April 25, 2006
ig
Review Action
Permit Number: 06 00149
Project Name: Health Ed'. & Business Dev Center
Project Type: Commercial New
Re -view Item _ Actians Requ�red for Approval
Building Department Review �`x� � '7,
Building Type Compliance wilding tyke is VB. Occupan cy is B with upper
level conference roam classified as A. The A
occupancy is less than 1Q% and considered
accessary to the B occupancy as per the 2003
Internationional Building Cade Section (113C)
302.2.
Z Height and Area Review
Plumbing Sewer Drain Review
L( Plumbing Storm Dram Review
5' Plumbing Potable Water Review
(op Water and Sewer Service
?Complies with approved Site Plan Review
Accessibidaty Re-
� Mechanical Review
IV Interior Environment
I( Energy Conservation Compliance Review
Freight and area of building fall within exceptable
levels as per the building cede. The area was
modified by using a Sprinkler system.
All back to back fixtures ars required to be
installed with fixturefiftings. All drains, waste
and vents are required to be tested and
inspected before covering.
Required to be bested and inspected before
covering.
All water lines are to be installed according to
the Uniform Plumbing Cade. Required to be
tested and inspected before covering.
All services are required to be tested and
inspected before covering. Make sure water
department approves meter location before
installing.
Site pian has not been approved as of 4/5/06.
The shower must meet the requirements of the
ICC/ANS] Al 17.1.
The Envelope Compliance Certificate does not
meet the requirements of the 2003 International
Energy Conservation Cade (IECC). The input
11
into the program is missing door and window
information. The building is required by Section
8D2.3.5 of the IECC to have a vestibule at the
P.0 Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone (2D8) 359-3020
Fax (208) 359-3022
—Approved
04/05/2006
04/07/2006
04/07/2006
04/07/2006
04/07/2006
04/07/2006
CI`T'Y 0 F
I -R—E X B U R, G
April 25., 2006
Permit Number: 06 00149
Project Name:
Project Type:
Review Item
(I.,,Exiting REVIEW
Review Action
Health Ed. & Business Dev Center
Commercial New
"Building Code Fire Compliance Review
/4' Miscellaneous
I )Waste Water Grease Trak Farm
1(..* Waste Water Application
L '� Structural Review
Actions Re�ured for Appr
trona entry.
The upper level conferance room requires two
means of egress and panic hardware on the
doors. Provide exit lights and emergency
lighting in the classroom an the 1st leve! and
emergency fighting in the upper ievel lobby and
the conferance room. Some of the exit signs
on the upper bevel da not point in the direction of
the closest or most logical exit.
Doors to stair structure must be rated.
Identify on plans a water resistive barrier on
exterior walls as per 1113C Section 1404. identify
masonry flashing and weepholes as per l'BC
Section 1405.3.
1. A tfaad elevation certificate is required prior
to obtaining a Building Permit.
2. Please provide sructurai calculations.
3. Provide a Fetter from the Special Inspections
firm that identifies all inspections and their
frequency that they are under contract to
perform.
4. The Structural Drawing Notes on page S1 of
the drawings identifies that no concrete special
inspections are required. This is incorrect.
Special inspecions are required for the
foundation walls. At completion of structural
steel fabrication a report from the fabricator is
required as per IBC Section 1704.2.2.
5. Identify haw roof top mechanical units are to
be connected so they meet the requirements of
IBC Section 1621.
6. A soil report is mentioned by the structural
engineer. Provide a ropy of the repot#.
P-0 Bax 280
19 E. Main 5t.
Rexburg, Idaho 8344()
Phone (208) 359-304
Fax (208) 359-322
App-r+aved.
ft
4
CI7
REXBURG
April 24, 2006
Permit Number: 06 00148.
Project Name:
Project Type:
Review Item
Review Action
Health Education & Business Development tenter
Site Plan Review
Building Department Review
I—.
E % .Setbacks and Propertly Lines
I J%.- Snow Storage
ItI. Number of Parking Spaces
,7 � Fire Separation
YZ� .Perking Configuration
7,SNiscellaneous
16.Plumb'Ing Review
Parcel #'s
RPROOOW2010030
Action
Meet code and ordinance requirements.
Snow storage is not identified, but there is
plenty of space available.
76 spaces are required, 82 ars provided.
Meets code requirements.
As, per Section 1106.1 of the 2003 I nternativna!
Building Code (IBC), 4 handicapped spaces are
required. The 19'wide aisle at the northeast
side of the building does not meet the width
requirements for two-way traffic.
Sidewalk is not shown along the street. Also
please provide an accessible route as per IAC
Section 1104.3 from the building to the public
right-of-way without using the driveways.
P.0 fox 280
19 E. Main St.
Rexburg, Idaho 83440
Phone (208) 359-3020
Fax (208) 359-3022
Q rowed
03/31/2006
03/31/2006
03/31/2006
03/31/2006
M
s
C1 TY 0 F
EXBURG
April 25, 2006
160
Review Action
Permit Number: 06 00149
Project Name: Health Ed. & Business Dev Center
Project Type: Commercial New
Review Item ons Required f
dire Department Review
< < Standpipes NIA
'-2 Required Fire Flow
3 ,Water Supply
A .Alarm Systems
Other Comments
Commercial Cocking
F i r Access Roads
Fire Extinguishers
Automatic Fire Extinguishing Systems
Parcel #'s
See site play review.
See site plan review.
Alarm system is required. Please resubmit
plans with coverage in all common, public and
employee work areas. Please submit letter of
intent from certified alarm contractor. Plans are
not approved as shown. Audio mist meet the
requirements for 907.10.2 of the International
Fire Code.
Lock box is rewired for this occupancy. Forms
ars available at the Rexburg Fire Department,
Please Contact 359.3010.
Stave in room 201 may require a caomercial
cooking hood. Please submit information on
stvve.
See site plan review.
Occu ancy requires extinguishers. Please
show locations of extinguishers as requied by
the 2003 International fire code.
Submit letter of intent from certified sprinkler
contractor. Plans are required to be approved
by the State Fire Marshall before installation
occurs.
P.0 Box 280
19 E. Main St.
Rexburg, lciaho 83440
Phone (2D8) 359-3020
Fax (2D8) 359-3022
04/07/2006
0
1W
XB
TY 0 IF
REXBURG
America's Run if), Communal
April 24, 2006
Review Action
Permit Number: 06 Q0148
Project Name: Health Education & Business Development center
Project Type: Site Plan Review
Review Idem Actions Reau[md_f!Dr Approval
Fire Department Review
( Additional Comments
2 Water Supply
Fire Access Roads
Fire Lane Signage
Parcel #'s
sir TE
RPROOOW2010030
-A lock box will be required for this structure
prior to final occupancy,
-if you have any questions please contact Chris
at 7Q5-1312.
Plans show one hydrant an southeast side of
building lot and one on the corner of 3rd East
and nth North. For Type V -B construction with a
full fire suppression system an additional
hydrant will be required. (Based on 33,677 sq.
feet}
Site pian shows Phase One and Phase Two.
Are both phases going to be completed at the
same time or will there be a delay between the
construction phases? Phase One details an
addition to the parking lot (for the existing
structure) which would require a fire apparatus
turn -around as it exceeds 150 feet.
The perking lot on the easy side of Phase
Two sows a narrowing of the access to 1,9
feet, the minimum requirment is 20 feet.
Additionally, a fire apparatus turn -around is
required as it exceeds the 150 foot mark.
Fire lane signage and red curb paintingwill be
required on the east side and the front of the
new building. Fire lane signage also required on
east side of parking lot of existing structure_
P-0 Box 28.0
19 E. Main St.
Rexburg, Idaho 83440
Phone (208) 359-3020
Fax (2Q8) 359-3022
im-9 - 0 M v
03/2 3/2006
GO
4 �
RE CBLTRG
April 24, 2006
Permit Number: 06 00148
Project Name:
Project Type:
Review Action
Health Education & Business Development Center
Site Plan Review
Review Item
Public Works Review
Approved Site Plan
Parcel #'s
RPROOOW2010030
Act!
I . The site plan shows the storm water
drainage going unto city property, Site drainage
must be contained onsite or special
arrangements made with the city_
2. There is no lighting plan as required by the
development code for review.
3. No SWPPP is in1cude for the control of site
runoff control during construction.
RO Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone (208) 359-3020
Fax (2a8) 359-3022
4^
F -D t
YTF
-tEXBURG
Antericals Family Community
April 25, 2006
'1
Review Action
Permit Number: 06 00149
Project Name: Health Ed. & Business Dev Center
Project type: Commercial New
19 E Main St.
Rexburg, fdaha 83440
Phone (2p8) 359-3020
Fax (208) 359-3D22
Review Item Actions Re wired fi r A _prowl _Approved
Administrative review
Permit Tech Notes
Parcel #'s
RPROOOW2010030
Permit Application needs to be submitted.