HomeMy WebLinkAboutEARTHWORK INSPECTION 3 - The Grove at Thomson FarmsInspection Date 05/13/2021 File Name 20001DFR051321RB Inspector's Signature Inspector's Name Russ B Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 05/17/2021 5E48B683-E17E-415D-9140-6054B7A270FD 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name The Grove Time Start 09:30 AM Client Stillwater Equity Partners Contractor Hill and Sons Excavation Time End 12:45 PM Inspection Type(s) Earthwork Inspection Location(s) Did densities tests at The Grove, between the Hickey, Black Oak, and Linden buildings. We tested the final grade on material for the curbs to be poured on. Observations/ Remarks Couldn’t get many passing tests with 2 and 4 inch tests. More water and compaction was added that resulted in backscat tests were fairly easy to come by Items observed are in general conformance with approved project documents and jurisdictional requirements.