Loading...
HomeMy WebLinkAboutEARTHWORK INSPECTION 2 - The Grove at Thomson FarmsInspection Date 05/13/2021 File Name 20001DFR05132021LSH Inspector's Signature Inspector's Name Luke Hammar Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 05/17/2021 108BBA84-7098-4F55-A74E-B47E0A478E04 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name The Grove Time Start 09:45 AM Client Stillwater Equity Partners Contractor Hill and sons Time End 01:30 PM Inspection Type(s) Other Location(s) Densities on sidewalk base for buildings: Linden, black oak, and hickory. Observations/ Remarks We shot densities for the 3/4 base, at first they were failing but with added water and compaction they passed. Items observed are in general conformance with approved project documents and jurisdictional requirements.