SUNi,DBERG & ASSOCIATEd
ARCHITECTS
SIXTEENTH & BOULEVARD in P.O. BOX 2379 o IDAHO FALLS,
TELEPHONE (208) 522-6901
FAX (208).522-6 28
June 23, 2006
City of Rexburg Building Department
Attn.- Val Christensen
12 North tenter
Rexburg, 1440
rL
Re: Rexburg Headstart Center -- Occupancy group Classificafion
Dear Mr. Christensen:
The above referenced project is designed to meet the educational requirements of the
Headstart program as administered by the US Department of Health and Human Services..
The building is an educational facility, IBG occupant, Group E.
IBC Commentary, Section 308.5.2 Child Care Facility: A
faeility that provides
supervision and personal care on less than 24 hour basis. for more Shan Siwe children 2 %2
years of age shall be classified as Occupancy group 1-4.
Exception to 308.5.2 childcare Facility: The Rexburg Headstart meets these requirements
of this exception for children 2 1f2 years or fess of age to be an occupant Group E.
Section 305 Educaii Group E* The Headstart programs meet the requirements
Section 305 for the ages and number of children using the facility.{
r1% -elm
.0 9
The program does not provl*de custodial care to any of the students.
SUND
Very truly yours,
& ASSOCIATES, INC.
W
JaNell Hansen
From: Natalie Powell
Sent: Friday, June 1 5, 2007 8-12 AM
To: JaNeff Hansen
Subject: FW- Head Start (Rexburg) Landscape Plan
JaNell',
The following is what I was able to fined out from Mr Spain referencing Head Start,,
Natalie
Fromm, Russell Spain [ma lto: rspain@eicap.org]
Sent: Thursday, June 14, 2007 9:08 AM
Toms Natalie Powell
SuhjeCt: FW: Head Start (Rexburg) Landscape Plan
1)1
Attached is the correspondence between Gary and I concerning the plan for the Head Start Center. As I mentioned to
you on the phone, the screening of the garbage cans in front of the building etas been completed. 1Ne are waiting now for
the landscaper to get us on itis schedule and the delivery and set-up of playground equipment. Last I heard, the
playground equipment was to be delivered the week of June 25". 1 will contact Jarrell for a final inspectian as Gary has,
suggested. If you have further questions, please let me know.
Russ
Russell Spain, CCAP
Executive Director
Eastern Idaho Community Action Partnership
PO Box 51098
357 Constitution Way
Idaho Falls, ID 83405
208-522-5391
FAX 208-522-5453
EICAD�
.. . .......... .
From: Gary Leikness [mailto:garyl@rexburg.org] Y�
Sento, Friday, May 18, 2007 1:14 PM
To: Russell Spain
Subjects, RE: Head Start (Rexburg) Landscape Plan
Russ,
Thanks you for the narrative on what is being proposed.
From what you have described and submitted It sounds like you
will have great landscaping. I know your building is set in back of your parking lot and therefore will be somewhat
screened from the street. A good balance should be achieved; you should have a lot of visibility from the road via the
driveway access., but when landscaping is required, it should be adequate to screen vehicles. if feasible, I always
recommend to people to place their building closer to the front property line and put the parking 'in the rear. This a lWr ays
shows off the budding and not the parking. The intent of screened Parking areas is to soften the visual impacts, of
pavement andI
vehOes, and to create a pleasant streetscape. If you feel this can be accomplished by what you have
proposed, I would recommend moving forward with your plans, I will attach your e-mail to your variance file.
The dates you have proposed are reasonable and therefore are not a problem. Just calX359-3Q20 ext 326) for a
final planning inspection.
Thank you for working through all these issues.
1
JaNell Hansen
From:
Sent:
To:
Subject:
Natalie Powell
Friday, June 15, 2007 8:12 AM
JaNell Hansen
FW: Head Start (Rexburg) Landscape Plan
JaNell.,
The following is what I was able to find Qat from Mr Spain referencing Head Start.
Natalie
From: Russell Spain [maiito:rspain@eicap.org] �� ...�.....�
Sent: Thursday, June 14,, 2007 9:Q$ AM
Tot: Natalie Powell
Subject: FW: Head Start (Rexburg). Landscape Plan
Aftached is the correspondence between nary and I concerning the plan for the Head Start Center, As I mentioned to
you on the phone, the screening of the garbage cans in front of the building has been completed. We are waiting now for
the landscaper to get us on his schedule and the delivery and suet -up of playground equipment. Last i heard, the
playground equipment was to be delivered the week of Juni 25th. I will contact Jarrell for a final inspection as Ga has
suggested, If you haus further questions, please let me knew. �
Russ
Russell Spain, CLAP
Executive Director
Eastern Idaho Community Action Partnership
PO Box 51098
357 Constitution Way
Idaho Fall, ID 8344.E
208-522-5391
FAX 20$-522-5453
EICAP}
N
From: Gary Leikness [rnailto-,gary1@rexburgorg]:
Sent: Friday, May 18, 2007 1:14 PM
To: Russell Spain
Subjects, RE: Head Start (Rexburg) Landscape Plan
Thanks you for the narrative on whit is being proposed. From what you have described and submitted it sounds likeyou
wi[I have great landscaping. I know year building is set fn back of your parking tot and therefore will be somewhat
screened from the street. A good balance should be achieved; you should have a lot of visibility from the read via the
driveway access, but where landscaping is required, it should be adequate to screen vehicles. If feasible, ! alvvaYs
recommend to people to piaci their building closer to the frontproperty line and put the parking in the rear. This always.
shows off the building and not the park'ng. The intent Of screened parking ares �s �o soften the viSu�I i
m acts of �
pavement and vehicles, and to create a pleasant streetscape. if you feel this can be accomplished by what you have
proposed, 1 world recommend moving forward with your plans. ! wild arttach your e- ail to your variance file.
The dates you have proposed are reasonable and therefore are not a problem. Just call .�anei! (355-3Q20 ext 325} for a
final planning inspection.
Thank you for working through all these issues..
1
Q
Sincerely,
Gary
From; Russell Spain [mailto:rspain@eicap.org]
Send: Friday, May 18, 2p07 10:33 AM
Ta: Gary Leikness
Subject: RE; Head Start (Rexburg) Landscape Plan
Gary,
I finally had an opportunity to talk with the person doing the landscaping, on site, white 1 was in Rexburgda, wall will be the exact heighfi of the top of the curb around the edge of the harking tot nex# door. [twill go the sQufh until
both properties are the same level and the wall is no longer needed, it will also eur►i/e around the front of the parking lot,
and nope Off intil it is at ground level. It will be constructed of castle block and filled behind to bring f4 grv�nd
landscapinglaws!ofttnext door.
The sprinkler system will be installed to water all areas that have grass, and a drip system will be installed to water all
shrubs, all of which will be on an automatic dimer installed in the utility room of the building.
I don't know what else to say about the screening of the parking lot. The landscaper seems to think if we add anymore tv
the front beyond the linden trees he has there now, it will block out the building, which is not what we avant to dry. The
combination of the retaining wall and the trees and sad in front will make the parking lot look somewhat below ground
bevel. We actually will be replacing the 3 Scotchpiste trees in tete back with shade trees spaced around the playground
equipment. One of the Head Start requirements is that shade be provided in the playground area. This change will
improve the workability of the playground area. All of the x's in the drawing are shrubs set in landscape rock or bark.
With the exception of the island in the parking lot, I have asked him to not include any shrubs there, just the lands -cape
rack, because I do not want to provide a blind there, nor do I want to disturb the parking lot to run a water Ione.
We will not be competed by ,lune 1St, So I would like to request ars extension. Our playground equipment will be delivered
arr or about June 18 Prior to that time, the sprinklers and the preparation work will need to be done, and the front and
sides could be done as soon as I receive the approval from you and we can get on the landscaper's schedule. I am
reluctant to begin any work at all until you have approved the pian. I would anticipate that everything would be completed
before the end of July. We will have the screen of the garbage cans completed before June 1:5ti
I hope this answers your concerns. If not, het me know.
Russ
Russel Spain, CLAP
Executive Director
Eastern Idaho Community Action Partnership
P4 Bax 51098r
357 Constitution Way
Idaho Falls, ID $3405
2(]8-522-5391
FAX 208-5?2-543
EICA.P}
From: Gary Leikness [mailto:garyl@rexburg.orgj
Sent; Tuesday, May, Q8, X007 4:52 PM
To: rspain@eicap.org
Subject: Head Start (Rexburg) Landscape Plan
Mr. Spain,
I have reviewed your landscape plan. According to the variance approval details regarding the retaining wall and also
details for how the parking area are to be screened needed to be submitted. l didn't see any details for the retaining
well, so I would request that you get that to us. I understand the planning Commission to want to know the dimen"i
ons
of as and how is to be landscaped, Please submit any additional info regarding tat matter. Also, the landscaping orathe
front should include specific locations for shrubs as well as trees. Irrigation Systems should be addressed at this time as
well.
K
I think with all of that being said, Pl&u3e move forward with prepping the site and ordering most of your plants., etc. You
may meed more shrubs along the front and possibly an additionaN tree, although ��nden trees can cover a goad sized
area.
Please let me know if you have any questions.
Sincerely,
Gary
-�--- -- --- ------e----A-----,
Gary Leikness
P&Z Administrator
19 EMain
PO Box ZSD
Rexburg, Idaho 53440
E-mail- gar-yl@rexburg.org
Phone- (20$)359-3(30 Ext. 314
-- ---------------____�_-�_-.�
KJ
Sincerer.
Gary
From: Russell Spain [mailto:rspain(cbeicap.org]
Sent: Friday,. May 181- 2007 10:33 AM
Too, Gary Lei-kness
Subject: RE: Head Start (Rexburg) Landscape Plan
9
Gary,
I finally had an Opportunity to talk with the person doing the landscaping, on site, while I was in Rexburg yesterday. The
wall will be the exact height of the top of the garb around the edgy of the parking Int next door. It will go to the south unfit
both properties are the same level and the wail is no longer needed. It wilt also curve around the front of the parking lot,
and slope off until it is at ground level. It will be constructed of castle block and filled behind to bring to ground level of the
landscaping next door,
The sprinkler system will be installed to water all areas that have grass, and a drip system will be ins -.,.d t
shrubs, all of which will be on an automatic tamer installed in the utility room of the building. ° water all
don't know what else to spy about the screening of the perking lot. The landscaper seems to thick if we add anymore to
the front beyond the linden trees he has there now, it will black out the bu-1ding, which is not what we want to do.
The
combination of the retaining wall and the trees and sod in 'Front will make the parking lot look somewhat below ground
level'. We actually will be replacing the 3 Scotch pine trees in the back with shade gees spaced mound the playground
equipment. One of the Head Start requirements is that shade be provided in the playground area. This change will
improve the workability of the playground area. All of the x's in the drawing are shrubs set in landscape rock or bark.
With. the exception of the island in the parking lot, I have asked him to not include any shrubs there, just the landscape
rock, because I do not want to provide a blind there, nor do I want to disturb the parking I0# to rug a water line.
We will not be completed by June Is', so I would like to r�c�uesf an extension. Our playground equipment will be delivered
on or about ,lune 18 Prior to that time, the sprinklers and the preparation work will geed to be doge, and the front and
sides could be done as soon as f receive the approval from you and we can get on the landscaper's schedufe. I am
reluctant to begin any work at a!I antil you have approved the plan. I would anticipate that eve thing would kap completed
before the end of July. We will have the screen of the garbage cars completed before June 9�
I hope this answers your concerns. If not, let me know.
Russ
Russell Spain. CLAP
Executive Director
Easters Idaho Community Action Partnership
P(] Bax 51{]98
-)57 Constitution Way
Idaho Falls, ID 8340D
208-522-5391
FAX 208-52,5453
EICAP)
Fromo, Gary Lelkness [mal'ito:garyl@rexbul",OY,",,,or9]
Sint: Tuesdays May a8, 2Q07 4:52 PM
To: rspain@eieap.org
Subject: Head Start (Rexburg) landscape Plan
Mr. Spain.,
J have reviewed your landscape plan. According to the variance approval details regarding the retaining wall and also
details for how the parking area are to be screened needed to be submitted. ! didn't see any details for the retaining
well, so t would request that you get that to us. I understand the Planning Conn.mission to want to know the dimensions
of is and how is to be landscaped. Prase submit any additional info regarding that matter. Also,
front should preclude specific locations for shrubs as well as trees. Irrigation systems should be a the landscaping an the
well. ddressed at this time as
0
!think with all of that being said, please move forward withre
may need more shrubs along the front and possibly an additional t �e�he site and ordering most o�yoUr punts, etc. Yau
although Linden can rover a good sized
area.
Please !et me know if you have any questions.
Sincerely,
Gary
-----__-_s_----_-- --
Gary Leikness
P&Z Administrator
19 E Main
PO Box 280
Rexburg, Idaho 83440
E-mail- gar-yl@rexburg.org
Phone- (208)359-3020 Ext. 314
-so ---- ----- - ----- --
Mai 22 2006 joe35AN
Sundberg ASSociates, In
2D8-522--6928
P.9 1
.
rns-L-ruc�.icn
Guide P hmeac
t�
IDAHO VZRSj0jq 612 004
Page
BLOCK
The i rIg siqftat�ure block.
allparagraph 9.1,7,-
ZIE
the
' �" '`' °"" ,+ tet have � �=
,� � � .. �..� ....,, caused � b
rESmec`ive datesIndicated -Lcate -# the
I°T
k
7 yp N a
ir..I
V
Na "
JL -JL,-1.
-OFFICE EF
05/15/06'-a L
k
.0
W tii
u Rt
4
4
rr i t) e
D
TheY way
a a l ass L s t a i lz
Owne r a
Ag%&nLncy
provide<J, + ' �' T 4 Awl Si90 i otaV' r L
slon:- off thcOnsiatent wj�',-Wh AgOncy requjz-eLmemts,
k
V
P Ww -4 Lao ki. I P I ki
Alk