HomeMy WebLinkAboutSOIL DENSITY 22 - The Grove at Thomson FarmsFile Name:
20001D05132021RB
5C9BB84E-3A1C-48DC-BC5B-91EA888690DF 1
4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com
In Place Density of Soils ASTM D2922 & D3017
Project Number:
20001
Contractor:
Hill and Sons Excavation
Project Name:
The Grove
Instrument ID
76560
Daily Standardization:
Client:
Stillwater Equity Partners
Date:
05/13/2021
MS:
619
DS:
2555
Time Start:
10:00 AM
Time End:
01:00 PM
Details
Test
#:
Location:Elevation: Depth:Wet:Dry:% M:Proctor #:%
Proctor:
Pass Fail
1 North side of
building Hickory, at
the halfway point of
the building.
Top of
finished
grade
4 133.7 127.8 4.6 132.8
Material
Type
3/4" Base
96
2 East side of building
Linden
Finish grade 4 131.2 126.2 3.9 132.8
Material
Type
3/4" Base
95
3 North of Black Oak
building
Top of finish
grade
BS 135.0 128.8 4.8 132.8
Material
Type
3/4" Base
97
4 North of black oak On top of
finish grade
BS 130.7 126.3 3.4 132.8
Material
Type
3/4" Base
95
5 North of black oak
building
On top of
finish grade
BS 133.9 126.9 5.5 132.8
Material
Type
3/4" Base
96
6 East of Linden
Building
Top of finish
grade
BS 138.2 130.3 6.1 132.8
Material
Type
3/4" Base
98
7 East of Linden
building
Top of finish
grade
BS 136.4 128.4 6.2 132.8
Material
Type
3/4" Base
97
8 North of building
Hickory
Top of finish
grade
BS 132.9 127.1 4.6 132.8
Material
Type
3/4" Base
96
File Name:
20001D05132021RB
5C9BB84E-3A1C-48DC-BC5B-91EA888690DF 2
Test
#:
Location:Elevation: Depth:Wet:Dry:% M:Proctor #:%
Proctor:
Pass Fail
9 North of building
Hickory
Top of finish
grade
BS 134.1 125.5 6.8 132.8
Material
Type
3/4" Base
95
10 East of building
Hickory
Top of finish
grade
BS 132.7 126.4 5.0 132.8
Material
Type
3/4" Base
95
11 East of building
hickory
Top of finish
grade
BS 137.9 131.2 5.1 132.8
Material
Type
3/4" Base
99
Remarks:
Ran tests on top of the curb finish grade at The Grove. Tested on curb grade between the Black Oak, Hickory,
and Linden buildings. Started to 2 and 4 inch tests, but Jacob came and gave more instructions for how to get
passings. Water and more compaction was then added, and backscats were done which resulted in many passing
tests.
Tested By:
Russ B.
Signature:
Date:
05/13/2021
Reviewed By:
E. Vail
Signature:
Date:
05/14/2021