HomeMy WebLinkAboutCHECKLIST - 06-00146 - Westwood Theatre - Remodel13
Ir
Tyy
�-, " E 0 Loo
1 T1 j
REXBURG
CW
America's Family C'anun unity
BUILDING SAFETY DEPARTMENT
19 E. Mair (Pa Box 280)
Rexburg, Idaho 83440
wuvw.rexburq.prg
Commercial/Multi amil
Seismic Design Category — D
(unless sail evaluation confirms category C)
Ground Snow — 50 lbs., per sq, ft.
Phone: 208-359-3020 x326
Fax: -359-3024
janellh rexburg.ora
Office Hours: Monday -Friday 8900am-4:00PM
Pre -Construction Checklist
Frost Depth — 36"
Roof Snow Load — 35 lbs. per sq. ft.
Wind Load — 90 MPH
The following items should be completed before you submityo�� building permit aPP
P lication.
Completion, of a Building Permit Application: You may print this application from our website
www.rexbur .org or pick up a coy at the Community Development Office (address. above).
Commercial Permits; {the following must be submitted with the Appli"cation)
LJ 4 sets of site plans and 2 sets of buildi*ng plans stamped by a licensed professl*onal
LJ Site plans and buildiniz pians on CD
0
LIF
9
Structural Calculations stamped by a licensed Engineer
Energy Compliance Report: As per the 2003 IECC, a Compliance check must be completed and
sul%m�+ted(th1 e comcheck is av�aiiable online at www,ene:r cages. ov)
Page 2 of the Application must include the Idaho Contractor's Reaistra ion dumber or the exemption
form must be �omp�ieted and steed, see Page 8.
D Wage 4 of the Application must bc completed and si
License is required for our files.
Ll Page S of the Application must be completed by si
Mechanical License is required for our fres.
Ll Mechanical system sizing and design
LJ Emergency Services Construction Permit
our Plumber. A copy of the Plumber's
our Mechanical Contractor, a copy of the
Electrical Permit: If your construction involves electrical, you will be require
from the State of Idaho according to the State of Idaho Electrical Denqrtment
d to purchase an electrical permit
• The Electri*eal Inspectar can be contacted at (208.)-356-4830 or toll free 1.800-839-9239'.
• The Electrical application is available at the Community Development Office.
.Remodels: Ifyou. are considering a remodel, a cry, of the bid or estimate for the remodel must be su
with the Permit Application,
2 set of plans (mai need IECC Review)
• Addigfions — Same as new construction
bmi-tted
11