Loading...
HomeMy WebLinkAboutSOIL DENSITY 22 - The Grove at Thomson FarmsFile Name: 20001D05132021RB 5C9BB84E-3A1C-48DC-BC5B-91EA888690DF 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20001 Contractor: Hill and Sons Excavation Project Name: The Grove Instrument ID 76560 Daily Standardization: Client: Stillwater Equity Partners Date: 05/13/2021 MS: 619 DS: 2555 Time Start: 10:00 AM Time End: 01:00 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 North side of building Hickory, at the halfway point of the building. Top of finished grade 4 133.7 127.8 4.6 132.8 Material Type 3/4" Base 96 2 East side of building Linden Finish grade 4 131.2 126.2 3.9 132.8 Material Type 3/4" Base 95 3 North of Black Oak building Top of finish grade BS 135.0 128.8 4.8 132.8 Material Type 3/4" Base 97 4 North of black oak On top of finish grade BS 130.7 126.3 3.4 132.8 Material Type 3/4" Base 95 5 North of black oak building On top of finish grade BS 133.9 126.9 5.5 132.8 Material Type 3/4" Base 96 6 East of Linden Building Top of finish grade BS 138.2 130.3 6.1 132.8 Material Type 3/4" Base 98 7 East of Linden building Top of finish grade BS 136.4 128.4 6.2 132.8 Material Type 3/4" Base 97 8 North of building Hickory Top of finish grade BS 132.9 127.1 4.6 132.8 Material Type 3/4" Base 96 File Name: 20001D05132021RB 5C9BB84E-3A1C-48DC-BC5B-91EA888690DF 2 Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 9 North of building Hickory Top of finish grade BS 134.1 125.5 6.8 132.8 Material Type 3/4" Base 95 10 East of building Hickory Top of finish grade BS 132.7 126.4 5.0 132.8 Material Type 3/4" Base 95 11 East of building hickory Top of finish grade BS 137.9 131.2 5.1 132.8 Material Type 3/4" Base 99 Remarks: Ran tests on top of the curb finish grade at The Grove. Tested on curb grade between the Black Oak, Hickory, and Linden buildings. Started to 2 and 4 inch tests, but Jacob came and gave more instructions for how to get passings. Water and more compaction was then added, and backscats were done which resulted in many passing tests. Tested By: Russ B. Signature: Date: 05/13/2021 Reviewed By: E. Vail Signature: Date: 05/14/2021