Loading...
HomeMy WebLinkAboutJOISTS - 06-00340 - 642 Harvest Dr - New SFRA complete TJ-Xpert framing plan requires the Trus Joist Framer's Pocket Guide See Trus Joist Framer's Pocket Guide for Product Trademark Informatics •NO ROOF LOADS APPLIED. IMPORTANT PLEASE READ AND SIGN THE ATTACHED SHEET BEFORE TAKING POSSESION OF YOUR LAYOUT! READ BY INTIALS DATE Trus Joist rim board A3 Web stiffeners required each side at E1W 8" diameter maximum hole for lfr/" - 20" deep blocking panels; "' " ,meter maximum for I panels 9%" deep or sorter than 12" long. N not _cutngs. Trus Joist rim board NAILING REQUIREMENTS TJI® loists at bearings: Two Bid (2Y2") box nails (1 each side), 1 Y2" minimum from end. Blocking panels, rim Joist or rim board to bearing plate: TJI® blocking panels or rim joist: 10d (3") box nails at 6" o.c. Trus Joist rim board: Toenail with 1 Od (3") box nails at 6" o.c. or 16d (3Y") box nails at 12" o.c. Shear transfer: Connections equivalent to decking nail schedule. Rim board, rim foist or closure to TJI®joist: 13/4" width or less: Two 1 Old (W) box nails, one each at top and bottom flange. 2/6"thru V2" widths: Two 16d (V2") box nails, one each at top and bottom flange. 31112" width: Toenail joist to rim joist with one 10d (3") box nail each side of joist top flange. 2x4 minimum squash blocks: Two 10d (3") box nails, one each at top and bottom flange. 4n- TJAXP rt. '74 VN;Ye L HANGER LIST - Simpson Strong -Tie Company, Inc.® Plot ID Qty Product Label Top Nails Face Nails Member Nails Notes HI 19 IUT11 10-N10 2-1110 H2 1 IUT9 9-N10 2-N10 Hanger Notes: JOIST AND BEAM LIST Plot ID Length Product Plies Qty A See Layout 11 7/8" TJI 110 foist 1 Nil 19' 1 3/4" x 11 7/8" 1.9E Microllam LVL 2 2 M2 7' 1 3/4" x 11 7/8" 1.9E Microllam LVL 1 1 ACCESSORIES LIST Hall 16' 1 1/4" x 11 7/8" 1.3E TSmberStxand LSL 1 17 Bkl 1' 2. 25" 11 7/8" TJI 110 Blockinq Panels 1 3 Bkl* 4" 11 7/8" TJI I10 Blockinq Panels 1 1 Shl 4' x 8' 23/32" Structurwood Edge Gold (24" Span Rating) 1 67 Hk*, Random length blockinq panel cuts Bit, Blocking Panels; Rm, Rim Board LEVEL NOTES File Mama: 45-Larry Beesley Howard 06206.JOB Level Name: Main Floor Plotted: 6/20/2006 10:53 Design Status: Main Floor... 6/20/2006 10:52 NOTE: Level design times indicated above provia assurance for proper level stacking. Design Methodology: AGO Floor Area Loading Is: 40psf Live Load and 12 pelf Dead Load Maximum Joist Deflection: L/480 Live Load L/240 Total Load TJ-Pro Ratinq Information: weighted Averaqe: 47 Lowest Ratinq: 33 Hiqhest Ratinq: 67 Glued 6 Nailed Deckinq is Required Direct Applied Ceiling is Not Required Floor Decking: 23/32" Structurwood Edge Gold (24" Span Rating) Normal O.C. Spacing = 1611* *Unless noted otherwise Scale: 1/4" = 1' JOB COMMENTS WARNING burg, Beesley Joists are unstable until braced laterally Rex Howard Job Rexburg, Idaho Bracing Includes: • Blocking • Sheathing • Hangere a Rim Board CREATED BY NOT allow workers aStrut Lines aRim Joist DO NOT stack building BMEwssT to walk on joists materials on unsheathed zgz went Main until braced. joists. Stack only over AE%H aG b� D 83 440 IURY MAY RESULT, beams or walls. ezo9) 356-9z9z WARNING NOTES: FAX: (zoe)356-3z9g Lack of concern for proper bracing during construction can result in serious accidents. Under normal conditions if the following guidelines are observed, accidents will be avoided t All blocking, hangers, rim boards and dm joists at the end supports of the TJI 1 joists must be completely installed and properly nailed, 2. Lateral strength, like a braced and wall or an existing dock, must be established at the ends of the bay. Thle can also be accomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of Joists at the end of the bay. 3. Safety bracing Ones of 1x4 (minimum) must as palled to a braced end wan or sheathed area as in note 2 and to each Joist. without this bracing, buckling sideways or rollover is highly probable under light construction loads - like a worker or one layer of unnailed sheathing. 4. Sheathing must be totally attached to each TJI 9 Joist before additional loads can be placed on the system. 5. Ends of cantilevers require safety bracing on both the top and bottom flanges. 6. The Ranges must remain straight within a tolerance of ye" from true alignment. SYMBOL LEGEND Note from operator Point Load Line Load Area Load ODetail Callout Label (See Framer's Pocket Guide) b9uvy 9 J U L 1 0 2006 JL5 CITY OF REXBURG