Loading...
HomeMy WebLinkAboutSTAFF REVIEWS - 06-00148 & 149 - Health Education & Business Development Center - Site Plan1 4�rK P-.111�101 J4 PO s CXTY 0 F RE XBURG April 25, 2006 ig Review Action Permit Number: 06 00149 Project Name: Health Ed'. & Business Dev Center Project Type: Commercial New Re -view Item _ Actians Requ�red for Approval Building Department Review �`x� � '7, Building Type Compliance wilding tyke is VB. Occupan cy is B with upper level conference roam classified as A. The A occupancy is less than 1Q% and considered accessary to the B occupancy as per the 2003 Internationional Building Cade Section (113C) 302.2. Z Height and Area Review Plumbing Sewer Drain Review L( Plumbing Storm Dram Review 5' Plumbing Potable Water Review (op Water and Sewer Service ?Complies with approved Site Plan Review Accessibidaty Re- � Mechanical Review IV Interior Environment I( Energy Conservation Compliance Review Freight and area of building fall within exceptable levels as per the building cede. The area was modified by using a Sprinkler system. All back to back fixtures ars required to be installed with fixturefiftings. All drains, waste and vents are required to be tested and inspected before covering. Required to be bested and inspected before covering. All water lines are to be installed according to the Uniform Plumbing Cade. Required to be tested and inspected before covering. All services are required to be tested and inspected before covering. Make sure water department approves meter location before installing. Site pian has not been approved as of 4/5/06. The shower must meet the requirements of the ICC/ANS] Al 17.1. The Envelope Compliance Certificate does not meet the requirements of the 2003 International Energy Conservation Cade (IECC). The input 11 into the program is missing door and window information. The building is required by Section 8D2.3.5 of the IECC to have a vestibule at the P.0 Box 280 19 E. Main St. Rexburg, Idaho 83440 Phone (2D8) 359-3020 Fax (208) 359-3022 —Approved 04/05/2006 04/07/2006 04/07/2006 04/07/2006 04/07/2006 04/07/2006 CI`T'Y 0 F I -R—E X B U R, G April 25., 2006 Permit Number: 06 00149 Project Name: Project Type: Review Item (I.,,Exiting REVIEW Review Action Health Ed. & Business Dev Center Commercial New "Building Code Fire Compliance Review /4' Miscellaneous I )Waste Water Grease Trak Farm 1(..* Waste Water Application L '� Structural Review Actions Re�ured for Appr trona entry. The upper level conferance room requires two means of egress and panic hardware on the doors. Provide exit lights and emergency lighting in the classroom an the 1st leve! and emergency fighting in the upper ievel lobby and the conferance room. Some of the exit signs on the upper bevel da not point in the direction of the closest or most logical exit. Doors to stair structure must be rated. Identify on plans a water resistive barrier on exterior walls as per 1113C Section 1404. identify masonry flashing and weepholes as per l'BC Section 1405.3. 1. A tfaad elevation certificate is required prior to obtaining a Building Permit. 2. Please provide sructurai calculations. 3. Provide a Fetter from the Special Inspections firm that identifies all inspections and their frequency that they are under contract to perform. 4. The Structural Drawing Notes on page S1 of the drawings identifies that no concrete special inspections are required. This is incorrect. Special inspecions are required for the foundation walls. At completion of structural steel fabrication a report from the fabricator is required as per IBC Section 1704.2.2. 5. Identify haw roof top mechanical units are to be connected so they meet the requirements of IBC Section 1621. 6. A soil report is mentioned by the structural engineer. Provide a ropy of the repot#. P-0 Bax 280 19 E. Main 5t. Rexburg, Idaho 8344() Phone (208) 359-304 Fax (208) 359-322 App-r+aved. ft 4 CI7 REXBURG April 24, 2006 Permit Number: 06 00148. Project Name: Project Type: Review Item Review Action Health Education & Business Development tenter Site Plan Review Building Department Review I—. E % .Setbacks and Propertly Lines I J%.- Snow Storage ItI. Number of Parking Spaces ,7 � Fire Separation YZ� .Perking Configuration 7,SNiscellaneous 16.Plumb'Ing Review Parcel #'s RPROOOW2010030 Action Meet code and ordinance requirements. Snow storage is not identified, but there is plenty of space available. 76 spaces are required, 82 ars provided. Meets code requirements. As, per Section 1106.1 of the 2003 I nternativna! Building Code (IBC), 4 handicapped spaces are required. The 19'wide aisle at the northeast side of the building does not meet the width requirements for two-way traffic. Sidewalk is not shown along the street. Also please provide an accessible route as per IAC Section 1104.3 from the building to the public right-of-way without using the driveways. P.0 fox 280 19 E. Main St. Rexburg, Idaho 83440 Phone (208) 359-3020 Fax (208) 359-3022 Q rowed 03/31/2006 03/31/2006 03/31/2006 03/31/2006 M s C1 TY 0 F EXBURG April 25, 2006 160 Review Action Permit Number: 06 00149 Project Name: Health Ed. & Business Dev Center Project Type: Commercial New Review Item ons Required f dire Department Review < < Standpipes NIA '-2 Required Fire Flow 3 ,Water Supply A .Alarm Systems Other Comments Commercial Cocking F i r Access Roads Fire Extinguishers Automatic Fire Extinguishing Systems Parcel #'s See site play review. See site plan review. Alarm system is required. Please resubmit plans with coverage in all common, public and employee work areas. Please submit letter of intent from certified alarm contractor. Plans are not approved as shown. Audio mist meet the requirements for 907.10.2 of the International Fire Code. Lock box is rewired for this occupancy. Forms ars available at the Rexburg Fire Department, Please Contact 359.3010. Stave in room 201 may require a caomercial cooking hood. Please submit information on stvve. See site plan review. Occu ancy requires extinguishers. Please show locations of extinguishers as requied by the 2003 International fire code. Submit letter of intent from certified sprinkler contractor. Plans are required to be approved by the State Fire Marshall before installation occurs. P.0 Box 280 19 E. Main St. Rexburg, lciaho 83440 Phone (2D8) 359-3020 Fax (2D8) 359-3022 04/07/2006 0 1W XB TY 0 IF REXBURG America's Run if), Communal April 24, 2006 Review Action Permit Number: 06 Q0148 Project Name: Health Education & Business Development center Project Type: Site Plan Review Review Idem Actions Reau[md_f!Dr Approval Fire Department Review ( Additional Comments 2 Water Supply Fire Access Roads Fire Lane Signage Parcel #'s sir TE RPROOOW2010030 -A lock box will be required for this structure prior to final occupancy, -if you have any questions please contact Chris at 7Q5-1312. Plans show one hydrant an southeast side of building lot and one on the corner of 3rd East and nth North. For Type V -B construction with a full fire suppression system an additional hydrant will be required. (Based on 33,677 sq. feet} Site pian shows Phase One and Phase Two. Are both phases going to be completed at the same time or will there be a delay between the construction phases? Phase One details an addition to the parking lot (for the existing structure) which would require a fire apparatus turn -around as it exceeds 150 feet. The perking lot on the easy side of Phase Two sows a narrowing of the access to 1,9 feet, the minimum requirment is 20 feet. Additionally, a fire apparatus turn -around is required as it exceeds the 150 foot mark. Fire lane signage and red curb paintingwill be required on the east side and the front of the new building. Fire lane signage also required on east side of parking lot of existing structure_ P-0 Box 28.0 19 E. Main St. Rexburg, Idaho 83440 Phone (208) 359-3020 Fax (2Q8) 359-3022 im-9 - 0 M v 03/2 3/2006 GO 4 � RE CBLTRG April 24, 2006 Permit Number: 06 00148 Project Name: Project Type: Review Action Health Education & Business Development Center Site Plan Review Review Item Public Works Review Approved Site Plan Parcel #'s RPROOOW2010030 Act! I . The site plan shows the storm water drainage going unto city property, Site drainage must be contained onsite or special arrangements made with the city_ 2. There is no lighting plan as required by the development code for review. 3. No SWPPP is in1cude for the control of site runoff control during construction. RO Box 280 19 E. Main St. Rexburg, Idaho 83440 Phone (208) 359-3020 Fax (2a8) 359-3022 4^ F -D t YTF -tEXBURG Antericals Family Community April 25, 2006 '1 Review Action Permit Number: 06 00149 Project Name: Health Ed. & Business Dev Center Project type: Commercial New 19 E Main St. Rexburg, fdaha 83440 Phone (2p8) 359-3020 Fax (208) 359-3D22 Review Item Actions Re wired fi r A _prowl _Approved Administrative review Permit Tech Notes Parcel #'s RPROOOW2010030 Permit Application needs to be submitted.