HomeMy WebLinkAboutCHECKLISTS - 06-00190 - 301 Jill Dr - New SFR60
1�
r -d
�_
In
z
Gh
tj
CD
I�
TA
CP
CL
CD
0
Ln
C'
b
z
y
a
t74
ct
�i
Try
PM
CD
00
Go
i
44
C3
W4r11
fn
CD
rA
P,
.
oc
4-b
a
7j
A
�5
all)
fs-+
ct
�i
Try
PM
CD
00
Go
i
44
C3
W4r11
FINAL INSPECTION CHECKLIST
Date:
Project: %W�,svoerar�)
c
Job Address: 30/
Building Permit Number: b(o 0/ id
The following c6mments
based on the 2000 edition of the., International Residential Code should be
Cz)ufvtiu ut�aure an occupancy permit is issued. This correctiar� fist is not a building permit. The appraval
of plans and specifications �d�es not Permit the violation of any section of the Intematio I R
sidential
Code or any federq'lstate or �oca� regulatian.
OUTSIDE .
,House Numbers (visible from the street
c
rade(y'a'r dI S' sloped away from foundatio'n)
�aiaewaiK & Landscape Strip 5wide (W/ 6" of granular borrow (hill 1211)) --T LS strip
,eLFront Setba
ck Coverage 60% min green
�
Windows.- Coversand Screens shall be releasable or removable from the.inside,or egress
Window V1lells rain_ 24" clear (out and above) well
_,z Exterior Steps (7 314 " max. rise & I D" min.
tread)
� Stairway Hand
rails 4 or more racers or over 30FF, (<4. max. spacing of uprights)
Guardrails(provide if over floor/grade#� 3� above & A� max sphere spacing for uprights)
-Ile Landings X36" x 36"miry.nv� req. of the� q fop of the stair if a doo'r does not swingy over stairs)
/Thresholds 'I 112" max. above floor or landing (? 314" max if door does not swing over landing)
E' Posts required to be treated5 redwood or cedar if in contact of concrete I earth}
/Roofing ono apparent leaks, installed properly and ra.ofing as per plans)
Masonry (lintels as per fable 70;x. r. 7
/Roof Ventilation has per plans}
INSIDE
Egress Dvors 4all egress doors musfi be able ire open from inside without use of keys or tools)
Safety Glazing provided in all doors, within 24" of door are and below 60", & 'in tub enclosure
�athroom Ventilation (either operable window or Fan that vents directly to outside)
Sinks, Bathtubs and Showers (check for caulking, operation and leaks)0
Stairway Illumination (switch at top and bottom) _
stairs (7 314"r ax. riser, 10 min, tread, (nosing 3/4"to 1 1/4" with solid risers)
Handrails'Cont X34" to 38", � 1!2" to wall, andgrip1X14" to 2" dia. u rp ight < 4"'Arlangular space 6" max }
Guardrails 36" high and continuous, Req'd 30" or more above grade or floor(, uprights 4'sphere max
spacing, triaQg_!j�arsacs 6" sphere max spacing}
Garage (Dry walled and gaped, firewall penetrations and electrical boxes, door to house 20 min, rated;
ducts penetrating firewall must be 26 gauge min. & not open to garage)
Z Ec cess Windows(clear 2�" width aid 24" height, 5.7 sf min.. opening with 44" max. sill height}
moke Detectors din each sleeping room, out in immediate vicinity and on each storylbasement-
sp[it levels (w[o doors), only on upper floor - interconnected without'a diseonnecting switch}
Foam Plastic (meets requirement of R31 8)
�ater Heater Anchorage over 4' with flex water conn. shall be anchored or strapped to building)
ZWater Heater Vent (check air flow with return in finished basement)
Clothes Dryer Ducts (solid metal ducts, no screws in duct & gent directly to outside)
XQct Supports Imetal ducts supported 10' min spacing & non metal as per manuf. installatian instr..)
Duct Insulation educt in non conditioned arias shall be insulated) �-
//Gas Line Supports spa 10'for up to 3I4", 12'for over 1" and 6for tubing up to 1 1/2"
"Hw.
I a I
4111 7kreITL l
Date-,
Project:
JobAddress:
Building Permit Number-- 6�,
.CHECKLIST
The following commends based an the 2003 edition of the Intematior�al Res�denfial Code should be
resolved before an occupancy perm -t is issued. This correction lisp is not a building permit. The' approVal
of plans and Specifications d+aes nofi P
0 0
ermit the violation of any section of the Intemational Residential
bode or any federal, stake or loc I regulations,
Exterior
Concrete Slabs (3 1l2 " min. thickness & 4" gravel.base min.) R506.1
Z.Braced Wall Panels (sheathin nail o�- sta le - 6",12"9) � po. c_ at edges & 0. c. in fl
dequateoe�A uplift control at floor line (sheathing slit late or 1
p on p
eld) Tahle 602.3(1)
J/
2X 36" straps 4' o. c. musio studs)
l 1,L; r�c�IU-gowns at garage panels <4' wide {APA narrow panel design if <2'8"}, hord-dawns must be on
double spud or 3X with all nail holes filled. R602.10 4 -
/Foundation waterproofing to finish grad-eR406.1
.a
r
rawE space ventilation 1 sf per 150sf awl vapor barrier 'i sfper 11500s�wlth�n 3' of corner
,Cripple Walls � �, hover �4 sized as � story, under � 4 must be
R408.1-2
solidly sheathed one side) R602.9
Mud SFE[ (bolts in proper location, nuts tightened, 2"x2"x3/16J.) washers (conditional}; pressure treaded or
redwood, joints blocked or under studs at wall and gaps grouted or .shimmed} R443.1.6.1 1' Rfi02.1 1 .'I
Frame
/Floor Sheathing and nailing yp. 314" T&G - 6" on edges & IT in field (perpendicu-1ar'to joist)
"ENNER& --- Joist Spacing and .Size has per plans)
_Bearing (1-1/2" min.) & L-appin (3 min. where joists lap over wall or beam)
_Notching Wepth-1/6. max., length -1/3 depth max., not in middle 113, ends- 1/4 depth max.) -TJI-NO
ter.
11 Baring (1l3 "d" max, >2" of tap or bottom or another hole or notch) TJ1 see chard
Cantilevers- Blocreinforcement span and spacing as per plans.
Joists Under Load Bearing Partitions (shall be doubled as per Section 502.3.3, if plumbing space needed,
the joists shall be blocked 4'o. c.}
. Girders and Seams (as per plans, nailed or mechanically connected to frame and proper bearing)
-. Joist Hangers (check location & nailed properly)
Draft Stop (required for over 1000 sq ft. of unusable space at floor/ceillng)
Basement Walls (pressure treated or redwood sill plate properly fastened to slab)
Stair Opening has per plan & properly supported with hangers or walls) .
Stairs check rise- 7 314" max., run- 10" min., rrari.- 318" max, width,-3'min. & headroom -. 5`-8"}
.!Wall Layout (as per plans)
Interior Wall Stud spacing (load bearing is same as exterior), 24" a.c. max.}
Bearing Wall Window and Door Headers Na'llin hedge lends)
Exterior Bearing Wall Stud Spacing -wa11s carrVinq roof load only: 2x4-1 6" o.c. 12'max
2x4-24" o.c. 10' max,- 2x6-16" o.c. 18' max.- 2x6-24" o.c. 16' max, one floor & roof: - 2x4 16" O.C.
10'max., two floors &'rOOf' 2x4-12° max 10' (Fig 602.3.2.(1-3))
Double Top Plate ooints lapped min: 2') or Single Top Plate (bearing Min 'f" & adequately tied at joints by
3"x6" steel plates w/ 6 8d on nails each side) R602.3.2
Stud Notchi%L(bearing 25% max.) Pori 40% max, 518" miry. to edges (60%'If doubled)
40"
Fire Blocking (rood space line at wall, concealed spaces & at studs over 10')*
firewalls (between duplexes & garage/home) , firewall penetrations - elec. boxes- rated, ducts --
26 gauge & not open to garage, door ,20 minute rated min.
Roof
/`Truss details (35# snow load and 90 mph winds) See truss details
Roof Trusses (spaced and braced as per manufacturer)
Rafter and Truss Tie -Downs and hanqers
/o -
ZRafters Lateral Support (block at bearing when exceeding 5 to 1 rule (2x1 2)
Roof Sheathing: Nailing ("H" clips w/ 7/16"), edges -6" o.c., field -1 2" o.c.
� Attic Access (prov
ide 22" x 3011 min. access where^lear height > 301t)
k-0
Roof Ventilation (standard 1/150 or 1/300 if 50 - 80% is 3'
above eaves)
Mechan'icalRo....gh Plumbing Insp. Done?. _)
Manufacturer's installation instructions are with the appliance (IRC 1 06. 1.2/M1 307.1)
Equipment gas shutoff valves in same room AFP exception) and within 6` of appliance (IFGC 409,5}
0�f Sediment Traps (if not built into appliance: a� Furnace & W.H.� (IFGC 4a$.4)
Duct Supports and sealed metal - < spacing & Flexible — < 4' max -- (21j sag in 4'}
�r Clothes Dyer Duc�fs (so Id
metal ducts, no screws extending rota duc# &vent direcfly to outsiUe)
ZDuct insulation (insulation in non-conditione�--
d Space) g�
Room access 24" min width I Attic access clear opening 20x3O min (Under floor is
Pressure Regulators (access, vented, fee fitfin'g -each side) (IFGC 41p)
Gas pipes not in venfilating ar circu�atin air duct(IFGC�404.1 �
V00",
� Metallic as pipe bends are smooth & free from buckling,
S21a, 3:1�.
Prfm..q_c,%"ri= Tr�c+- W) i_�r:� � ��: ..
9 16
22x3O)(IMC 306)
cracks, or other damage (IFGC 405.2)
. ���~. � . �-J.. :.4.. r � Nom- - -� • � min auration Ib pressure drop
Gas Pipe Material: CSST Sch40 MP Copper Main Lige ft Diameter
Branch Lines.- Length
1)
If,
ff
ft
ft
ft
ft
ft
To POD
W,
ft
ft
ft
ft
ft
ft
Diameter Appliance/BTU's cif known)
i
.f� t t I L
• 7 ,—, r• r
• IN
—P IN 42 19 ko *j4 IF
■1
4
S Ir IF 41
is
IL v
Y al
1-4
y
1 + la
L44+�
J410 IF 0
,
;p 4hlie w
_
V: IN qv :F 3 ip
R ■
■
1■ '
pi WN
F& Ak�-t
I�
10-
■�
r "
NO
I
LU
mr LM
Ik
v RL
IF 11 F Al 11 IF
MIXa 'IN a :L a
Mi
p
]mi ID
i I Ie b ,■
Ise A, _ IN IP_
r _� _.�
mcgwAte -jlz4& W
r■ -
1.1P IM
177i IN
1111 FL
+ x F
A 4
ip Ph 70 is 39 EL. NIK
III t'6
* #L
i a �
Al � mar— � �
1 ■
■
AN i >o
0 ML
&PW6 S 1
rIII R � ST'!. � • J � .
F
Y ItI. + ]�qr
!IN
+
MI
or M fa K
pr 19
k6 R IN lei
� + 10 � i � arc BE • .
In R_a 4 k - -
F •
0 R , if FS V
ma _ 1 _111 I id
91
Awl ;±
Is P1
� i 9 V4F9M
EL
dl bt
� a
I a 'o IN
r M
Ic
X
b
1
I
9
94
1{
al
ar
0
i
SL
7�
+
ar
1+
1+
x
-
1�
1 ;
L7
`
i
SL
p
7�
+
p
1
H
m
7�
1+
1+
-
1 ;
1
H
m
11
91
NO
V
m
-1a
9p a
Z1
I
7�
1+
1+
11
91
NO
V
m
-1a
9p a
Z1
I
1+
-
`
MIN
1
107
+
■
I
gr
1+
-
MIN
1
■
I
gr