HomeMy WebLinkAboutMATERIALS & TESTING INSPECTIONS (1) - 06-00148 & 149 - Health Education & Business Development Center - Site PlanATERIALS
TESTING &
INSPECTION
El Environmei9fal Services
Val Christiansen
City of Rexburg
P0 fox E
Rexburg, ID 8 3 440
'eotechn'cal Engineering
W
-,,onstrucl'on Nlaferials Testi�iq
Phone
Fax:
Othen-
PAGE #1 OF I
REVISION DATE 21112007
R -.\EASTERN
GDH\ 06 R EP D RTs\E.6=0'103 -
HEALTH EDUC & BUS
D E`V� R PT02 8 SWE - D 0 C
D SnsDections
Project: Health Education &Business
Development Center Phase 11, Rexburg
Project Manager: Dan King
Insp,ta^to Josh Cla"
Inspection Date: January 18, 2007
Revised Date: January 30,1 2007
STRUCTURAL STEEL WELDING INSPECTION REPORT
On the above date., our representative performed work on the referenced proj ect as reported below.
MTI inspector arrived on site to re -inspect items of concern on report dated November 7, 2006 (report 027swe).
All items have been repaired and re -inspected to satisfactory condifions. except bolted connection on row G at
gridline 3 on roofline of Level 1; has not been welded per AFI from Mark Andrus to Gary Palmer dated
January 1 0, 2007. Still waiting fax RF1 concerning skylight splicing that was done to span or fill excessive
ive
gaps.
d
rf there are questions concemin (rptQ2$su�e.,�4 this report doc), please contact the Project Manager listed above.
L-ld
Respectfully submitted..
MATERIALS TESTING &INSPECTION INC.
- F46PA
Reviewed by: George DuPont
Corporate Construction Services Manager
CC: Kurt Karst, Alderson Karst Mitro Architects, PA; Ted Hendricks, East Central Idaho Planning &Development Association;
Mark Andrus, G & S Structural Engineers, Arden Smith, Ormond Builders,, Inc.; Val Christiansen City of Rexburg
1230 North Skyline Drive, Suite C, Idaho Falls, ID 83402 208-529-8242 Fax: 208-529-6911
EmaiLqie'
mtia-mtkid. com, Website" www.mtj-i-d.com
xMATERIALS
TeSTING
INSPECTION
L) Environmental Services
Val Cluistioansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
U Geotechnical Engineering
13 lon Materials Testinci
Phone:
Fax,
Other,
PAGE #1 OF 1
REVI m DATE 113012007
HEALTH EDUC & BU.
DERPT, DOC
LJ Dern ;Hadi .
Project: Health Education & Business
Development Center phase 1Y, Rexburg
Project Manager: Dan ming
Triopector: Josh Clark
Inspection Date: January 18y X007
STRUCTURAL STEEL WELDING INSPECTION REPORT
On the above date, our representative performed work an the referenced project as reported below.
MTI inspector arrived on site to re -inspect items of concern on report dated November 7, 2006 (report 027si4)e),
All items have been repaired and re -inspected to satisfactory conditions!, except bolted connection on row G at
gridline 3 on roofline of Level 1; has not been welded per RFI from mark Andrus to Gary Palmer dated
January 10, 2U07. Still waiting for RFI concerning skylight splicing that was done to span or fill excessive
gaps.
If there ars questions concem10
ing this report (rp102.8si4)e.doc), please contact the Proj*ect Manager listed above.
Respectfully submitted,
MATERIALS TESTING & INSPECTION ING,
woo
RevieNved by: George DuPont
Corporate Constructioii Services Manager
Kurt Karst, Alderson Karst M.I'tro Architects, PA; Ted Hendricks,East Centra. Idaho Planii-ing & Development Associati`on;
Mark Andrus, G & S Structural Engineers; Arden Smith Ormond Builders Inc. • Val Christiansen City of Rexburg
1230 North Skyline Drive., Suite , Idaho Falk, ID 83402 208-529-8242 Fax, 208-529-6911
2 \O t+
2ti: is
g 'FO
XOr
MATERIALS
TESTING
r,}},
INSPECTION
PAGE #1 OF I
REVISION DATE 1127/2007
TAS F E R 1kR
IDAH0\2006REPORTS'E60103CHEALTH EDVC & BUS
Q Environmental SeR/ices El Geotechnir-,al Engineering L) ('-/onstructlon MalLerialls TestinQ A Special Inspections
'al C
City of Rexburg
PO Box 280
Rexburg, 1
Phone:
Fax:
Other,
Project,,: Health Education & Business
Project, Manager:
Inspector:
Inspection Date,
Development Center
Dan King
Josh Clark
January 18,. 2Q07
STRUCTURAL STEEL WELDING INSPECTION REPORT
Phase Ix, Rexburg
an the move date, our representative perfon'ned work on the refereneed project as reported below.
M 1 -1 inspecLor arrived on site to re -inspect items ot concern from report dated November 7, 2006 (report
D�7s�ve). Ali concerns have been repaired and inspected in compliance to RFI's, except bolted connection at
Row G on gridline 3 has not been welded per RFI; and still need RFC's for 1St floorskV11'9h1- splicing, that v�as
done to span or fi11 excessive gaps.
If there are questions concerning this report (rpt028swe), please contact the Project Manager Listed above..
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Revi*ewe(l b7 George DuPont
CTororate11anager
CC Kurt Karst, Alderson Karst Mitro Architects, ; Ted Hendricks,east Central Idaho Planning
Mark Andrus, G & S Structural. Engineers; A-rden Smith, Onnorld Builders, Inc.; Val ity of Rexburg.
1230 (Worth Skyline Drive,Suite C, Idaho Falls, 1C 83402 208-529-8242 Fax: 208-529-6911
Email: ei ti ti-id.cr Website: www.mti-id.com
MATERIALS
TESTING Fr
INSPECTION
PAGE #1 OF
RFviicNDATE; 11412007
RryEASTERN
FDHYO0jEPORI 4E
0 103
HEALTH EDDC & BUS
J Environmental Services D Geotechnical Engineering LJ Construction Materialls TestingU Special Ins
Val Christiansen phone
City of Rexburg Fax:
PO Box 280 Other:
Rexburg, ID 83440
:Project: Health Education & Bus'a.ess
Development Center Phase II, Rexburg
Project Manager: Dan King
Inspector; Josh Clark
Inspectivn Dade: November 7, 2006
STRUCTURAL STEEL WELDING INSPECTION REPORT
On'the above dale, our representative performed work on the referenced project as reported below.
Arrived an site and visually inspected the competed welding performed by qualified welders using a SMAS
process with E701 8 ele-ctrodes. Inspecfion consisted of single pass fillet welds.
Note: Need RFI and details. of welded knife plates and on skylight frame. The maj'orfty of vertical welds were
welded down -hand. See list below for other needed RFPs and areas that need attention:
1St floor
Row F aidline 3 - bolts not snapped off
y Row Ggridline - 3 bolts need match marked; RFI for field welded column to beam connections
Raw G gridline 7 to 10 — tighten drag strut bolt's
Row $ gridline 6 to S - tighten drag strut bolts
West
staieray needs
dolts
in angle
Row
F gridline 10 —
short
bolts
Row G gridline 10 - missing a dolt thole in beam was not in cozxn.ection)
Rove G gridline 9 — short bolts - top of beam calumu1 connection
2 n floor
Raw B gridline 10 — fading surfaces not in contact
Row B giidli*ne ? — Paying surfaces not in contact
Row B gridline 3-' — crest side of faying surfaces not in contact
Row D.3 gridline 2 —bolts too short
Row E.3 gri'dfine 2 ---halts too short -
Row G gridline 2 — short bolts
Raw I gridline 2 -- knife plate not welded
RFI for welded connection (row I at gridline 3) wedded one side
Row G gridline 5 — faying surfaces not in contact and short bolts (need RFS)
Row G gridline 7 — faying surfaces not in contact
Row G gridline Q — frying surfaces not i.x1 canta.at and short bolts
Row I gridline 9 — tube steel to beam connection - poor weld (marked with paint)
1230 North Skyline Coir , Idaho Falls, 183402 208--8242 Fax: 208-529-6911
Email: elm ti ti-id.com Website. www. ti -id. o .
MATERIALS
TESTING it
INSPECTION
PREF
RjEvism DA r= 1/4/2007
EA TERN
HEALTH ED U C & Bus
L) EVRPTO 7-SWE. DOC
IJ Environmerital Services Ll Geotechnical Englneerincl D Constniction Materials Testing Ll Special
xaw H griciline 9 - tube steel to beam connection - poor weld (marked with paint)
Row G gridline 10 — fayinv surfaces not in contact and short bolts
Complete skylight 1 need details an welded connections.
***RE -INSPECTION RE
If there are questions concerning this report, (rp t0 2 7,sqve. doe) , pl ease contact the Project Manager Il stEd abave.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: George DuPont
Corporate Construction Services Manager
CC: Kurt Karst, -Alderson Karst Nitro Architects, Ted Hendricks.East Central Idaho Planniner .
Mark Andras, G & S Structural Engineers; Arden r it Ormond BulidersVal et
t1�
1230 North Skyline Drive, Suite C, Idaho Falls, ID 834,02 208-529-8242 _ � 9_
Fac. � ,� 1 1
Email. tl ti- d. o Website: www. t d,cc m
F
R �
w
MATERIALS
TESTING it
INSPECTION
PREF
RjEvism DA r= 1/4/2007
EA TERN
HEALTH ED U C & Bus
L) EVRPTO 7-SWE. DOC
IJ Environmerital Services Ll Geotechnical Englneerincl D Constniction Materials Testing Ll Special
xaw H griciline 9 - tube steel to beam connection - poor weld (marked with paint)
Row G gridline 10 — fayinv surfaces not in contact and short bolts
Complete skylight 1 need details an welded connections.
***RE -INSPECTION RE
If there are questions concerning this report, (rp t0 2 7,sqve. doe) , pl ease contact the Project Manager Il stEd abave.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: George DuPont
Corporate Construction Services Manager
CC: Kurt Karst, -Alderson Karst Nitro Architects, Ted Hendricks.East Central Idaho Planniner .
Mark Andras, G & S Structural Engineers; Arden r it Ormond BulidersVal et
t1�
1230 North Skyline Drive, Suite C, Idaho Falls, ID 834,02 208-529-8242 _ � 9_
Fac. � ,� 1 1
Email. tl ti- d. o Website: www. t d,cc m
MATERIALS
TESTING Fr
INSPECTION
PAGE #1 OF I
EWSJON DATE 11/10/200
RASA TSR
HEALTH EALTH EDU BUS
DEIARPT025SWEDOC
Environmental Services ❑ Geotechnical Engineering 0 Construction Materioals Test"
ing Q Special Inspections
Val Christiansen Phone:
City of Rexburg Fax:
PC.) Box 280 Other:
Rexburg, ID 53444
Project,,, Health Education & Business
Development Center Phase II, Rexburg
Project Manager: Dan Ding .40
Inspector,- Jos"" Cla.-ru
Inspection Date*, November 1, 2006
STRUCTURAL STEEL WELDING INSPECTION REPORT
On the above date, .our representative performed work on the referenced projectas reported below,
Arrived an site and visually 'inspected the completed welding performed by qualified welders using a SMAW
process with E70 1$ electrodes. Inspection consisted of complete joint penetration (CJP) and single pass fillet
welds. Also , Inspected are spai welds. Type of corax�ections and locations: deck on walk -out area at north side
of building, column to beam connections (full penetration, weds), lube steel cross btaces. bolt clips that have
been welded. (Ref: Need RFS for ,misfits an Radius Connections on root, and double angle iron braces and
splices in channel 1ran_)
Note.-, First floor tube bracing at D,8 - welds too small. second floor X -braces at G.9 - missing two welds at
G.3, excessive undercut at welds in center. Full penetration welds at column to heal- connections have
no continuous inspections performed.
*"*RE-INSPECTION/RETESTING RE
UIRED
Work'p was � •
pecm
wis exCeDt P.S 1J0tA(1-*
�? X
If there are questions concerning this report (rptO25swe)., please contact the Project Manager listed above.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Rcviewed by: George DuPont
Corporate Construction Services Manager
CC: Kurt Karst, Alderson Karst Mitro ArcMtects, PA.; Ted Hendricks, East Central Idaho Planning &Development Association;
Mark Andrus, G & S Structural Engineers; ,Arden Smith, Ormond Builders, Inc.; Val Christiansen City of Rexburg
1230 North Skyline Drive, Suite C, Idaho Falls, ID 83402 208-529-8242 Fax.& 208-529-6911
Email: ; imt1 b.MtH . or Web itwww. fi--id
MATERIALS
TESTING Fr
INSPECTION
LJ Environmental Services
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
d Geotechnical Engineering
❑ Construction Materials Testinq
Phone:
Fax,F
Other:
PAGE #1 OF 1
EVfS ION DATE 11 /10120 0 6
RAEASTERN
iDAHc0EPRM010C -
HLTH EDUC & BUS
DEV4T026SBLOC
LJ Special Insnentims,
Project: Health Education & Business
Development Center phase 11, Rexburg
Project' Manager-@.- Dan King
inspector:
0
J'sli Clark
Inspection. Date:, November Z, 2Q06
RIGH STRENGTH BOLTING INSPECTION REPORT
On the above date, sur representative performed word on the referenced project as reported below.
Inspected installation of snug dight only full tension/slip critical, twist -off bolts ("Leiu.ne" --bolts) -ASTM A325
bolts. Visually inspected twist-aff bots, at several various locations inspecior found Lejune bolts not twisted
off, bolts that were too short, loose bolts and missing bolts.
***RE-INSPECTION/RETESTIlVG REQUIRED
If there are questions concerning this report (rpt026sb)., please contact the Project Manager listed above.
Respectfully submitted,
MATERI[ALS TESTING & INSPECTION INC.
Reviewed by*. George DuPont
Corporate Const"ruction Services Manager
GC; Kurt Karst, Alderson Kart 1Vlitra Architects, PA; Ted Hendricks, East Central Idaho Fanning & Development Association;
Mark Andrus, G & S Structural Engineers; Aiden Smith,, Ormond Builders., Inc.; Val Christiansen City of Rexburg
e
1230 forth Skyline Drive, Suite C7 Idaho FlI ID 83402
08-529-8242 Fax. 208-529-6911
Email: i ti : ti -td. om Website, www.mti-id.com
y
MATERIALS
TESTING Fr
INSPECTION
LJ Environmental Services
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
d Geotechnical Engineering
❑ Construction Materials Testinq
Phone:
Fax,F
Other:
PAGE #1 OF 1
EVfS ION DATE 11 /10120 0 6
RAEASTERN
iDAHc0EPRM010C -
HLTH EDUC & BUS
DEV4T026SBLOC
LJ Special Insnentims,
Project: Health Education & Business
Development Center phase 11, Rexburg
Project' Manager-@.- Dan King
inspector:
0
J'sli Clark
Inspection. Date:, November Z, 2Q06
RIGH STRENGTH BOLTING INSPECTION REPORT
On the above date, sur representative performed word on the referenced project as reported below.
Inspected installation of snug dight only full tension/slip critical, twist -off bolts ("Leiu.ne" --bolts) -ASTM A325
bolts. Visually inspected twist-aff bots, at several various locations inspecior found Lejune bolts not twisted
off, bolts that were too short, loose bolts and missing bolts.
***RE-INSPECTION/RETESTIlVG REQUIRED
If there are questions concerning this report (rpt026sb)., please contact the Project Manager listed above.
Respectfully submitted,
MATERI[ALS TESTING & INSPECTION INC.
Reviewed by*. George DuPont
Corporate Const"ruction Services Manager
GC; Kurt Karst, Alderson Kart 1Vlitra Architects, PA; Ted Hendricks, East Central Idaho Fanning & Development Association;
Mark Andrus, G & S Structural Engineers; Aiden Smith,, Ormond Builders., Inc.; Val Christiansen City of Rexburg
e
1230 forth Skyline Drive, Suite C7 Idaho FlI ID 83402
08-529-8242 Fax. 208-529-6911
Email: i ti : ti -td. om Website, www.mti-id.com
MIATERIALS
t tiYfi.
TESTING
INSPECTION
�) Enoir ownental Services
Val Christiansen
City of Rexburg
PO Box 280
Rexburg., ID 83440
100�'
:) Geotechnical Engineering
PAGE #1 OF 2
REVISION DATE 911812006
R-�EASTERN
iDAHM2006REPORME60103C -
HEALTH EDU C & BUS DEVAPTO 14, o0c
Construct'on Materials Testina
N -r
Phone:
0
Fax.
Other:
Prv,�ect: Health Edueation. &Business
Project Manager:
0
Inspector,
Inspection Date:
Development Center Phase 11, Rexburg
Dan King
Troy Posi"v
September 5, 2006
DAILY INSPECTION REPORT
C3n the above date., our representative perfonned work on the referenced project as reported below.
YnspectInspector arrived on site to walls grouted on September 1, 2006. Shear wall from gridline 2 to 4 on
row G was grouted. from W to 8' - 4`8`7 was placed above 8', inspector used a flashlight to observe vertical steel
reinforcement, Detail S.3 shows that at end of wall and doorjambs, two cells shall have reinforcement; only one
was noted. Cleanouts provided showed grout extruded to faee sh 11,
'ILIZ5
West side sta'r-well from gridline I to 1.5 between rows D.4 and E.4 was grouted from 0-) to 44'- 4, of wall was
placed above 41; inspector used a flashlight too observe vertical steel reinforcement. One cell was mis'sing
reinforcement on south side of both doorways as per Detail S.3- North wall has two rel'nfor steel shifted
eing
one cell over, leaping 40" on center on east side. Inspector reco=ended -placin ore vertir,21'n i*to% nrn PrE*2 1
0
position and continue running other verticals to top of wall also.
East side stairwell from, gridline 10.5 to 11 between rows D.4
reinforcement was noted at proper spacing except at doorways.
doorway..
and E.4 was grouted from (}' to 4'. Vertical
As per Detail S.3, one vertical is missing per
Elevator shaft from gridlzne 5.5 to 6.5 between rows F.4 and F.8 was grouted fr.,,,. 0 o 4 8 of wall was
placed above 4'; inspector used a flashlight to observe vertical 1h steel reinforcement. One vertical was missing at
end of wall on gridline 6.5 at row F.8 and another on the east side of elevator openi'ng as peg- Detai15.3.
1230 North Skyline Drive, Suite C, Idaho Falls, ID 83402 208-529-8242 Fax., 208-529-6911
EM04 eimfi r t 4i r Website: wvvw-mt1-id.rom
MATERIALS
_� TESTING Fi
INSPECTION
3 Environmental Services
3 Geotechnical Engineering
3 Construction Materials Testing
PAGE #2 OF 2
REVISION DATE 911812006
RAEA-STERN
10AHc\2006REP0RT-S\E60103r,
HEALTH EDUC & BUS DEV\RPT014,D0C
:) `;nP.rJqJ Inqnp-rtinnc:
r of vertical Inspector cannot verify positioning cal reinforcing steel below grout �Zne, only that it appears above an(I
is
Y
is placed in grflut.
It is recommended that the engineer of record review this situation.
Ifthere are questions concerning this report (rpt014}, please contact the ProjectManager listed a-
ove,
Respectfully submitted,
MATERIALS TESTING &INSPECTION INC.
. ...........
Reviewed by: Jxxn D. Fattens, P.E.
Project Manager
CC: Kurt Karst, Alderson Karst Mitro Architects, PA; Ted Hendricks, East Central Idaho Planning & I7evelopment Association;
Mark Andrus, G & S Structural Engineers@. Arden Smith Ormond Builders, Inc.; Val Christiansen City of Rexburg
1230 North Skyline Drive, Suite C, Idaho F211s, 0 83402 208-529-8242 Faxg 208-529-6911
Email: eImtiCU-),mfi-1d.com Website, wvvw.mti-id.com
r } r
MATERIALS
5 i''•Y k
TESTING
INSPECTION
Environmental Services
Geotechnical Engineering
Construction Materials Testing
Val Christiansen Phone:
Citi of Rexburg Fax,,-
PO
.ax;PO fox. 2g0 Other. -
Rexburg, ID 83440
PAGE #1 OFI
RE4} ViSMND1'ATE 91 81200
a E ATE ���qhl14■
HEALTH EDUC & Bus
DEV\R PT- I I R0, i)o
Project: Health Education & Business
Project Manager
Inspector:
Inspection ]ate:
Development Center
Dan King
Troy Posio
August 4, 2006
REINFORCED CONCRETE INSPECTIONREPORT
Phase I1, Rexburg
On the above date, our representative performed work on the referenced project as reported below.
Inspected reinforcing steel placement from gridline 1 to 5.9 between roves F and H.
Monitored two loads arriving at the job site for correct mix and proper slump. perfoirmed one air entrainment
test and cine slump test. uD5ei"VeCt DlaCement and ��t,�;,-, �,f
���a�,�1 10 .,,,�,;n
#-I 10 placed between gridlines
Cylinders: #6].862-#61.865
A ------- �__� _a'aiy✓vwiVWY1VIR .,� � �,� ��„A� yards of falters concrete unix
I and S,9 from row B to H, and cast one set of four cylinders.
Work inspected was in compliancewith project plans and specifica.tions.
If there are questions canceming this report (rptG'11rc), please contact the Project Manager listed above.
Respectfully submitted,
bZATERIALS TESTING & INSPECTION INC.
,a Rt
Reviewed by*,, George DuPont
Corporate Construction Services Manager
CC: Kurt Karst, Alderson Karst M'tro Architects, PA; Ted Hendricks, East Central Idaho 1 ., i &
ent Association4
Mark Andrus, G & S Structural Engineers; Arden Smith,, Ormond Builders, Inc.; Val Christiansen City of Rexburg
1230 North Sky[ine Drive, , u i e C, Idaho FII , ID 83402 208-529-8242
Email: jmfi CJ ■fi-id.co ■ Website: www.mti-id.com
Fax: 208-529-6911
MATERIALS
TESTING fr
INSPECTION
o Environmental Services
Val Christiansen
City of Rexburg
P4 Box 2$0
Rexburg., ID 834-40
ASTM C-39 Concrete Cylinder
Compressive Strength
o Geotechnical Engineering
o Construction Materials Te5tina
Photie.
Fax:
Other:
PAGE #1 OF1
REVISION DATE $12212006
RAEASTERN
HF_kum Eouc a BU 5 QaVV A520.'SOC
Project: Health Education & Business
Development Center Phase YY, Rexburg
Project Manager: Dan King
Contractor: Ormond Inspector: x�-
�
y .fir
Supplier, Walters Ready Mix Tiuck #: W-57 Ticket #: 00613
Mix I: 110
TTOf Yards-, I I V2 of 22 Report 002re
Location: Footings ri le. .., row through counter- clocicwise t(cyridline
3.8 row
ZD
MIX PROPORTIONS PROVIDED BY
SUPPLIER. TEST PROPERTIES & CONDITIONS:
Batch Size:��----- Weather Condition: Partly io"udy
F �mlCement (lbs): litent Temperature. F . 7
Fly Ash lb - Not Concrete Temp. (ASTM C 10 (F): 77
Water (gal): Provided Time Concrete Batched (fi-oto Ticket): :
Coarse egg. #1 (lbs), By Time Representative Concrete Placed:
Coarse (I - The ,fir Content ASTM C 231 or C4(%): 5.0
Fhie- Agg . #1 0bs : Recti Slump (ASTM C 1.43) (inches), 4
Fiiie Agg. #2 .(Ibs): Mix Unit Weight (ASTM C 138) -
Admix #I (oz). - CompanLY Yield (ASTM 138): ------_--Admix 42 (Oz): ---------- Water Added (gals): 10_
Admix #3 (oz): ---------- Set # (if any)
end Ratri ---------
Sampled in accordance with ASTM C 172
Cvlinde.is cast in accordance with ASTM C31 — Field 1 - Lab
Ik Y 1-. ti
INOTM uYlincler gain tier based on avemcFefor indicated test at ASTM C-617 is a sulfur cap — ASTM C 1231 neoprene ads used unl '
Note-. Walters Reidy Mix did not provide inspector with batch rnzx ticket.
If you have questions concerning this report (c61520), please coiltact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC,
-9
5W , 0,-. "
Reviewed by: George DuPont
Corporate Construction Services Manager
': Kurt Karstl, KarstMitro ArchitectsP; Ted Hendr'eks, East Central Idaho Plaming & Development Association; Mark Andrus G &
Structuralniri r i r n nth, rm nd Builders,Inc.; 1r1 a n F
sen CI' ty of Rexburg
1 230 North SkylineDrive, Suite C, Idaho Falls,l D
824 Fax., 208-529-6911
Ema is rrtino rntki . o Website: wvv. ti -id. orn
MATERIALS
TF -STING �r
INSPECTION
o Environmental Services
Val Christiansen
pity of Rexburg
PO Bax 284
Rexburg, ID $344a
ASTM C-39 Concrete Cylinder
Compressive Strength
o Geotechnical Engineering
o Construcfion Materiailsi
Phone:
th r
PAG E 1 OF I
REVISION CRATE 812212006
HEALTH EDUC & BUS DEVkC61 485.[)
o W InQtnsar%flnncl
Project.,: Health Education & Business
Development Center Phase I1, Rexburg
Project Manner:, man King
Contractor: Ormond Inspector: Troy Posio
u 11 r: Walters Ready Mix T :
Mix ID: I 10 Ticket 1.
Location: Footln<ys from gridline 7 to I I at row C # Of Yards.- 22 of 55 Report #.- 0 0 1 rc
MIX PROPORTIONS PROVID L SUPPLIER: TEST PROPERTIES
CONDITIONS:
Batch Size: i 1 ya s Weather -Overcast
Cement (lbs): 5720 Ambient Temperature (F
Fly Ash (lbs): ------- Concrete Ternp, (ASTM 1 (F): 77
Water (gal): 185 Time Concrete Batched from Ticket): m
Coarse fig• Time Representative Concr to Sampled: 3:38pm
Coarse Age. (I - �_��.�-_,
Air Content (ASTM 1 r �-17 � . .7
Fine Aga. 1 1 14
Slump (ASTM C 143) lncli :
Fin (Ibs):
Tett Weight (ASTM C 138); ----------
dmi 1 B AE- — 40 YieldASS
M C 138)- -----------
dmi : P -322 — 17 t r d(gals),.
Admix
Water/Cement Ratio: 0-37 Set # (if any) ----------
m led in accor&nce with ASTM C 172
Cylinders cast in accordance with ASTM C31— Field / 1 - Lab
Cast Date: Jul 5, 06 Specified Pc (psi)-. 3000
fCylinders: 4
Cyt i r��i r Cylinder Test Corr.Failure
Diam. Height Factor Area Age Date L dr r F� I»
5 6 �1 1.00 28.27 x.Jul 1 , 897150 3150
lir
nce
1 486 1 1 . 28.27 Aga � , 1 �1 1
#F�
61487 6 12 1.00 28,27 .28 Aug r 06 1195575 4230 cone PASS
61488 6 12 1.00 28.27 28 Aug 122,920 4350 cone PASS
Notes.- Cylinder diameter based oii average for indicated test date; ASTM C-617 is a sulfur cap — ASTIR C 1231 neoprene
If you have questions concerning this report (c61485), please contact us immediately.
Respectfully submitted,
MATERIALS TESTING +& 1NSPECTIpN" INC.
r 0
w��IIMQ
Reviewed by: George DuPont
Corporate Construction Services Manager
Kurt Kart, Alderson Karst Mitro Architects, PA, Td Hendricks, t Central Idaho
Structural iigin m; Arden Smith, Ormond 1u11 r , Inc., Val Christianscn 'it fburgs
1230 North Skyline Drive, Suite C, Idaho Polka ID83402o208-529-8242sFax; 208-529-6911
Er al: mt[fi-id.com Website: www.mti�id,com
qr
go
MATERIALS
TESTING Er
INSPECTION
o Environmental S ry
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
Contractor: Ormond
ASTM Ch -39 Concrete Cylinder
Compressive Strength
o Geotechnical Engi r+
o Construction 'tater l t o
PAGE #1 OF I
REVISION [SATE 8/2212006
R AEA TERN
IDAHO\ 006REP RTST6010 -
HEALTH E[DLJC & ESUS DEVNC61532,DOC
op.i In_qnP_r-_flnnQ
TU_ ----1«
Pbn*
Fax:
Other:
Project: Health Education & Business
Develo,, tenter Phase 11, Rexburg
Project MManager:Dan King
Intr. Cole, Beebe
pplir r: Walters Reade Mix Truck f
Mix ID,* #110 — 3000PS1 # Of Yards-.
Location: 40',,west of northeast comer, east walk south wall
84
4
Tito: 00656
Report� 003rc
MIX PROPORTIONS PROVIDED BY SUPPLIER: TEST PROPERTILS & CONDITIONS:
Batch Size.
weather n itio :Clear/windy
r�iY�t(lbs)-
Fly Ash IbtAmbient
90
.Temperature(F):
Water 1t 'r��i ConcreteTemTM C 1064) F): 80
Coarse Agg. #1 (Ibs): By Time nrete Batched from Ticket): 1 :4
pm
Coarse Agg. 42 (lbs): The Time Representative Concrete Placed: L-00pi-n
Fine A<rg. #i (Ibs)-. Redi Air C o ntent (A STM C 2 3 1 or G 17 3) %. 4.4
0 Slump (ASTM C
Pies(lbs):I i n 4 inche .I (oz):
4Weight (ASTM C 138),- _-------
Admix #2 (oz)-, Company i e1 (ASTM C 138)aAdmix #3 (oz): Water Added -----____
(gals).'-
Water/Cenient Ratio-. set # (if any)
lli led in accordance with T1 172
Iii l r cast in accordance ith ASTM C31 — Field 1 - Lab
%.41 L4 L Y ,V JETV a I ID c 41111.1''x'1 Jneoprene used nhr1 S e n.
If you have questions concerning this report (e61532)., please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTIQN INC.
Reviewed by: George DuPont
Corporate Consu-uction Services Manager
KuTt Karst, Aiderson art I"xtro Architects, PA. Ted Hendricks.,Et Central Idabo Planning lopincntAssociation,- Mark, And-rus,
Structural Engineers; Arden Stnith, Orryiwld Buiidem, Inc. , Val Christialisen City
1230 North Skyline Drive, Suite C., Idaho Falls,ID,83402*208-529-8242a Fax- 208-529-6911
Email: ti rnfi-id. m Website: www.mti-id.com
MATERIALS
TESTING Fr
INSPECTION
ASTM C-39 Concrete Cylinder
compressive strength
PAGE #1 OF 1
RrzVISION DATE 812212006
R:TASTERN
I DAH 0%20 0 6 RE P 0 RaS� E6 D 410 3C -
H E LTH
HEALTH EDUC & f3:S DEV\C61544.()oc
o Environmental Services o Geotechnical Eng'lneer-ing o Construction Materials 'esting o Special Inspections
Val U tin Phone,
City of Rexburg Fax:
PO Box 280 nth r. -
ID 83440
Project: Health Education & Business.
uu
Development Center Phase 11, Rexburg
Dan Kin
Contractor: Onnond Inspector: Josh Clark
Supplier: W alters Ready Mix Truck # : 62 Ticket #-, 00763
Mix ID: I 10 # Of Yards-, 4 of 9 of 36 Report#: 004re
Location.- On row H at gri'dlfiie 9.5
FMIX PROPORTIONS PROVIDLD BY SUPPLIERIP TEST PROPERTIES & CONDITIONS:
Batch Size: 9yds Weather nditions: Partly oloudy
cemelit (lbs): 4660 Ambient Temperature (F): 89.
Fly Ash (lbs): ---------- Concrete Temp. (ASTM C 1064) (F)- 82
Water (gal): 170
3 ' "' Tilne Cont ret c Batched from Ticket), 3:12pm,
Coarse Agg. #1 /4 -28070 Time Representative Concrete Placed: 4:1 Opin
it Content (ASTM C 231 or C- 173) (%)- 5.6
Fine Aerg. #I (lbs): Sand— 11700
Slump (ASTM C 143) (Inches). 6
Fine Agg. #2 (Ibs)- --------- UruI WeATightM13----------
Admix #1 (oz )+ MBAE-90 - 2-1 Yield (ASTM C 138)- ----------
Admix 42 (oz): Po,z-322 - 140 Water Added (gals): ----------
Admix #3 (oz): set #(1*f any)
Water/Ceinent Ratio:
Sampled in accordance with ASTM C 172
Cylinders cast iii accordance with ASTM C31 — Field / C 192 - Lab
Cast Date; J u 1 10; 06 Specified f c (psi): 3000
#of Cyfiride rs: 4
Cylinder Corr. Cyl 1 nde r Test Test Failure Compress'lve C-617 Fracture
ID Diam. Height Factor Area Age. Date Load Strength Cap Type Compliance
11544 6 12 1.00 28.27 7 JuJ 17,06 98,020
3470 cone/split
61545 6 12 1.00 28.27 28 Aug 71 06 139,800 4940 shear PASS
61546 6 12 1.00 28.27 28 Aug 7, 06 137,590 4870 oone/split PASS
61547 6 12 1 .00 28.27 28 Aug 7. 06 4
138,100 4880 shear PASS
Notes: Cylinder diameter based on average for indicated test date; ASTM C--617 I's a sulftircap — ASTM C 1231 neoprene pads used unless othenv i -'s-7 noted.
Note: Maximum slump specified at 5"", tested 67. contractor was notified.
0 a
If you havequestions concenung this i-eport (c61544), please contact us i1nmediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
wgme
Reviewed by: George DuPont
Corporate Construction Ser-vrces iWanager
CC: Kurt Karst, Alderson Karst Mitro Architeets, PA; Ted Hendricks, East Central Idaho Planning & Development Association.; Mark Andrus
S StructuralEngineers- Arden Sm-th, OrTnond Builders', Inc.; Val Christiansen City of Rexbur�g G &
Zi I I
I � 9 1
1230 North Skyfine Drive. Suite C, Idaho Falls, ID 83402@208-529-8242oFax- 208-529 6 1
Ema' 11: J
MtKDOti-id.com Website: wvvw.mti-id.com
4w
At .PAGE #1 OF 1
MATERIALS ASTM C-39 Concrete Cliner REVISiON DATE 8122,12006
R`IEASTERN
y
TESTING & Comp esve tegh IDA!do12006RFPORTSAF60103c,HEALTH EDUC & BL)s DEV\C61544.r)oc
INSPECTION
o Environmental services o Geotechnical Engineering o Construction Materials Testing o Speciai Inspections
Val Christiansen Phone-,
City of Rexburg Fax-,
FQ Box 280 Other:
Rexburg, ID 83440 P
Project: Health Education &Business
Development Center Phase 11, Rexburg
Project Manager: Dan King
Contractor: Armond coInspector: Josh Clark
Supplier: Walters Ready Mix Track #: 62 Ticket --,hrl: 00763
Mix ID: 110 # Of Yards: 4 of 9 of 36 Report #,., 004rc
Location.- On row H at gridIffie 9.5
MIX PROPORTIONS PROVIDED BY SUPPLIER: TEST PROPERTIES & CONDITIONS.,
Batch Size: 9yds Weather Condi-tions: Partly cloudy
Cement (lbs): 4660 Ambient Temperature (F): 89
Fly Ash (lbs): Concrete Temp. (ASTM C 1064) (F). 82
Nater (gal): 170 Time Concrete Batebed (fretn Ticket): 3:12pm
Coarse Agg. #1 (lbs): '/4" - 28070 Time Representative Concrete Placed- 4.- 1 Opm
Coarse Agg. #2 (tbs). Air Content (ASTM C 231 or C-173) (%).- 5.6
Fine Agg. #1 (lbs}: Sand- 11700 Slump (ASTM C 143)' (inches): 6
Fine Agg. #2 (lbs): Unit Weight (ASTM C 138) -
Admix #1 (oz).- MBAE-90 - 23
Adillix #2 (oz)-, Paz -322- 140 Water Added (gals): ----------
Yield (ASTM C 138): --------
Admix #3 (oz): ----------
Wate-r/C.ement Ratio: Set # (if any) ----------
Sampled in accordance with, ASTM C 172
Cylinders cast in accordance with ASTM C31 -Field r' C 192 - Lab
Cast Date: Jul 10, 06 Specified Pc (psi)-. 3000
# of Cylinders: 4
Cylinder Corr. cylinder Test Test Failure Compressive C-617 Fracture
ID Diam. Height Factor' Area Age Date Load
EEEEEREA�Strength Cap Type
Compliance
61544 6 12 1.00 28.27 7 Jul 17, 06 98,020 3470 cone/split
61545 6 12 1.00 28.27 28 Aug 7, 06 139,800 4940 shear PASS
I I I 1 1
61546 6 12 1.00 28.27 28 Aug I 7, 06 137,590 4870 cone/split PASS I
61547 6 12 1.00 28.27 28 Aug 7, 06 138,1{} 4880 shear PASS
Notes - Cylinder diameter based on average for indicated test date,; ASTM C-617 is a sulftir cap - ASTM C 1X31 neoprene pads used unless otherwise noted.
Note.- Maximum slump specified at 5", tested 6". contractor was notified.
If you have questions concerning this report (c61544), please contact us zmnlediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed bya, George DuPont
Corporate Construction Services Manager
CC: Kurt Karstl, Alderson Karst MI-tro Ardiftects) PA- Ted Hendricks. East Central Idaho Planning & Develowient Association.- Mark Aiidrus,, G
S. Structural 'Engineers; Arden Smith, Onnond Builder's Inc.- Val Chn'stian,s ' 3
7 1 en Oty of Rexburg
1230 North Skyline Drfve, Suite C, Idaho Falls,,,ID 83402*208-529-82429 Fax: 208-529.6911
Email: rnti�mtl-id corn- Website: www. mti-id.corn
MATERIALS
TESTING
INSPECTION
a Environmental Services
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
4
ASTM C-39 Concrete Cy- linder
Compressive Strength
o Geotec;hnlcal Engineering
o Construction s Te a ti m e
Pli ori :
_F':
Other:
'AGE #1 OF I
REVISION DATE 812212006
AEA TI�Rr'
10AH0\ 00 F EPORT T 010 c -
HEA�TH EDUC & BuS DEVIkC61562LOC
o Soerial.ti
W
Project: Health Education & business
I- - - - ,. . - -,,.,
Development Center Phase 11, Rexburg
Pro*
is Dan King
Contractor: Ormond Inspector: Art Weller
Supplier: Walters Ready Mix
Truck #1 85 Tit 00812
Mix 1D.- 110
#Of Yards, Report #'r
005rr,
Location. 2nd pier footing north of southeast pier footing
MIX PROPORTIONS PROVIDED BY SUPPLIER,-, TEST PROPERTIES CONDI TI
-ONS-0
Batch 1e0 l I yards_
Weather Conditions: le r/c h -n
Cement I s + nblent T mmature F
Fly Ash Obs)-, 70t Co nc rete Temp. (ASTM 1 0 64, ) ((F)'
Water a1
Provided Time Concrete Batched ( from Ticket)- 11.11 aj.11
Coarse . # 11bs: ByCoarse Agg. #2 Time RepresentativeConcretePl�acd;
1, , pm
Fine Agg. #1 (lbs)-- Redi (Ibs): TheYr Content(ASTM C 231 or -1 ) (%)-p 4.6
Fine Agg, #2 (lbs): .Slump . 2V2
Unit Weight (ASTM C 13
Admix 1oCompanyYield(ASTM1 fff r ^
.----------
Adrru'x #2 (oz), Wate,r Added (gals I ): 6
Adn
is # (oz): Set(if n
y)
NVater,/Cement Ratio:
Sample in a of -dance with ASTM C 172
--—C v -1I ndens cast in accordance wite ASTM C3 i — Held 1 - Lab
Notes:
uncler chame.ter based on avenage for indicated test date; ASTM C-61 7 is a sulfur cap — ASTM C 123 Iren ad 7s unless otherwiserpt.
If you have questions concerning this report (c61562), please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & TNSPECTIQN INC.
Reviewed by: George DuPont
Corporate Construction SeiTices Manager
: Kurt Karst, Alderson Karst Mitre rchit t , ; Ted Hendncks. East Central Idaho Inin& Development Assoclatiorr Mark Andrus
Structural Engineers, Arden Smith, Ormond Builders, Inc.i Val Chri"Stiansen City of �.T
1230 North Skyline Cori, Suite C, Idaho Falls,ICS834-02s208-529-8242*F2x: 208-529-6911
E ail roti roti -id_ cry Website: www-mti-[d.com
MATERIALS
TESTING Er
INSPECTION
o Environmental Services
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
ASTM C-39 Concrete Cylinder
Compressive Strength
o Geotechnical Engineering.
Contractor: Ormond
Supplier: Walters Ready Mix
Mix f: 10
L ti - n: Center of pier -at row D on
o Construction Materials Testing
Pert:
Fax:
Other,
PAGE #1 OF I
REVISION DATE 8/22t2006
RAEASTERN
I DAHO\2 006 REP 0RT '� E6 D 10 3c -
Project-,*, Health Education & Business
Development Center Phase 11,
Project . Manage, lean King
lt1: Josh Clark
Troch #: 34 Ticket : 00902
Of Yards:: 5 of 7Y4 of 22 Report : 007rc
ridl in - footing
MIX PROPORTIONS NS PROVIDED SUPPLIER.TEST
PROPERTIES& CONDITIONS:
Batch 14 yards eath r. i
ondlt�r.
_ Sunny
Cement (lbs): 3980 Ambient Temperature (F): 80
Fly Ash (Ibs): Concrete Temp. (ASTM C 1064) (F
Water of : 131 Time Concrete Batched (from Ticket)- 10:53am
Coarse 1 i — Time Representative �� F�l�d:
Coarse Agg. 42 (lbs) ---------- Air Content (ASTM C 231 or G 173)
Finer #1 :
5.3
Slump (ASTM C 14 rn be : 4!/:2
Fine Agg. #2 (lbs): ------- Unit Weight (ASTM C 138) -
Admix ;-------
..dini oz: Po-. — 1,21 Water Added (gals):
Admix #3 (oz): ---------- Set i
f any)
Water/Cement
Sampled in accordance with ASTM C 17
Cylinders cast in aceordance with ASTM C3'1 — Field / C 1 - Lab
FCast Date; Jul 12, 06 Specified f c (psi).- 3000
Of Cylinders:
Cyl i rider Corr. Cylinder Teat Test. Faflure Compressive C-617 Fracture
ID Diam. Height F ct r Ares Age
Date
Load Strength Cap Type Compliance
1582 6 12 1.00 28.27 7 Jul 19, 06 1015605
1 583 5.99 12 1.00 28.18 28 Aug12.1,195 4300 cone PASS
61584 5.99 12 1.00 28.18 28 Aug 9, 06
L12
i'
1585 . 1 1.00 .�1 u 01 0 4810 cone PASS
Notes- Cylinder,diameter based on avenage for indicated t et dte - ASTM C-617 i1231
e -
���`ur — ASTM � � i r�������r� ds ud unless o#erie noted.
If you have questions concerning this report (c61582), please contact us immediately.
Respectffilly submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: George DuPont
Corporate Construction Services Manager
CC-- Kurt Karst, Alderson Karst . ; Ted Hendricks, t Central Idaho iannin iprr�n�t Association; fir. r�rus.
t Marl ngin � r Arden Smith 1-moredBuilders Inc.* � � � ��
xn City of Rexburg
1230 North S,kyline Drive, Sprite C, Idaho Foals, ID 83402w208-529-8242* Fax: 208-529-6911 1: mfi roti -id. o Website: wvv.mti-1d. 0M
MATERIALS
TESTING is
INSPECTION
o Environmental services
Val Christiansen
City of Rexburg
PO Box ASO
Rexburg, ID 83440
ASTM C-39 Concrete Cylinder
Compressive Strength
o Geotechnical Engineering
Contractor: Ormond
Supplier: Walters d Mix
Mix I: 19 0
Location: rth a t corner of bufldi
o Construction , ari d Test'sinn
PAGE #1 OF 1
REVISION DATE 8122/2006
R..� EASTfE IN S4 0
HEALTH EDU BUS DEv1 7 . DO
0 SDeCial I n n
Phone:
Fax:
tai r:
Project: Health Education & Business
Development Center Phase 11, Rexburg
Project Manager: Dan Kim!
Inspector: t hen Fre coming
Truck
Yards:
concrete piers exterior to foundation
Tit: 1258
Report : 009re
MIX PROPORTIONS PROVIDED BY SUPPLIE * TEST PROPERTIES TIES & CONDITIONS.
Batch Size: 9 yams Weather
Cement lbIitions-, Clear
Fly ME (lbs)-.- Not Ambient Titur(F)-. 92
Concrete Temp. (ASTM C 1064) (F): 84
Water 1; Provided Tim retBatched (from Ticket)-, : �� 4rn
Coarse .. #I (lbs): Tire Representative �.r�te Placed: 4; Yxr
Coarse TAl i` Content ASTM C 231 or -1 )%
Fine Agg. #1 (lbs)-� Redi Slump (ASTM C 1 (Inches): 3 V
Fire Agg, 1b): Mixt Weight (ASTM
C 13 8)-- ---------
Admix 41 : mpally i T 1 -..-:__-
Adi-nix #2 (oz):
----------
Water/Cement Ratio
Sampled in accot-dance with ASTM C 172
Cvfin ersapt ire a c .-dance with ASTM C31— Field 1 - Lab
Cast Date: Jul 19, 06 Specified Pc (psi). 3000
f Cylinders:
Cyfinftr Corr. Cyfinder Test
Test Failure Cornprive C-617 Fracture
ID Diam. Height qtr Area Age Date Load Strencith Cap 1 Type Compliance
61673 6 12 1.00 28.27 7 JuJ26,06 107,050 3790 shear
1 1[)
1 674 6 12 1.00 28.27 28
1 675 6 12 1.00 28.27 28
77-
61676 12 1.00,_
NN Wes: Cylinder diameter based oi-i average. fot, indicated tet date; ASTM C-617 'is a sulfa` cap i
ASTM -C 123 T neoprene pads used unless otherwise noted.
If you have questions concerning this report (c61673), please contact us immediately.
Respectfully submitted,
n•Z.ATE.IZIALS TESTING & 1NSpECTION INC.
Reviewed by: GDuPont
Corporate Construction Sei-vices Manager
'C; Kurt Kart, Alderson Kart Mitro Architects, P. Td Hendr'llt Central � ILni
Development t rAndrus,an�
Structural Engineers'; Arden Smith, Ormond B-uilder,, Inc.; Val ChTisdansen City of Rexb-urgr
1230 North Skyline Drive, Suite C, Idaho Fall ID 83402* 9 Fax: 208-529-6911
Email: m i2mti-id. o '"website; www,mti-id.com
1P
MATERIALS
TESTING �r
INSPECTION
PAGE #1 OF I
REVISION DATE 8/2212006
RAEASTERN
HEALTH EDUC & BUS
DE NRPT001 RGDOC
Q Environmental Services Cl Geotechnical Engineering ❑ Construction Materials Testing L)�;
S�dal Inspections
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
Phone;
Fax.,
Other:
Project: Health Education & Business
Project Manager:
Inspec#or.
Inspection Date;
Development tenter
Dan King
Troy Posio
July 5., 2006
REINFORCED CONCRETE INSPECTION REPORT
Phase 11, Rexburg
On the above date, our representative performed work on the referenced project as reported below.
Inspected reinforcing steel placement at footings from gridline 2.9 to I I at row C; ongridli�le I I from
and from gridline 2 to I I at -row H.
C to H;
Monitored five loads arriving at the jobsite for correct mix. Perfon-ned one air entrainment test and three slump
tests. observed placement and consolidation of 55 cubic yards of falters Ready Mix concrete mix # 11 0 n]arPd
at locations noted above, and cast one set of four cylinder.
Cylinders: #61485-#61488
Note.- Trucks #2 and 43 were visually noted at 4" to 4V2"' slump; truck. #4 was tested at 5" and true #5 tested
at 21/z" - 10 gallons of wader was added to bn'ng it up to a 4" slump.
Work inspected was in compliance with project pians and speci�cations, except as no ed.
If there are questions concerning this repaz-� �rpt0�lrc}, please contact the Project Manager fisted abase.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
r
Reviewed by,., George DuP'ont
Corporate Construction Services Manager
Wit. Kart, Alderson Kart Mitro Architects, + Ted 14endrIcks,
Mark Andrus,, G & S S trucrural E1 -r; Arden Smith,, Ormond Builders, Inc. - Val Christiansen C'ty of Rexburg
1230 North Skyline Drive, Suite C. Idaho Falls 1 D 83402 208-529-8242 Fax: 208-529-6911
E i : eirnfigmtkid.com W'te: www.mti-id.com
.§
I
MATERIALS
TESTING Fr
INSPECTION
PAGE #1 OF '1
REVISION DATE 812212006
R.EASTERN
HEALTH EDuc & BU
DEORPT002IAC.D
13 Environmental Services J Geotechnical Engineering J Construction Materials Testing LJ Special Inspections
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
Phone:
Fax;
Other:
Project:0
Health Education & Business
Development Center Phase 1I, Rexburg
Project Manager,: Dan ming
inspector: David Anderson
Inspection Dade: July 6'� 2006.
REINFORCED CONCRETE INSPECTION REPORT
On the above date,, our representative performed work on the referenced project as reported below..
Inspected reinforcing steel placement at footings on gridline 2/row H,, counter clockwise through to gridline 31
row C.
Monitored one load arriving at the inhcitP fc)r rnrrar%t mTv one _,__
test. Observed p
viii ail U11LId111111Gi11 LGSi� c1I1C1 (]Ili S1uI11p
lacement and consolidation of 22 cubic yards of Walters Ready Mix concrete mix 417 fl nlacerl
as noted above, .and past one set of Cylinders.
Cylinders: #61520-61523.
Note: Concrete supplier did not provide batch tickets for ready -mix concrete delivered.
Work inspected was in compliance with project plans and specifications, except as noted.
If there are questions concerning this report (rpt002rc), please contact the Project Manager listed above.
Respectfully submitted,
11ATERIALS TESTING & INSPECTION INC.
Reviewed by; George DuPont
Corporate Construction Sei-i)ices Manager
CC: Kurt Karst, Alderson Karst Mitro A - Ted Hendr'cks. East Central Idabo Planning & Development Association;
rchitects, PA
Mark Andes G & S Structural En1veers; Arden SmAh,Ormond Builders,Inc.;Christiansen
1230 North Skyline Dewe, Suite C. Idaho Fails, ID 83402 208-529-8242 Fax.- 208-529-6911
Email: eim i ti -I e Website: wvvw. ti -i . o
W
ir
M ATERIALS
TESTING &
INSPECTION
D Environmental Srv'
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
❑ Geotechnical Engineering
Q Construction Materials Testing
Phone:
Fax:
Other,
PAGE #1 OF 1
REVISION DATE 812212006
R -EASTERN
1DAHc 2006REP(),RT \E 010
HEALTH EDUC c Esus
�- :r- .r .--r-%�'vti4%-fa 14J
Project: Health Education & Business
Development Center Phase 1l, Rexburg
Project Manager: Dan King
Inspector: Josh Clark
Inspectaan Date; July 10, 2006
REINFORCED CONCRETE INSPECTION REPORT
On the above date, our representative performed work on the referenced project as rep�oirted below.
Inspected reinforexng steel placement at southeast building corner, southwest building corner, gridline E, 1.
Monitored one load. arriving at the Jobsite for correct mix. Performed one air entrainment test and one slump
test. Observed placement and consolidation of 3 6 cubic yards of Waiters Concrete mix #110 placed as noted
above, and cast one set of cylinders.
Cylinders; #61544-61547
Note.- Sump specification is 5" maximum; tested at 6"
visually the sumps of other trucks to be between 4"— 5"6
and contractor was notified. Inspector deten-nioned
Ward inspected was in compliancy with prject plans and spe�ificatians, except as npted.
If there are questions concerning this report (rpt004re), please contact the Project Manager listed above.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: George DuPont
Corporate Construction Services Manager
CC: Kurt Karst,, Alderson Karst Mitra Architects, FA; Ted Hendricks, East Central Idaho Planning &Development Association;
Mark Andrus, G & S Structural Engineers; Arden Smith,Ormond Builders, Inc.; Val Christiansen City of Rexburg
1230 North Skyline Drive, Suite C, Idaho Falb ID 83402 208-529-8242 Fax: 208-529-6.911
Email: imb rnfl-id.com Website: www, ti -i . r
MATERIALS
TESTING �r
INSPECTION
11 Environmental Services
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, 1D 83440
0 Geotechnical Engineering
0 Construction Materials Testing
Phone:
Fay:
ether:
PAGE #1 OF 1
RF:i ION DATE 8/2212006
AEASTER N
HEALTH EDUC & 13U
DEV\PT00RC.0
0 Sr)ecial 1nst)Pcfion
Project: Health Education & Business
Development, Center Phase II, Rexburg
Project Manager: Dan, King
Inspector: Art Weiser
Inspection Date -.s Judy 1T, 204E
REINFORCED CONCRETE INSPECTION REPORT
an the above date, our representative performed work on the referenced project as reported below.
Inspected reinforcing steel placement at ? pies footings east of center of building, and 4 pier footings at center
of building, north of elevator.
Perfon-ned one slump test. observed placement and consolidation of Walters concrete mix #110 placed at
locations noted above, and cast one setof four cylinders.
Cylinders: #61562r#61565
Work inspected was in compliance with project plans and specifications.
If there are questions concerning this report (rptoo5rc), please contact the Project Manager listed above.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by; George DuPont
Corporate Construction Sen4ces Manager
CC: Kurt Karst, Alderson Karst Mitro Architects, PA. TedHendricks, East Central Idaho Planning & Develo ment Association;
Mark Andrus, G & S Structural Enginecrs., Arden Smith, Ormond Builders, Inc.; Val Chris'fians.en City of Rexburg
1230 North Skyline Drive, Suite C, Idaho Falk, ID 83402 208-529-8242 Fax: 208-529-6911
Em
08- -
Em il: eimtiti-id.com Website.- www.r-nti-id.com
MATERIALS
TESTING &
INSPECTION
LJ Environmental Services
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
El Geotechnical Engineering
0 Construction Materials r
Phone:
Fax
Ogler:
PAGE #1 OF1
REVISION DATE 8!2212006
F ,\EA TERN
IDAHO\2006REPORTST60103C-
H EALfiFi EDUC & 13U
DE \RPT0O FA .00
Ll SDec'lal 1 p.t
Project: Health Education & Business
Development Center Phase I1, Rexburg
Project Manager: Dan King
Inspector*. Josh Clark
Inspection Date: July 11, 20Q6
REINFORCING STEEL FOR CONCRETE INSPECTION REPORT
On the above date, our representative performed worm on the referenced project as reported below.
Inspected reinforcing steel placement at 7 pier interior footing pads from west wall, and elevator pad at south
wa11.
Work inspected,was in compliance with project plans and s,peeifications.
If There are questions concerning this report (rptoo6rs please contact the Pro,�ect Manager listed above.
Respectfuny submitted,
MATERIALS TESTING Se INSPECTION INC.
Reviewed by: George DuPont
Corporate Construction ,Services
Manager
CC: Kurt Karst, Alderson Karst,Mitro Architects,
PA; Ted Hendricks, East Central Idaho Planning & Development Association -
Mark AjZdrus, G & S Structural Engineers; Ai -den Smith, Armand Builders, Inc.-- Val Christiansen City of Rexburg
1230 North Skyline Drive, Suite C-'_'_,__"_1 -a fro Falls, ID 83402-529-8242
Email: in ti iti-i e o Website: www. mta-i . c)
Fax: 208-529-6911
k
MATERIALS
TESTING Er
INSPECTION
U Environmentail Services
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
EJ Geotechnical Engineering
J Construction Materials Testinq
Phone:
Other:
PAGE #1 OF I
REVISION DATE 812 21200 6
I TASTERN
IDAH O\ 0 06REP i T 6 ID 10 -
HEALTH EDIT [3LJ
E) Sr)ecial Insoections
Project: Health Education & Business
Development Center Phase ZI, Rexburg
ProJect Manager: Dan ming
Inspector: Josh Clark
Inspection Date; Judy 12, 2006
REINFORCED CONCRETE INSPECTION REPORT
On the above date, our representative performed work on the referenced project as reported below.
Inspected reinforcing steel placement at pier footings from row I] to S at gridline D.7, and from row C to S at
gridline C.7, and elevator shaft stem walls.
Performed one air- entrainment test and one slump test. Observed placement and consolidation of 22
yards of Walters Concrete mix # 110 placed at locations nosed above, and cast one set of four cylinders.
Cylinders: #61582-#61585
Work inspected was ip.n compliance with project plans and specircations.
#1
If there are questions concerning this report (rptOO7rc), please contact the Project Manager fisted above.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: Georgi DuPont
Corporate Construction Services Manager
CC.- Kurt Karst, Alderson Karst Mitro Archi'tects. PA; Ted Hendrick(� t ��� �� �.� i
D1t Association;
.r� Andrus, Structuralx�rx x ; A- li mith Ormond Builder
Inc.; Val Christiansen City of Rexburg
1230 North Sklin Drive, S uite C, Idaho His, ID 8340.E 208-529-8242
Email: eimficcImtkid.com Website- wwwti--i .com
Fax: 208-529-6911
cubic
MATERIALS
TESTING &
INSPECTION
❑ Environmental Services
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
CJ Geotechnical Engineering
J C o n stru di n M a te ri cail s Testing
Phone:
Fax
Other:
PAGE ##1 OF 1
F-vI ION DATE 812212006
R.�EASTERJA
DAHO\2006 REPORT �E 010 X -
HEALTH EDU BU
DWRPT00 RC,D0
El Soeeial i ti
Project: Health Education & Business
Development Center Phase II, Rexburg
Project Manager: Dan King
Inspector: David Anderson
Inspection Date: July 12, 2006
REINFORCED CONCRETE INSPECTION REPORT
On the above date, our representative performed work on the referenced project as reported below..
Inspected reinforcing steel placement at all exterior pier footings, north of north walk, south of south wail.
Observed placement and consolidation of 3,3 cubic yards of Walters Concrete mix #110 placed at locations
noted above,
Note: Cylinders were cast andtested earlier in the day.
Work inspected was in compliance with project plats and specificatxons.
If there are questions concerning this report (rptO08rc please contact the Proj eco Manager lined above.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: George DuPont
Corporate Construction Services Manager
CC: Kurt K,arst, Alderson Karst Mitro Architects, PA; Ted Hendricks, East Central Idaho Plannl'ng & Develo ment Association,
Mark Andrus, G & S, Structural Engineers- Arden Smith, Onnond Builders Inc.
r� ttans e n City of Rexburg
1230 Forth Skyli,ne [give, Suite C, Idaho Falls, I 8340 -
-$242 Fax: 208-529-6911
Email: ViWebsite'. www.mti-id.corn
.
MATERIALS
TESTING Fr
INSPECTION
IJ Environmental SerAces
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
iig
LJ Geotechnical Engineering
EJ Construction Materials Testing
Phone:
Fax:
Other.
PAGE #1 OF '1
REVISION DATE 812212006
AEATEI
IDAHCQ00 REPO TS160 10
HEALTH EIDUC & BUS
DWRPT00 R .D0
LJ S Dema l I li
6
Project: Health Education & Business
Project Manager:
Inspector:
Inspection Date:
Development Center
fan Ding
Stephen Fremmm"g
July 1.9, 2U06
REINFORCED CONCRETE INSPECTION REPORT
W
Phase II, Rexburg
On the abase date, our representative perfonned work on the referenced project as reported below.
inspected reinforcing steel placement at concrete piers exterior to building foundation
Performed one air entrainment test and one slump test. Observed placement and consolidation of 9 cubic yards
of Walters concrete unix # 1.90 placed at locations noted above, and cast one set of four cylinders.
Cylinders: #61673-#61676
Work inspected was in compliance with project plans and specifications.
If there are questions concerning this report (rp-009rc), please contact the Project Manager listed above.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: George Dupont
Corporate Construction Services Manager
CC: hurt Karst, Alderson Karst Miro Architects, PA; Ted Hendricks, East Central Idaho Planning &Development Association;
Mark Andrus, G & S Structural engineers; Arden Smith, Ormond Builders, Inc.; Val �Christians�n City of Rexburg
1230 North Skyline Drive, Suite C, Idaho Falls, ID 83402 208-529-8242 Fax: 208-529-6911 ail:i� tkd., om Website- ww.mtki . m
MATERIALS
TESTING �
INSPECTION
❑ Environmental Services
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
LJ Geotechnical Enjfleerirng
PAGE ##1 OF 1
REVISION DATE 812212 06
WkEASTERN
HEALTH EDUC & BU
DEVRPTNOSWEDOC
0 Construction Materials Testyna
6
Phones
Fax*
r:
Project: Health Education & Business
Project Manager:
Inspector:
Inspec6on Date:
Development Center
Dan King
Kyle Kofford
August 2, 20U6
STRUCTURAL STEEL WELDING INSPECTION REPORT
Phase II, Rexburg
On the above date, our representative performed work an the referenced project as reported below.
MT1 representative attended a pre. construct iqon meeting for steel
If there are questions concerning this report (rptOl Oswe), please contact the Project Manager fisted above.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: George DuPont
Corporate Construction Services Manager
CC: hurt Karst, Alderson Karst Mitro Architects., PA; Ted Hendricks,East Central Idaho Planning & Development Association"
Mark Andrus. G &r S Structural Engineers; Arden Smith, Orin uil r _Inc.. Val
f st'
iansen City of Rexburg
1230 North Skyline Drive, Suite C., Idaho Falls, I D 83402 208-529-8242 F
ax: 208-529-6911
Email: e in ti Qnnfi-i . corn Website: 'w . fa -i , orn
MATERIALS
TESTING &
INSPECTION
PAGE #1 OF 1
REVISION DATE 8122)2006
R'�EASTERN
I DAH 0\200 6 RE PC)RTS\E6 C,10 3C -
H EALTH
HEALTH Emic & Bus
DEV\RPT012Rc.Doc
J Environmental Services LJ Geotechnical Engineering D Construction Materials Testing D Special-Inspe-.dions
Val C
City of Rexburg
PO Box 280,
Rexburg, ID 83440
Phone:
Fax:
Other:
Project: Health Education & Business
Project Manager,.*
Inspector:
Inspection Date:
DevelapmentCenter
Dan King
Stephen Fremming
August 10, 2006
REINFORCED CONCRETE INSPECTION REPORT
Phase 11, Rexburg
On the above date, our representative performed work on the referenced project as reported below.
Inspected reinforcing steel placement at eastern half of slab fiom gridline 6 to I I between rows B and H.
Perforined two air entrainment tests and two slump tests. Observed placement, and consolidation of 1 1 9V2 cubic
yards of Walters concrete mix #1 10 placed at locations noted above, and east two sets of four cylinders.
Cylinders,.* #61916-#61919 / #61920-#61923
Work inspected was
in compliance with project plans and specifications.
If there are questions concerning this report (rpt012rc), please contact the Project Manager listed above.
Respectfully submitted.,
MATERIALS TESTING &INSPECTION INC.
Reviewed by: George DuPont
Corporate Construction Sen4ees Manager
CC: Kurt Karst, Alderson Karst Mitro Architects, PA; Ted Hendricks, East Central Idaho Planning & Development Association;
Mark Andrus, G & S Structural Engineers; Arden Smith, Ormond Builders, Inc.; Val Clu--istiansen City of Rexburg,
1230 North Skyline Drive,, Suite C, Idaho Falls, ID 83402 208-529-8242
Email: e1'nntigrntj-id.com Website: www-mfi-id.corn Fax: 208-529-6911
MATERIALS
TESTING �i
INSPECTION
PAGE #1 OF 1
REVISION DATE 8122/2006
REASTERN
I DAH a�20 06 REPORTST6 0103 c -
HEALTH EDUC, & BUS
DEVRPT01 I RC- DOC
U Environmental Services J Geotechnical Engineering D Construction Materials Testing 11 Special Inspect'
Ions
Val Christiansen
City of Rexburg
PO Box 280
Rexburg, ID 83440
Phone:
Fax:
Other:
Project: Health Education &Business
Project Manager:
0
Inspector;
Inspection Date:
Development Center
Dan King
Troy Posio
August 4, 2006
REINFORCED CONCRETE INSPECTION REPORT
Phase 11, Rexburg
On the above date, our representative perforined work on the referenced project as reported below.
Inspected reinforcing steel placement from gridline I ta 5.9 between rows F and H.
1Vlonito:red two loads arriving at the job site for correct mix and proper slump. Performed one air entrainment
test and one slump test. Observed placement and consolidation of 110 cubic yards of Walters concrete mix
#110 placed between gridlines I and 5.9 from ro,w B to H, and cast one set of four cylinders.
Cylinders*. #61862-#61865
Work inspected was in compliance with project plans and specifications.
Zf there are questions concerning this report (rptO11rc), please contact the Project Manager fisted above.
.1
Respectfully submitted,
MATERIALS TESTING &INSPECTION INC.
Reviewed by: George DuPont
Corporate Construction Services Manager
CC: Kurt Karst, Alderson Karst qtr o Architects, PA; Ted Hendricks, East Central Io Planning & Development Assoc.iation;
Mark Andrus G & S Structural Eng'
ineers; ATdeii Smith Omiond Builders Inc.- Val Christiansen 1
7 P C'ty of Rexburg
1230 North Skyline Drive, Suite C, Idaho Falls.. ID 83402 208-529-8242 Fax. 208-529-6911
Email. eirriti Lamfi-dcom Website: www.mti-id.com