Loading...
HomeMy WebLinkAboutCHECKLISTS - 06-00166 - 299 Seagull Dr - New SFRr M 0 ICD CD A 'CD �t C - Id CD -CD �l _ 0 9 o 0 IDF--� CD Q -CD CL Do kA.�. hL TACD - �:Y` _ . 0 L�j : LO CD c CD "—` �-..m Q� �• .. k-`' p lb LA CLL Q) aq CD�-` �+cbCD Z3 a '0 'Q r u tj OL •CD a --t ,--, rA do -IN m C�a cd r i 0 CL _ CD ;EN 4"- CD I'd LD+ co, CD C -. F--4' CP -OV th " CD cn �-' JEW*CA :0 (D c 04) �I , • F ' cn r6+ }yLn �7 q . i.� CD , & I � C. F M. ~J F _ _ _ y O � con�. CD "CI . CDF �! ICD i--+- '' 4�6 ON 4 4�i, �--+ IL + �' u 0 CD c:3 CiJ CL C 1' �..� .y� �. *6 �: ' P4 ct �T 71 73 CD �-�► -' p4 .`y p-4 S4 w vF. d, Ei: t-4 oa V3LZ n 4 i T.- ..—d _ C + x al 7j 00 4f r R 4-4 C� ' al t - Ro a F 0 MC, J �As1: rl I ip IPA Fm 14 c Ll F cj r� r En WO FINAL INSPECTION CHECKLIST Date: i 1_ S. - Project: �-}et�rl-P Job Address: �� j Building Permit Number: 5 The following comments used on the 2000 edition of the International Residendal Code should be resolved before an occup ncy permit is issued. This correction list is not a building'perrn�t.'of plans and specifications does, notpermit The'ap'p'roval the violation of an section of thelnferna�fanaly Residential Code or any federal, state or ioca! regulation, OUTSIDE House Numbers (visible from the -street} �= Grade (yard Is sloped awa' fro y M foundation} Sjdew-a"lk & La'ndscape Strip 5'' wide (W1 6 ­TLS strip of granular borrow (hill 12 ,i/front Setback Covera60% min green 1Nin�d�a WS -. Covers and Screens (shall be releasable or removable firm the inside fvr egress �,V11'indQ►nr' Wells min. 24" clear out and above XA1Q11 .��� Exterior Sfeps m ax, rise & 10" m 1 n. tread} (7 3/4 Sfiairway Handrails 4 or more risersor over'30" (<4" max. spacing of uprights) Guardrails (provide if over 3011 aboVe floor/grade & 4" max sphere spacing for uprights) Landings (36" x ,36" m in:, (not. req- at the top of the stair if a door does not swing over stairs) shvlds 1 1/2 max. above floor or landing (7 3i4" max if door does not swim over handing) ZP osis (required to be treaded, redwood or cedar i f in contact of concrete l earth) /Roofing ono apparent leafs, installed properly and roofing as per plans) Masonry (lintels as per table 703.7. 1) ""Roof Ventilation has peg- plans) -,?j INSIDE gress Doors fall egress doors must be abbe tQ open from inside without use o� k�1ys or tools) Z—afe�Gla4ing provided in all doors, w'r�hin 24" of door arc and below 5�1111111111Y', & in tub enclosure EBathr�aam Ventilation �eith�r operable window or fan that vents directly to outside) Sinks, Bathtubs and Showers (check for caulking, operation and leaks} b Zstairway Illumination (switch at fop and bottom).. Stairs (7 314 11max. riser, 1 0"' min. tread, (nosing, 3/41, to 1 X14" with solid risers) 6 Lflandrails Cont (34" to 38", 1 1/2" to wall, and grip 1 114" to 2" dia. u ri h� � 4"Ariangular space �" max) C!Wuardralls 36" high and continuous, Req'd 3Q" or more above grade or floor(, uprights 4" sphere max spacing, triangular space 5" sphere max spacing) Garage (Dry walled and taped, firewall pene#rations and electrical boxes, door to rouse 2-0 min. rated, ducts penetrating firewall must be 25 gauge min, & not open to garage) - E,gress Wmindows (clear 20" width and 24" height, 5.7 sf min. opening with 44" max. silt height) Smoke Detectors din each sleeping room, outside in immediate vicinity and on each story/basement- Smoke level's (w/o doors), only on Lipper floor --all interconnected without a disconnEloting switch} Foam Plastic (meets requirement of 8318) ater Heater Anchorage as over 4' with flex waterater conn. shall be anchored or strapped to building} V1l =� Water Neater Vent (check air flow with return in finished basement) �Clath�es Dryer ducts (solid metal ducts., no screws in duck & vent directly to outside} [)Uct Supports Imetal ducts supported 10' min spacing & non metal as per manuf. installation instrJ � Duct Insulation (duct in non conditioned areas shall be insulated) a� Line Supports spa 10' for up to 314", 12' for over I" and 6'fo,r tubing up to 1 1f2"