HomeMy WebLinkAboutREQUEST FOR PROPOSAL - 06-00184 - Madison Memorial Hospital - AdditionRZ/
A R C H f T E C T U R A L
n e u
S
REQUEST FOR PROPOSAL
ISSUE DATA: August 24, 2009 REvrslow M
RESPONSE TO: Owner Requested Ch;anqe
tN DUE; August 25, 2009--
PECT:iiiMemorial
F� pi l OWNER'
Rexburg, Idaho PROJECT
PROJECTV: 04130
ISLMadison
— --
�ii n Memorial Hospital CON TRACTOR:
SUBJECT: LEVEL 2 AREA "U. OLD ER CLINIC
ATTACHED: I I Pages & the following Full Size Sheets: AD102d,, A102d, Al 12dA152d,'A282
A36,2} All . d, A1603, MD 1 02d, CU
10 d# MPI a
Archit
tural Nexus, Inc,
www.archnexus.corn
SALT LAKE CITY
2150 5OUth 1300 Ea t
uile 200
Salk Lake i# , Ulan 84106
T 801-924-5000
F 801 -924.501D1
FOGA N
135 North Main 'Street
ui le 200
Logan, Utah 84321
T 435-753-2141
F 4 35.752 4 16-3
PHOENIX
1620 W, Fou n tal nh ead Pkwy.
Suite 602
Tempe, Arizona E5282
T 4M921.7577
F 48D�i .757,9
Please submit a fuji 'temized, quotation, }
pr n
documentation, for any changes in the Contract Sum and/or Time
Incidental to the Proposed modifications to the Contract Documents described below. Please submit your Pry
date
noted above, or in til manner in accordance with � � thethe ntr. t if not specified. Such Proposal ii b on id
f Con r i n Change irect �orin iuinclusion i� � �� r�
subsequent change Order. This Mast for Proposal
OrderConstruction Chan a Directive nor direct" � � I�
Proceed with h work ribed herein. This Proposal
includesall attachments noted, - hi h r t � Request
Irlludherein by reference.
DESCRIPTION:
1 t
Level 2 Are, T)" - Old ER Clinic
Per ther��,� f � r yin �r�ii Hospital",
11(-)w the .ran,",- 1--1#4 0 A ,, In 7 ".0% j the h� memorandums, sketches, n
F 4rawings
My Ulu L-eve'12 ?"Atrecn Lot cajid `Lhe 6-ew rev"sc--' � yang per the Owner. Th h a n to
on tr tion documents incl ud. but are not l i m t .o the
0 Under the existing Canopy only the shell(exterior walls thick non -reinforced concrete slab. iIFOrli be built. The Contractor is still to provide 2
The lin rtn a not of b remodeled into Cardiac Rehab,, Break Roorn 2nd Dictation
area.
The followingdoors i I l need to be given to the Owner
2408 2411, 2412.1 2413P241412423-1 2424,2427, and
new d oor 246 1 a wa s ad dd to the projectf
Form Version m Q 2005 Architectural Nexus. Inc. tri ed; 24 Augu i 2009 07:451
7 LAMP,
SA2WC04130 MEdison liospdaim lrudoii roposal iraons AF- 11 111111111111111 11111 1�
ri 1d
10 age ''Ill of 1
REVISIONS
NEXUS PROJECT #: 04130
CHECKED By: AE
DRAWN BY.- GWT
CURRENT/BID DATE:
SHEET CONTENTS
INTERIOR
ELEVATIONS
11.01.05
i1ULd AZdU bUALL 14KUM Al UZa L.
IT cl
C
E
197
X102
C6 NOT USED -
A280 SCALE: 1/4 IR =1'•0"
PR #117,
L
pf
FROM Al 02d
T
REVISIONS
r" -
NEXUS PROJECT#:
CHECKED BY:
DRAWN BY:
04130
JAE
CMB
CURRENT/BID DATE: 1 1.01.05
SHEET CONTENTS
ARCHITECT -URAL
SECTION DETAILS
i
1
li
E
REVISIONS
ADD #1 11 .18.05 swk
Q RFI #309 06.05.07 CMB
RFI #407 i 1.05.07 CMB
A4 PR #8 1 09.09.08 CMB
PR -5\ #60 09.15.08 CMB
1 PR #97 05.12.09 CMB
NEXUS PROJECT #.-
CHECKED
:
CHECKED BY;
DRAWN BY:
JAE
CURRENT/BID DATE-. 11-01'.05
SHEET CONTENTS
DOOR SCHEDULE
LEVEL 2
REVISIONS
IVP R # 61 09.11.08 CMB
PR #85 09A,26-08 CM1
PR #108 06.12.09 CMI
4v PR #117 08.10.09 CMB
N Exus PROJECT #:
CHECKED BY:
JE
URRE TBI DATE* ltot05
SHEET CONTENTS
DOOR SCHEDULE
LEVEL 2
i0
f
p"
REVISIONS
Q X11 '
0
01
Revised
Revised
PR #93
PR #117
5�1�
11.18.05
11/18/05
Schedule
12/02/05
Schedule
NEXUS PROJECT #-.
CHECKED
ci
ci
02.20.09 CMB
05.13.09 CMB
08. 1 OoO9 CMB
CURRENTIBID DATE:
SHEET CONTENTS
ROOM FINISH
SCHEDULE
LEGEND
04130
JAS
1 1.01,05
VAN E3C3r=RUM
S=RAIVK
ASSOCIATES r.
r 1, a rs # r� �, rj r K 11 �
DATE: August 21, 2£}09 MEMORANDUM
TQ; Chris Broders
Architectural Nexus (SLC)
215Q South X300 East, Suite 200
Salt Lake City, UT 84106
FROM: Jed Lyman
PROJECT NO. 4011
PROjECT: Madison Memorial Hospital Expansion and Renovation
i
LF
RE: Proposa! Request No. 117 For owner Changes to Level 2 Area D
J. Howard VBoarem, P,E,
Please issue the following to the Contractor as PR No. 117. The information regards Owner regUeste-d
changes to Level 2 Area G.
Please find attached the following revised full sheets:
MDQ 02d Level 2 Mechanical Demolition Pian Area D PR No. 117
M1 02d Level 2Mechanicaf Pian Area D PR Na. 177
MP0102d Levu 2 Mechanical Piping Demolition Plan Area d !'R No. 117
MPI 02d Live! 2 Mechanical piping Plan Area D PR No. 117
PDiQ2d Level z Plumbing De m olffio n P Ian Area D PR No. 117
P1 02d Level Plumbing Plan Area, D PR No. 117
Joan D. Frank P.E.
Kim P.Hards,P.E-
OaVid R Baranowkj, p_fi,
Richard G , Reoder, P.E.
JDS,Oph V. &Minors, F.E
Byron 1t. Toroersen, P.E.
Donald K, Bradshew, P.E.
njarnin L. DBVM, ]P�E.
Ladd M. R � h, P. E
MI-thael S. Mooney
Neil K Spencer, p.E,
`,fade W, Ren:,fen, p.E,
Steven T. Shepherd, P.E.
Stan W. Johrisl P. E,
.Lawrerlm A, Re ber
MQ1 02d Level 2 Mechanical Dem011tion Plan Area D COnstruct-"On Documents — �ecerrz��f ; 8, �0�'5
�l I 02d Levef 2 M+�chanica! Plan Area d Construction Documents — December 16, 2005
MPDS 02d bevel 2 Mechanical Piping Demolifion Pian Area D Construction DocuMents—Daoember 1E, 2005
MPI 02d Level 2 Mechanical Piping Play Area D Construction flacum�n�s � December 16, 2405
PD102d Level 2 Plumbing Demoli�in Plan Area C] Cvnsfruciion Documents -- December 1s, 2p05
Pf aid Levet 2 Plumbing Plan Are�a D Construction Documents — December 16, 2005
Pease let us know if anything further is needed
: a4 0WA 011 lad n Memorial Ho:5�pi laf e0ir ICOnsi ogo n 1 nisl 0r \ P 4011 PR #117 .,r
Change for Level 2 Area D 200!90821.d,�c,
ALT LAKE VT Y
330 Sou �h 3 00 East
Sall Lake City, Utah a4111
801, Mm314 8 * Fax 00 l .' 3.0.315()
T. GEORGE
1 070 W. 16 oo . Sprite #1
L Gearge, fth 84 790
435.674.4800 , Fax 45,674,7
PHOENIX
1620 W. Pountainhead Pte,
TQ P B, Ari zcO a 852B2
4-80,889-5075 - Fax 460,889,50-16
LOGAN
0 W891 Cache Valley RA. Bld I Ste,
Logan, Uta M41
5.75. 1 - Fax 435,752.=E
PO ' TELLO
811 W. Gedior Skeei
POCatek 1 1) 81
208.4-7&461 R FOX ,478-61-7