge Gold (24" Span Rating)
1
67
Hk*, Random length
blockinq panel cuts
Bit, Blocking Panels; Rm, Rim Board
LEVEL NOTES
File Mama: 45-Larry Beesley Howard 06206.JOB
Level Name: Main Floor
Plotted: 6/20/2006 10:53
Design Status:
Main Floor... 6/20/2006 10:52
NOTE: Level design times indicated above provia
assurance for proper level stacking.
Design Methodology: AGO
Floor Area Loading Is:
40psf Live Load and 12 pelf Dead Load
Maximum Joist Deflection:
L/480 Live Load
L/240 Total Load
TJ-Pro Ratinq Information:
weighted Averaqe: 47
Lowest Ratinq: 33
Hiqhest Ratinq: 67
Glued 6 Nailed Deckinq is Required
Direct Applied Ceiling is Not Required
Floor Decking: 23/32" Structurwood Edge Gold (24"
Span Rating)
Normal O.C. Spacing = 1611*
*Unless noted otherwise
Scale: 1/4" = 1'
JOB COMMENTS
WARNING burg, Beesley
Joists are unstable until braced laterally Rex
Howard Job
Rexburg, Idaho
Bracing Includes:
• Blocking • Sheathing
• Hangere a Rim Board CREATED BY
NOT allow workers aStrut Lines aRim Joist DO NOT stack building BMEwssT
to walk on joists materials on unsheathed zgz went Main
until braced. joists. Stack only over AE%H aG b� D 83 440
IURY MAY RESULT, beams or walls. ezo9) 356-9z9z
WARNING NOTES: FAX: (zoe)356-3z9g
Lack of concern for proper bracing during construction can result in serious accidents.
Under normal conditions if the following guidelines are observed, accidents will be avoided
t All blocking, hangers, rim boards and dm joists at the end supports of the TJI 1 joists must be completely installed and properly nailed,
2. Lateral strength, like a braced and wall or an existing dock, must be established at the ends of the bay. Thle can also be accomplished
by a temporary or permanent deck (sheathing) fastened to the first 4 feet of Joists at the end of the bay.
3. Safety bracing Ones of 1x4 (minimum) must as palled to a braced end wan or sheathed area as in note 2 and to each Joist. without this
bracing, buckling sideways or rollover is highly probable under light construction loads - like a worker or one layer of unnailed sheathing.
4. Sheathing must be totally attached to each TJI 9 Joist before additional loads can be placed on the system.
5. Ends of cantilevers require safety bracing on both the top and bottom flanges.
6. The Ranges must remain straight within a tolerance of ye" from true alignment.
SYMBOL LEGEND
Note from operator
Point Load
Line Load
Area Load
ODetail Callout Label
(See Framer's Pocket Guide)
b9uvy 9 J U L 1 0 2006 JL5
CITY OF REXBURG