Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION - The Grove at Thomson FarmsInspection Date 05/14/2021 File Name 20001DFR05142021LC Inspector's Signature Inspector's Name L. Clifford Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 05/17/2021 815C3E54-3478-49AE-89B1-D940C798CE7B 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name The Grove Time Start 04:00 PM Client Stillwater Equity Partners Contractor HSE Time End 05:30 PM Inspection Type(s) Other Location(s) Sidewalk along the east side of Linden building Observations/ Remarks Chuck with HSE was on site for density testing and was informed of passing test results. Density shots were taken every 100 feet. Items observed are in general conformance with approved project documents and jurisdictional requirements. New Multi Photo Inspection Date 05/14/2021 File Name 20001DFR05142021LC Inspector's Signature Inspector's Name L. Clifford Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 05/17/2021 815C3E54-3478-49AE-89B1-D940C798CE7B 2