HomeMy WebLinkAboutREVIEW ACTIONS - 06-00330 - AMET Building(0
CITY OF
REXBURG
America's Iamily Commuviiy
July 19, 2006
Review Action
Permit Number: 06 00329
Project Name: AMET Building -Site Plan
Project Type:
Review Item
Site Plan Review
Fire Department Review
Water Supply PLEASE PROVIDE THE FOLLOWING
INFORMATION FOR MORE ACCURATE SITE
PLAN REVIEW:
1. PROPOSED FIRE HYDRANT LOCATIONS
2. EXITING FIRE HYDRANT FLOWS AND
ESTIMATED PROPOSED FIRE HYDRANT
FLOWS
3. IS BUILDING TO BE FULLY FIRE
SPRINKLERED?
4. OCCUPANCY TYPE
5. CONSTRUCTION TYPE
6. WHICH PHASES OF THE BUILDING WILL
BE CONSTRUCTED FIRST?
Fire Access Roads _ BUILDING HEIGHT DICTATES THAT 2003 IFC
SECTION D105 IS REQUIRED. PLEASE
PROVIDE MORE DETAILS.
Fire Lane Signage MAY BE REQUIRED DEPENDING UPON
FINAL SITE PLAN
Additional Comments PLEASE PROVIDE ADDITIONAL
INFORMATION ARE REQUESTED. IF YOU
HAVE QUESTIONS PLEASE CONTACT
CHRIS AT 705-1312.
Parcel ft RPRRXBP2030030
RO Box 280
19 E Main St.
Rexburg, Idaho 83440
Phone (208) 359-3020
Fax (208) 359-3022
(W
CITY OF
REXBURG
ne+
Amerim's Pomiiy Conm�m,iry
May 17, 2007
Review Action
Permit Number: 06 00330
Project Name: AMET Building Foundation ONLY!
Project Type: Commercial New
P.O Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone (208) 359-3020
Fax (208) 359-3022
Review Item Actions Required for Approval Approved
Planning Staff Review
Development Standards Review South building facade, being over 100 et in 09/13/2006
le th, is required to incorporate wall
proj tions or recesses a minimum 3 foot
depth nd a minimum of 20 conti ous feet in
length. \
2. Buildin facades shall be bro en up
horizontally very 30 feet by color change,
texture chan , material m ule change, or 1
architectural st ctural ba .
3. South wall is r quried o vary height of roof
lines every 100 lin ar f et.
4. Parking between ilding and streets must
be screened.
5. Sidewalks alon pub' right of way are
required to be a east 6 f t wide.
6. Internal ped strian we[ s need to be
connected t ublic right of w walkways.
Development Standards Review The issue isted above were ap ved in a 09/13/2006
Design eview meeting - 9/13/200 .
Development Standards Review Developer must submit a landscaping plan to
screen the parking from the street, and to
visually break up the north side of the building -
as noted in the design review meeting -
9/13/2006.
Trees must be approximately 100 feet apart -
to substitute for the design standards
requirement. Landscaping must be completed
with the building project.tliti
Development Standards Review The west facade of phase 2 must incorporate 2 1 ..M
foot deep, 20 foot long recess or projection Or N/"Tm
every 100 lineal feet. (Y)A. to `�-L D4m
Development Standards Review % North and West facades do not meet section
l 3.9.160.a.ii - Detail Features. Each facade O�
must include a repeating pattern every 30 feet
Development Standards Review The west facade must break up the roofline
every 100 feet. See section 3.19.160.a.iii - 0
��� M`�ns
Parking Schedule
....� employees
Full Time
8 to 5 Shift
37
First Shift
3
Second Shift
3
Offsite Staff
3
Part Time
3
Total Employees
49
Peak Working Hours/Assembly & High Bay Areas
Employees 18
Peak Working Hours/First & Second Floor
Gross Square Footage 15,040
Standard Space Size
9' x 18'
Compact Space Size
8' x 15'
Handicapped Space Size
10' x 19'
Access
6' x 19'
Code Requirements
18x1.2= 21.6or22
1,5040 x 2= 30080 or 30
Total Stalls Required
Total Stalls As Drawn
52
59
City Meeting/AMET
May 21, 2007
Site Plan Review
Requirement: Parking must not be located in the first 10' of front yard setback.
Action: 10' front yard set back will be adhered to and reflected on the civil plans
Requirement: The minimum parking stall size is 9 x 18 feet, not 8.5 x 19. The compact size is
8 x 15 feet.
Action: Proper parking stall sizes will be adhered to.
Requirement: 79 total parking stalls are required, 20 of which may be compact.
Action: 59 stalls will be provided for this facility per code. This information is reflected
on the parking schedule spreadsheet provided.
Requirement: Garbage containers must be screened. Please show type of screening on the site
plan.
Action: Garbage containers will be screened with fencing, and will be reflected on the
civil plans.
Requirement: All parking areas shall be screened from the public right-of-way with fences,
hedges, berms, and landscaping. Please submit a detailed landscaping plan for
review.
Action: Screening of parking will be adhered to per requirements. A landscaping plan
will be submitted for review reflecting screening.
Requirement: It is recommended that the internal pedestrian connection be located on the south
end of the lot. The code requires this pathway to include adjoining landscaped
areas that include trees, shrubs, benches, flower beds, ground covers, or other
such materials for no less than 50 percent of its length.
Action: Will not provide internal pedestrian connection to right of way for following
reasons.
1- Providing an additional invitation to the general public is not desired
for safety and privacy reasons.
2- Projected use if any by employees will not serve the intended purpose.
3- The facility is in a light industrial area and will not see a heavy flow of
the general public.
4- Additional cost incurred
.,i
u
Requirement: Northeast parking area will force vehicles to us the right-of-way to turn around or
move from one area of the lot to another. The ordinance prohibits this.
Action: This area of parking will be removed and specified as a loading and unloading
area on plans.
Development Standards
Requirement: Developer must submit a landscaping plan to screen the parking from the street,
and to visually break up the north side of the building as noted in the design
review meeting 9-13-06.
Action: A landscaping plan will be submitted for approval. Landscaping plan will reflect
screening the parking.
Requirement: Trees must be approximately 100' apart to substitute for the design standards
requirement. Landscaping must be completed with the building project.
Action: Design standards will be adhered to regarding the landscape work. Landscaping
will be completed as part of the building project.
Requirement: The West facade of phase 2 must incorporate 2 foot deep, 20 foot long recess or
projection every 100 lineal feet.
Action: Will not incorporate 2 food deep, 20 foot long recess or projection.
- The West facade will be broken up by vertical columns and windows as shown
on the architectural drawings.
- The columns shown will still provide a break-up on the West side providing a
nice look to this side of the facility.
Meeting the design standard for this side of the facility will increase the cost of
the building and adds no value to the owner.
Requirement: The West facades do not meet section 3.9.160.a.ii — Detail Features. Each facade
must include a repeating pattern every 30 feet.
Action: Will not incorporate this design standard.
- These standards will increase cost, and adds no value to the owner.
- The materials planned for the exterior of the facility are not substandard.
- The exterior look of the building will be aesthetically dominant to the existing
buildings in this light industrial area.
Requirement: The West facade must break up the roofline every 100 feet. See section
3.19.160.a.iii.
Action: Will not incorporate this design standard.
- These standards will increase cost, and adds no value to the owner.
aC+auq
—CITY OF
REXBURG
A,nenrni Fw dy Cmn.,,Wfy
May 24, 2007
Permit Number: 06 00330
Project Name: AMET Building
Project Type: Commercial New
Review Item
Administrative Review
Permit Tech Notes
Parcel Ws RPRRXBP2030030
19 E. Main St.
Rexburg, Idaho 83440
Phone (208) 359-3020
Review Action Fax (208) 359-3022,
Actions Required for Approval Approved
Plumbing, Mechanical, & Electrical signatures
needed for Phase 2 if contractors have
changed.
� °'psnuRc
CITY 0 FF 19 E. Main St.
Rex
vLW V 1��
burg, Idaho 83440
-- cw — - Phone (208) 359-3020
Americas Family Community
'
Review Action
Fax (208) 359-3022
May 24, 2007
Permit Number: 06 00330
Project Name: AMET Building
Project Type: Commercial New
Review Item Actions Required for Approval Approved
_-
Building Code Fire Compliance Review Provide details that identify how fire blocking
will be constructed at the space between the
steel building and the interior construction.
Waste Water Grease Trap Form
Exiting Review Identify on plans emergency lighting and all exit
signs. The second required exit from the
upstairs passes through the "assembly area".
Section 1013.2 requires that egress shall not
pass "through adjoining or intervening rooms or
areas, except where such adjoining rooms or
areas are accessory to the area served". The
assembly area is not accessory to the offices
that are on the second floor. Egress continuity
will be lost with the current configuration.
Please revise this egress component. Also,
the travel distance from the exercise room and
the storage room on the second floor exceed
the allowable distance from IBC Table 1015.1.
The area under the stairs must be 1-hr. rated
construction.
Structural Review Provide engineered structural details for the
interior construction. The steel building is not
engineered for the loads that will be generated
by the interior construction. Include shear
walls, floor joist and footing details for the
interior. Special inspections are required for
the concrete foundation, high strength bolting
and any welding. Provide letter from special
inspection firm.
Mechanical Review Provide mechanical details and sizing.
Electrical Service Review
Energy Conservation Compliance Review
Need to see a plan for the circuits and the
service for what is to be installed. Revisions
required.
Need to see a lighting energy compliance.
Nothing was submitted.
� pbxaugG;
C I T Y OF 19 E. Main St.
m REXBURG Rexburg, Idaho 83440
0
----- OW— Phone (208) 359.3020
J'. America's Family Comm Plity
Review Action
Fax (208) 359-3022
May 24, 2007
Permit Number: 06 00330
Project Name: AMET Building
Project Type: Commercial New
Review Item Actions Required for Approval Approved
Miscellaneous Building classification is B, F-1, S-1 and S-2.
The review for building size was based on a
"nonseperated uses" approach. Therefore, the
materials that are allowed in the building must
meet the requirements of the 2003
International Building Code Table 307.7(1).
Please provide a letter that identifies that the
table has been reviewed and that the quantities
of applicable materials that will be present in
the building will meet these requirements.
Energy Conservation Compliance Review Provide energy review for mechanical, lighting
and envelope.
Electrical Circuits Review Need to see and review a plan for what is
planning on being installed electrically.
Revisions required. Nothing was submitted
electrically.
Parcel Ws RPRRXBP2030030
~; �pbxnugC�>
0
CITY OF
REXBURG llft�
:Imerlta's Family Community
Review Action
May 24, 2007
Permit Number:
Project Name:
Project Type:
0600330
AMET Building
Commercial New
19 E. Main St.
Rexburg, Idaho 83440
Phone (208) 359-3020
Fax (208) 359-3022
Review Item Actions Required for Approval Approved
Miles R ItiNVi-IN
Required Fire Flow See site plan review 05/23/2007
Fire Extinguishers All fire extinguishers are required to be
installed before final fire inspection.
Standpipes Not required according to plans submitted
Alarm Systems
Other Comments
Commercial Cooking
Automatic Fire Extinguishing Systems
Water Supply
Fire Access Roads
Parcel Vs RPRRXBP2030030
Submit letter of intent from certified Fire Alarm
contractor.
Fire alarm drawings are required to be
reviewed and approved before installing any
part of the fire alarm system.
Submit a letter to the building official stating
that the occupancy will not exceed the allow
amount of hazardous materials that would
require the occupancy to be classed as a
hazardous occupancy.
Lock box is required for this occupancy. Forms
are available at the Rexburg Fire Department.
N/A
Plans are required to be submitted to the State
Fire Marshall and approved prior to any
installation of the Fire Sprinkler System.
Submit letter of intent from a certified Fire
Sprinkler Contractor
See site plan review
See site plan review
05/23/2007
05/23/2007
05/23/2007
05/23/2007
05/23/2007
P. 1
MemTry TX Result Report ( May.24. 20To 3:32PM )
• 1)
2)
Date/Time: May.24. 2007 3:31PM
File Page
No. Mode Destination Pg(s) Result Not Sent
----------------------------------------------------------------------------------------------------
4267 Memory TX 6560400 P. 5 OK
----------------------------------------------------------------------------------------------------
Reason for error
E. 1) Hang up or line fail E. 2) Busy
E. 3) No answer E. 4) No facsimile connection
E. 5) Exceeded max. E—mail size
a1vv a•
rs8M6BaigID Fj WZZH .=XM REXS W
Fax rW
tia
Iayttas9eP
tt=
JottelHorssen
PbOM
Dchx
May24.20V
am
cc
o U19cad a Far Rowtow a Prove Conmseas o Penn try► o Ptws Recto I
.caanrft
Here >z the bu]dr>O reNlew action+ fw AME7. n doesn't tnctude any design standards notes
because En*sotd you had warned those detail out.
shaft YOM
JaNel Kamen
0
tiy�� pE7tsu�r,'o
. D �
!_CITY OF
REXBURG
OW
Anericai Family Community
July 12, 2006
P.O Box 280
19 E Main St.
Rexburg, Idaho 8M40
Phone (208) 359-3020
Review Action Fax (208) 359-3022
Permit Number: 06 00329
Project Name: AMET Building -Site Plan
Project Type: Site Plan Review
Review Item
P 'b�Iic�irtRr;�e
Approved Site Plan 1. The proposed phase 1 portion of this project 07/11/2006
is approved.
2. Prior to the final approval additional
information must be submitted showing details
of the storm water collection system.
3. The location of the refuse collection bin must
be at a location the is accessable to a right side
pick-up collection truck.
4. Additional information must be supplied for
the parking and area lighting. The fixture type,
wattage, location and light curves must be
submitted.
5. If a fire sprinkler system is required for the
comlpleted building a connection to the mainline
will be required. This connecton will require a
street corssing.
Parcel Vs RPRRXBP2030030