Loading...
HomeMy WebLinkAboutDUCT SYSTEM SUMMARY - 06-00138 - 4584 Timberline Rd - New SFR MechanicalDuct Syste Summary Entire House BW Heating & Air Conditioning P.O. Box 1931, Rigby, ID 83442 Phone: 208-403-5520 Job: 1 Date: Mair 15, 2006 B: Sean 1. 11 i Project Info � . � • - - � • For: Brent Pingle 4584 Timberline, Rexburg, ID 83440 Phone: 208-351-1046 Extemal static pressure Pressure losses Available static pressure Supply f return available pressure Lowest friction rate Actual air flow Tata! effective length (TEL) Heating 'f.DD ire H24 0-00 in H20 4.00 in H20 0-50/0.50 in H20 0.388 in/1 oo� 1700 cfm X58 ft Cooling x.00 in H20 0.00 in H20 1.00 'in w20 0-50 /0-50 in H20 0.388 in/1 QQft 1700 cfm Design Htg C19 Design Diam Name (Btuh) (cfm) (cfm) FR (in} Main Floor closet sterb th Bedroom Master Bedroom Basement - B cement Basement'i Basement 1-A Bathroom Basement Kitchen Kftcher�-A Bedroom 1 Living Room, Laundry - Rect size din h 0 529 0 0.000 Q 1 Ox 0 h $9 23 9 0.000 0 Ox 0 C 514 31 50 0.000 0 0x0 h 711 78 69 0.000 0 Ox 0 h 676. 99 66 0.000 0 Ox 0 h 7273 144 35 0.391 6 0x0 h 7273 144 35 0.388 6 Ox 0 h 3659 72 35 0.392 4 Ox 0 h 3659 72 35 0.397 4 Ox 0 h 143 3 0 0.488 4 Ox 0 h 5302 105 82 0.461 5 Ox 0 C 1444 30 741 0.000 0 0x0 C 1444 30 141 0.000 0 Ox 0 C 515 45 50 0.000 0 Ox 0 C 5161 143 503 0.000 0 Ox 0 C 4598 153 448 0.000 0 0x0 Duct Matl ShMt ShMt ShMt ShMt ShMt ShMt ShMt ShMt ShMt ShMt ShMt ShMt ShMt ShMt ShMt ShMt Actual Ln (ft) o_o 0.0 o.o 0.0 0.0 31.0 43.0 40.0 27.0 5.0 27.0 0.0 0.0 0'.0 0.0 0.0 Ftg. Eqv Ln (ft) o.o 0.0 0.0 0.0 0.0 225.0 215.0 215.0 225.0 200.0 190.0 0.0 0.0 0.0 0.0 0.0 runk st4 5$3 Std st3 5t2 stz 801OVitalk Value have been uafty o 6 e A�Uh.. VVr1 Rio -Sum Residential 5.9-20 RSR W Y4CCJk CAMy Docu ent Wri g ht soft HVACkBrent Pingl . up Calc OFientafflon = By 1006 -Mar -17141210 Pape 1 MAR 1 7 20061 a Grill, Htg CIg TEL Design Ve.loc Diam RectSize Stud/Joist Duct Name Size (in) (cfm) (CfM) (ft) FR (fpm) (in) (in) Open ing (in) Matl Trunk rb3 0x 0 213 730 Q.0 0.000 0 0 Ox 0 ShMt rb5 0x0 18C 117 0.0 0.000 0 0 Ox 0 ShMt rb4 0x0 287 619 0.0 0.000 0 0 Ox 0 ShMt rb6 0x 0 360 106 0.0 0.000 0 0 Ox 0 ShMt rb1 0x 0 54 59 0.0 O.000 0 0 Ox 0 ShMt rb2 0x 0 606 69 0.0 0.000 0 0 Ox 0 ShMt VV.rIghtSC)ft Right-SuiteResiderdialS.9.20RSR CWy DocumentsWrightsoft H rent Ping Je Calc 200--Mar-I 7 14:1210 Page a AOON � AED At:psessment � Entire House BW Heating & Air Conditioning g by 5 10 83442e 208-403-5520 Job: 1 Date: Mar 15, 2006 Sean For: Brent Pingle, 4584 Tim�edine, Rexburg, #D 8344Q Phone: 208-351-1046 Location: Idaho Falls, Elevation: Latitude: ID, US 0: ft 38°N Outdoor: Dry bulb (°F) Daily range (°F) Wet bulb (°F) Wind speed (mph) Indoor: Indoor temperature (° F) Design TD (°F) Relative humidity (%) Hating Cooing Moisture difference (gr/lb) -20 89fi�tration: �� � H) Method Construction. quality 15.4 7.5 Fireplaces Heating 70 90 30 31.2 Simplified Average 0 Cooling 75 14 50 -33.8 610 t 510 4,5 , ,i 0 2,51 ,01 1,5t 1,( Hourly Glazing Load 50 A 1 0 12 1 Hour Day H� " Average °. AED limit 1 Maximum hourly glazing load exceeds average by 33.3%. House does not have adequate exposure diversity► (AED), based on AED limit of 30°/a. Recommended procedure: Peak Selected procedure: Average (user) Wil% value have been manually oven VVr-i h t Right -Suite Residerrtial 5,9.20 RSR ACICAN CAMY DO-cumeflts\Wrightsoft HVAMBrent Pinglexrp Calc MJS Ohentation W6 -r-1 7 14:12:10 Page 1 I r Right=*., Norksheet Entire House BW Heating & Air Conditioning Job: I Date: MarI5 2006 Sean P.O. Box 193, Rigby, ID 83442Phone: 5520 1 Room name Exposed wal 1t 10.0 Matrbth ,� ft ftCeiling height h t/ Room dimensions hl 0 ft TY Construction U -value or HTMM Area number (13tuh/ftz-"F)i(Btu 2) or pedarter t(Btuh) or pehmeter (ft) (13tuh) Feat Cool Gross NIPIS Heat Cool GrOss NINS bleat Cool Y_ 1 -Ob 0.063 n 6.12 0.23 40 40 245 0 0 0 1 -+ 0ob -650 n 53.50 14.62 0 0 1 Dow 0.570 n 51.30 12.60 11 NO 0,35 n 31.50 6.47 0 0 0 0 0 0 �1 �1 1 -Osw 0.091 n 3.1 1.23 0 a Y -G 15A 1 -Oocw0.071 e 3.96 U4 0 0 0 0, 0 1 -ob 0.650 e 5&50,a.1 7 0 0 0 0 0 12E-Obw 0.063 e 6.120,23- 4040. 245 9 56 3 294 11 1 D-c2ow 0.570 e 51.30 38-97 0 0 0 0 3 0 410 31. vv 12C-Osw 0.091 a 8,19 1.23 0 0 0 0 1 .1 -�- 0 0 12E -Ober 0.068 S 6.120,23 0 0 1D-c2ow 0.570 s 51.30 19.20 0 I 0 0 0 0 11NO 0.350 S 31.50.47 0 0 0 0 12C-Osw 0.091 S 8.191.23 0 0 0 0 0 1.Ew 0.068 w 6.120..23 0 0 0 1 - 0.091 , 1 1.3 0 0 0 1 - 0.091 - .1 0.33 0 0 0 0 0 16B-38ad0.026 - 2.34 1.0 1 - 38ad 0-029 - . 1. 0.41 0 0 0 0 0 F 21A -28t OM2 -3 0 0 - 0.049 1.53 0.24 0 0 0 0 0 Enire10 loss/gain 548 4 786 361 1 InItor b) Ventilation 623 43 436 30 13 internal gains: occupants a 230 0 ppliancias .0 1200 0Less �em.�I load Less transfer 0 Redistribution 0 14 Subtotal 0 0 3251 123. 1172 89 15, Cert 1oads0%�� 1 514 0 0% % Total room load Air required (cfm) 1172 89 1548 514 -150 Printout certified 4y ACCA to meet all requirements of Manua! J nth Ed New F- V Right -Suite Residual 5.9.20 R - - ,WD ocumentsfflri ht o H\B rent Pingle.rrp Cale = Mj8 J4C Orientation - N 2006 -Mar -17 14:12:10 Page Right. Norksheet Job: I !- Entire House Date: Mar 15, 20QB BWHeating & Air Conditioning By: Sean P.O. Box 193, Rigby, ID 83442 Phone- 208-403-5520 IRoom name Entire House Main Floor Exposed waif 468.0 ft 114. 0 �t 3 Ceiling height dimeAsians 8.9 fi 4 Room c! 11.0 ft heat only 5 Roam area 4837.8 ft21102_0 W38.E x 29.0 #t Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2) or perimeter {ftf (Btuh) 4r pedmeter (fit) (Btuh) Meat Cool Gross NlP1S Heat Cool Gross NIPiS Meat Coot 6 W 12E-Obw 0.068 n 6.12 0.23 1016 939 5747 217 4 0 0 0 . 1D-c2ob �.FSQ n �8.5D 94.82 32 0 1872 4B$ D 0 0 Q - 1D-c2vw 0.570 n 51.30 12.60 24 0 1231 302 0 p 0 f} 71 N4 [].350 n 31.5a 5.47 21 21 662 136 0 p p 0 'i 1 W 12C -SSW 0.091 n $.19 1.23 380 380 3112 fl 384 380 3112 0 W 1 5A1 9-Oocw-6 0.071 e 3.96 4.24 128 112 482 4 0 U Q D 1D-C2oh 0.650 E 58.54 46.17 16 0 936 739. 4 [} 0 p T_G 12E-Obw 4.x68 e 8.12 Q.23 472 456 27'91 105 0 0 0 p 9 D-c2aw 0.570 e 51.30 38.97 16 [] 821 623 0 q 0 0 Vlf 120-0sW @.a91 @ $.19 1.23 290 290 2375 0 290 290 2375 0 W 15A19-Ocew-6 0.071 S 3.96 0.24 304 304 1389 18 0 p 0 Q 12E-Obw 0.068 s 6-121 0.23 608 523 3201 121 0 p (# p 1 D -clow 0.570 s 51.30 19.20 64 0 3283 1229 Q p a 4 11Nt} {3.350 s 31.50 6.47 21 21 562 136 0 t7 0 0 W 12C-Osw .0.091 S 8.19 1.23 380 380 3112 0 380 380 3112 4 1N 12E-0bw 0.06$ w 6.72 t3.23 344 304 1860 70 0 U o a W 12C-4sw 0.091 w 8.19 1.23 90 90 737 0 90 90 737 0 P 12C-Osw 0.091 - 8.99 0.33 334 334 2735 73 110 110 901 D C 1613-30ac! 0.432 - 2.88 1.34 Ota 40 115 54 0 p q 0 C 1613-38ad 0.026 - 2.34 1.09 2533 2533 5927 1434 1224 1224 2863 0 C 1$A-38ad 0.29 - 2.E1 0,41 72 72 188 29 0 0 ❑ 0 F 21A-28# 0.022 - 1.98 0.00 2339 217 4631 0 4 b (} p F 19G-19Cscp 0.049 - 1.53 0.24 58 B 89 0 55 6 89 d Envelope loss/gain 47958 5755 13189 p 12 a} Infiltration 2843 1345 b) Ventilationggg4 {} � Q ❑ d 13 Intemai gains: Occupants @ 230 5 a s Appliances @ 120 7 ��0 � 0 Less external load o � p Less transfer p p Redistribution G 0 0 � 14 Subtotal 0 0 0 0 15 Dict loads ���88 ���Q1 22074 D 12% 13% 9521 7943 21% 0% 4635 0 Total room load Air required (cfm) 85909 17444 2879 p 1700 1700 529 0 Printout certified by ACOA to meet all requirements of Manual .t Rth Fri . Dight -Suite Residential 5.9.20 RSR Wy Docu ent \Wrightsof# HVAC�Brent PIn le rrp Calc = MJ8 Orientation Page 1 Entire House d Ventilation air Equip.. @ Q.94 RSM Latent coaling TOTALS .,.--IV%- I 101749 901&ftfic values have been manually oma " Printout certified by ACOA to meet all requirements •".'^ VV1 Right -Suite Residual 5.9.20 RSR ACa C --WY DCMWrihtsaft HreW Pinglexrp Calc- 17444 2464 20077 0 170p 1700 =17 14:12:10 Page 4 snort Form Entire House BW Heating & Air Conditioning P-0. Box 1931 Rigby, ID 83442 Phone: 20&403--5520 Job: I Date: Mar 1, .006 Sean For Brent Pingle 45$4 Timbe€fine, Rexburg, Phone: 208-351-1046 Method Construction quality fireplaces Infiltration Simplifed Average 0 HEATING EQUIPMENT Make American Stan Trade Ameris#ar Model 3,5 Efficiency 0 HSPF Heating input Heating output p Temperature rise p Actual air flaw 1700 Air flow factor 0.02D Static pressure 1.00 Space thermostat ROOM NAME Area (ft) Main Floor closet Masierbath Bedroom 2 Master Bedroom Basement Stairs Utility Basement 1 Bath room 3 Basement 2 Kitchin Bedroom 'I Living Room Bathroom 1 Laundry Room3 Btuh @ 47°F OF CfM cfm/Btuh in H20 1102 25 35 132 Htg load (Btuh) COOLING EQUIPMENT Nuke American Stan Trade Ameristar Cond 3.5 Coil 4 ton Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 26709 1172 1548 3917 Cig load (Btuh) 1 711 252 49$C 676 1102 14547 724 84 p 0 156 0 D 338 1319 725 72 143 p 524 5302 842 204 3a45 2889 132 X25+6 515 382 7244 5161 25 0 p 72 7721 4598 1 0 0 &oid/rtafic values have been manually oven Printvut certified by ACOA to meet all requirements of Manual J 8#h Ed. Htg AVF (Cfm) 0 EER o Htg Cig Outside db (°F) -20 gg Inside db (°F) 70 75 Design TD (°F) 90 14 Daily range _ H Inside humidity (%) - 50 Moisture difference (gr/lb) - -34 Method Construction quality fireplaces Infiltration Simplifed Average 0 HEATING EQUIPMENT Make American Stan Trade Ameris#ar Model 3,5 Efficiency 0 HSPF Heating input Heating output p Temperature rise p Actual air flaw 1700 Air flow factor 0.02D Static pressure 1.00 Space thermostat ROOM NAME Area (ft) Main Floor closet Masierbath Bedroom 2 Master Bedroom Basement Stairs Utility Basement 1 Bath room 3 Basement 2 Kitchin Bedroom 'I Living Room Bathroom 1 Laundry Room3 Btuh @ 47°F OF CfM cfm/Btuh in H20 1102 25 35 132 Htg load (Btuh) COOLING EQUIPMENT Nuke American Stan Trade Ameristar Cond 3.5 Coil 4 ton Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 26709 1172 1548 3917 Cig load (Btuh) 1 711 252 49$C 676 1102 14547 724 84 p 0 156 0 D 338 1319 725 72 143 p 524 5302 842 204 3a45 2889 132 X25+6 515 382 7244 5161 25 0 p 72 7721 4598 1 0 0 &oid/rtafic values have been manually oven Printvut certified by ACOA to meet all requirements of Manual J 8#h Ed. Htg AVF (Cfm) 0 EER o stun o Btuh 0 Btuh 1700 cfm 0. 0 97 cfm/8tuh 1.00 in H2O 129 C I AVF (Cfm) 529 p 23 g 31 50 7$ 69 99 66 288 71 0 p 0 p 145 71 3 0 105 82 60 2g2 45 50 143 503 0 p 153 448 0 p vvRight-Suite eswem ,5.9.20 RSR ACCK GAMY DmumenlsWrightsaft HVACkBrent piNle.rrp Calc = Mia Orientatio 2001r-1 7 14,12:10 Page 1 Project*ummary Entire House BW Heating & Air Conditioning P-0- BOX 1931F Rigby, y, I0 83"2 Phone: 08-40 Job-. 1 Date: Mar 15, 2006 : Sean For: Brent Pingfe 4584 TimberlineRexburg, ID 83440 Phone: 208-351 -1046 Notes- Weather: Idaho Falls, ID, US Winter Design. Conditions outside db �� o� Inside db D Design TD gp ° F Heating Summary Buildinheat doss Ventila?ion air Ventilation air Ions Design heat load Method Construction Fireplaces Infiltration quality Area (ft2) Volume (W) Air Changes/hour Equiv. AVF (cf,m) 85909 Btuh !BO cfm 15840 Btuh 101749 Btuh Hewing 4638 38289 0.45 2$7 Simplified Average 0 Caving 3536 26206 0.20 87 Heating Equipment Summary Make American Stan Trade Ameristar Model 3. 5 Efficiency Heating input Heating output Temperature rise Actuat air flow Air flaw factor Static pressure Space thermostat 0 HSPF D Btuh @ 47°F 0 OF 1700 cfm 0.020 cfm/Btuh 1.00 in H20 Summer Design Conditions Duside db 89 OF inside db 75 OF Design TD 14 "F Daily range Relative humidity Q % Moisture difference _34 gr/lb Sensible Coving Equipment Load Sizing Structure Ventilation Design temperature swing Use mfg. data Ra , ing multiplier Total sans_ equip. load 17444 Btuh 2464 Btuh 3.0 OF n 0.94 200 77 Btuh Latent Cnvling Equipment Load Sizing Interna! gains Ventilation Infiltration Total latent equip. load 1000 Btuh 3676 Btuh -2007 Btuh 0 Btuh Total eqUipment land 20077 Btuh Req. total capacity at 0.70 SHR 2.4 toy Cooling Equipment Summary Make American Stan Trade Amedstar Con 3.5 Gail 4 ton Efficiency Sensible coaling Latent cooling Tots! coy I i rig Actual air flow Air flow factor Static pressure Load sensible head ratio C3vl&rtaliC values have been ►na►luwy overridden Printout certified by ALGA to meet alb requirements of Manual J 8th Ed. 1r1 t Right-SufteResidentiM5.9.2ORSR ACC► : may DocumentsWrIghtso#t HVA gent pig 0 EER 0 Btuh 0 Btuh o Btuh 97Q0 Cfm 0.097 cfmlBtuh 1.00 in H24 129 % D ar-I 7 14.12 10 -: Ceiling sunder vented attic, no ro *� barrier, dark Miles, R-38 insulation - 8a : Ceiling below roof joists, dark shingles, R-38 blanket or Bose fill Floors 1 A - 28t.- Tile covered baseme rpt floo r# N o i n su l tion, 28' 1 -1 cp: Ca rpeted floor over tig int are lased crawl, -11 wa II 1 9 blanket ' 1 tRight-Suite Residential 5..9.20 RSR CAMY Ducumentsmrigmsoft HreM PlinglejTp Calc = Mja OfiertKion 2533 0.026 .04� .30 72 0,029 38.0 2.61 188 0.41 29 2339 0.02.E 0.0 1.98 4631 0,00 58 0.049 19.0 1.53 89 0.00 -or-1 1-12:10 r Co pot Constructions � Entire House BW Heating & Air Conditioning P-0. Box 193, Rigby, ID 83442 Phone: 2 03-5 () Data: Mar 16, 2006 By: Sean For: Brent Pingle 4584 Timberline, Rexburg, ID 83440 Phone: 208-351-1046 1,.vtA2E1uT1: Idaho Falls, }Li} VS Elevation: Q ft Latitude: 38°N Outdoor: Heating Dry bulb {°F} _gyp Daily rangy (°F) Wei bulb (°F) _ Wind speed (mph) 15.0 Cooling 89 34 H so 7.5 Indoor: Indoor temperature (OF:) Design TQ CF) Relative humidity Moisture difference (grllb) Infiltration: Method Cons rucc ion quality Fireplaces Heating 70 90 30 31.2 Simplified Average 0 Cooling 75 14 50 -33.8 %,00nstructivn descriptrions Or Walls 1 - b - Wood stud frame, brick veneer} n board insulation, -1 9 cavity 'Insufation 1 - . Wood stud frame, siding or stucco, no board in u i io - cavity insulation r 1 1 -cw- : Basement - open core block, wood Stud framing, interior finish, -i 9 cavity, no board Partifions 12C-Osw Wood stud frame, siding or stucco, no board insulation -1 3 cavity insulation Windows 1 D -b: Operable, metal frame with bre 100% blinds 45-0., medium I [D- : p r , clear glass, wood frame} 2 pare; 100% blinds 450 , medium Doors 11 NO: Metal door, polystyrene cow, no storm Ceilings l : Ceiling under vented attic, no radiant barrier, dark shingles, R-30 insulation A/ f 1 F i t- ua Residential 6.9.20 RSR ACCk C:Wy DOcumeritsWrightsoft H rent Pin te.rrp Calc = Mj8 Ori n e S W all n 1 F all e S all Area -valueInstil R Htg HTMLoss 58. Cig HTMGain 14.6468 (ftp) (BtU h°?s'5F) MR- F to h) (tuh ) (Btuh) Stuhftt� (tuh) 939 0,068 %.0 6.12 5747 0.23 217 456 0.068 19.0 .1 2791 0.23 10 523 O.W8 19.0 .1 3201 0.23 121 304 0.068 19.0 1 1860 0.23 70 2222 0.068 19.0 .1 13599 023 514 380 0.091 13.0 . 1 3112 0.00 2154 290 0.091 13.0 . 1 2,375 0.00 380 0.091 13,0 8.19 31120.00 90 0,091 13.0 8.19 737 0.00 0 1140 0.091 13,0 9337 0,00 0 112 U44 19.0 4.31 482 0.03 4 304 0.044 1M 4.57 1389 OM 1 416 0.044 19.0 4, 50 1871 0.05 22 334 0.091 1 1 . .1 2 7350-22 73 n 32 0:650 58. 14.6468 1 0.350 16 0.650 662 58.5 936 46.2 739 all 48 0.650 0,0 58.5 2808 25,1 30.0 n 24 0.570 00 51.31231 12.6 302 16 0.570.0 51.3 821 39.0 S 64 0.570 0.0 51..3 3283 19.2 1229 all 104 0.570 0.0 513 5335 20.7 2154 2006 -Mar -17 14:1210 im OEMx.47 136 1 0.350 0.0 662 6.47 136 all 42 U50 0.0 31.5 1323 6.47 272 40 0.032 30.0 2.88 115 1*4 54 2006 -Mar -17 14:1210 im Building Analysis Entire House BW Heating & Air Conditioning .. Box 1T Right', 1D 83442 Phone. 00-5520 Job: 1 Dat: Mar 15, 2006 Sean For: Brentbingle 4584 Tim, erline, Rexburg, Phone":208-351-1046 Locavvn; Idaho Falls,, Id, U5 Elevation: U ft Latitude-- 38°N Outdoor: Dry bulb (°F) daily range {°F} Wet bulb �°F} Wind speed (mph) Heati0 9 15.0 Coolin g 34 60 7.5 Indoor: Indoor temperature ('OF)} Design TDJ("F.)RelafEve humidty Moisture difference (grub) I nfi Itratiro n: H Method Construction quality Fireplaces Healing 70 90 30 31.2 Simplified Average fl Cooling 75 14 50 -33.8 Component Btu h/ft2 Btuh Btu %of load Walls 6.71 2.9 2742 27.1, Windows 53.6 Doors 8143 8.0 doors 31.5 0.6 1X23 1.3: Ceilings 2.4 6231 s.1 Floors 2.0 1345 4720 4.6 Infiltration 7.8 g.1 28430 27.9 [ducts 11.5, Internal gains 952' 9.4 Pi �n Blower 0 0 Hum idificafior� p p 0.0 Ventilation 21358 100.D 15840 15.6 Adjustments 0 Total 101749 100.0 Component Btuh/ft2 Btuh % of load Walls 0.1 6D9 2.9 Windows 22.'! 3361 15.7 Doors 6.5 272 1.3 Ceilings 0.6 1513 7.1 Floors 0.0 a 0.01 Infiltration 0.4 1345 6.3 Ducts 1943 g.1 Ventillation 2464- 11.5, Internal gains 8400 39.3' Blower 1451 6.8 Adjustments p Total 21358 100.D Overall E1 -value = 0.057 Btuhlf#2-°F WARNING: window to Roar area ratio = 3,3% - less than 5%, 4'�lj•L e ,801drWic vaimesbimw manuayYwerfidden AM RJVL-Sulte Residential 5.9-20 C:WY Documents ri htso t H Brent Pingle.up Ca1c, = M38 Orientation i 2006 -Mar -17 14,12:10 Page 1 R Right-., Worksheet Entire House BW Heating & Air Conditioning P.C. BOX 193, Rigbyo 10 83442Phone, 208-403-5520 Job.- 1 Date: Mar 1, 2006 B Sean Printout cerfified by ACCA to meet all paquirements r Right -Suite Residential 5.9-20 RSA cWy DocurnWWri#sem + C\Brent Prrrgr .rrp Calc = Mja Orientation 2006 -Mar -17 1412:10 Page 9 a Right -v. Worksheet Entire House BW Heating &Air Conditioning P.O. Box 193, Riigbyo ID 83442 Phone: 20&-403-5520 Job: I Date: Mar 15, 2006 By: Sean Printout certified by ALGA to meet all requirements of Manual J 8th Ed. At& N~ W -I c�j " its.- c:> Righl-Suite Residential 5-9.20 RSR C -My DocumentsMrightsoft HVACNBrenj Pingle.rrp Calc — miS Orientation = N 2006 -Mair -17 141210 Page 8 i Ir Right-.. Worksheet Entire House BW Heating & Air Conditioning P.O. Box 193, Rigby, ID 83442 Phone: 2003-5520 Job: I D w- Mar 15, 2006 By: Sean Printout certified by ACCA to meet all requirements of Manual J 8th Fri F Right-Sufte Residential 5.19-20 RS AM C --\ My DOcumentsMrightsoft HVACZrent Pira Ie. 2006 -Mar- 17 1 1 :1 Page Right,, Worksheet Entire House BW Heating & Air Conditioning P-0. Box 193E Rigby, CD 83442 Phone: 208-403-5520 Job: I Date} Mar 1} 2006 Sears Printout certified ACOA to meed all qtr Fight -ire Residential 5.9.20° RSR CAMy drrhf iIsrr Ic = MA Orientation Uirements of Manual 18 Ed. 2006 -Mar -1 7 141 10 t I Right-„ Worksheet Entire House BW Heating & Air Conditioning P.O. Box 1,93, Rigby, ID 83442Phone: X03_552() Job: I Date: Mar 15, 2006 13y: Sean Printout certified by RCCA to meed all Right -Suite Re-sidential;5.9.20 RSR J4158ik C+.\My DO UMents fright off H AMBrent Pingle-up Calc uiremenis of Manual .1 Rth Ffi -I 7 i:11 Page I Right Worksheet Job: 1 Entire House Date: "'ar' 5, 2006 By: sear BW Heating & Air Conditionin, g P.C. Box 1 93: Digby, ID 83442Phone: 263-6520 1 Room name Basement Stairs 21 Expos wall 105.0 ft 0.0 ft CaRing height 8.0 ft heaticcol &0 1t heat/cool Room dimensions 38.0 x 29.0 ft 21.6 x 4.O ft 5. Roorn area 1102.0 f12 84.0 ft2 Ty Construction U -value Or HTM Area (W) Load Area Load umtw (Btu -*F (Btul ft2) or perimeter (ft.) (15tuh) or ammeter (ft) (Btuh) Gross N/PIS Heat cool Gross NIPIS Feat Cool Heat cool 6 Vh12E-obw 0.066 n 6.12 6.23 304 304 1666 76 0 0 6 1 D ob 0.650 ri 5&50 14.62 0 0 0 1 D -clow 0.570 n 51 M 12.60 0 0 0 0 0 a 11NO 0.356 n 31,50 6.47 6 0 6 0 0 o 0 11 w 12C-Osw 0,091 n 8A9 1.23 0 0 6 6 6 0 0 1 5A 1 9-Oocw-6 t 0,071 e 3.9-6 0.24 0 0 -G +1 C-ob 0,650 e 58.50 46.17 0 0 0 0 0 6 t 0.068 a 6.12 0.23 6 0 6 6 0. 6 -G12E-Obw 1 D -clow 0,570 e 51.0 3.97 0 0 0 6 0 0 6 w 12C-Osw 0,091 e &19 1.23 6 0 0 6 6 6 6 1 5A 1 -hoc � 71 s 3y960.24 6 0 0 0 01 6 E-obw C.G68 S 6.120.23 304 364 1860 70 6 6 6 0 D --c2 0,570 s 51.0 19.20 0 0 0 0 0. 0 0 0 11NO 0350 s 31.50 6.47 6 0 0 0 0 6 6 12C-{)sw 0.691 S 8.191.23 0 0 6 .6 ` 6 0 6 1 E-ob 0.068 w 6.120.23 232 232 1 420 54 0 6 0 6 12C-iDsw s1 w 8A91.23 ' 0 0 0 6 0 6 0 0 :. P 12C-Osw 0..091 8.19 0.33 D 0 0 0 0 0 0 0 1613 -ad 0.032 - 2.88 21.34 40 1613-38ad 0,,626 - 234 1.09 0 0 0 0 0 0 6 0 I SA - d 0.029 - Z61 0.41 01 01 0 6 0 6 6 6 E 21A -28t 6.622 - 1,9.8 0.00' 1162 ' 105 2162 0 84 0 166 0 E 1- -1' CSP 0,649 - 1, O�24 0 0 0 0 0 0 0 6 Envelope Iomegain 1 7438 12 a) Infifttion b) Ventilation 6546 451 0 0 0 0 13 Intemal gains: Occupants @ 230 0 6 Appliances @ 1 0 Less 1 toad 6 Redistribution 6 � 14 Subtotal 563 25 -1 % 0 6 Total mom load Er required (gym) 14547 724 0 288 71 0 Printout certified bar ACOA to meet all %A.40' W -I < it Right -Suite Residential 5.9-20 RS AM C:XMy DocumentsWrightsoft HVAC rent Pinglexrp Cale = Mj8 Orientation ' H uirements of Manual J 8th Ed. 20MMar-17 14:1210 Pe