Loading...
HomeMy WebLinkAboutCOMPLIANCE CERTIFICATES - 06-00127 - Farm Credit ServicesMechanicalQ. Complian e Certificate 2o03 IECC COMeheek-EZ SofiWare Version 3.0 Release la Data filename: Unfitled.cck Section T: Project Information .rct Nae:Farm - t & Lease Space Rexburg Idaho Des - gn er/t ract o r: JRW 1 152 Bond Ave. Suite Rexburg, ID 83440 Document Aut. r. T l pp ho ne: Date: Section 2,* General Information Building Location (fir weather dada): Climate Zany: Heating Degree Days (base 65 degrees F): Cooling Degree Days (base 65 degrees F).- Project Type. S ecti.on 3: Me ch ani cal S yste ms List Quantity 4 Rexburg, Idaho 16 $693 143 New Constructiorl O Permit Number Checked By/Date Cooling: Packaged Terminal Unit, itfir- �, ��i� poled nor S Ingle Zone Section 4: Requirements Checklist Requirements Specific T HVAC System 1 1, Equipment minitnum eEciency­ Packaged meets2. Newly purchased cooling equipment the cooling efficiency requirements Generic Reire Must be met by all, systems 1. Loa calculations per 1997 ASHRAE Fundamentals 2. Plant Jpt and system capac-ity no greater tbwi needed to meet loads Exception: Standby equipmentautomatically�-� ti i is ratin Opti Multiple units controlled to sequencert -ion c. Minimum one temperature control device per system Minimum one humidity contras device per instaJ.led humidificatloWdehumidi�cation system Thermostatic controls has 5 deg, F deadband - Exception: Thermostats requiring manual changeover between heating and cooling Automatic shut-off dampers on exhaust systems and supply systems With airffow >3, 000 cfrn Outside -air source for ventilation; system capable of reducing OSA to required minimum R-5 supply and return air duct insulation in unconditioned spaces F R-8 supply and return air duct insulation outside the building � R-8 insulation between ducts and the building exterior when ducts are arto ilding assembly � -Exception: Ducts located within equipment 1 -Exception: Ducts with interior and exterior temperature diference not exceeding 15 deg. F. ] � 3. Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; j UL 1$ 1, A or 18 1 B tapes wid mastics j -Exception: Continuously welded and hacking -type longitudinal' oints and seams o� ducts � operating ax static pressures less tl��n 2 inches w, g, pressure classification ] � 10. Mechanical fasteners and sealants used to connect ducts �d air distribution equipment ] � 11. Operation and maintenance manual provided to building owner � J � 12• Balancing devices provided in accordance with IMC 603.15 [ � j 13. Mair and elevator sha$ vents are equipped with mototized dampers Section 5: Compliance Statement The proposed mechanical design represented in this document is consistent with the bu-ilding plans, specifications and other calculations submitted with phis Pel -mit app]icatian. The proposed mechanical systems havebeen deigned to meet the 2Q03 EECC requirements in COMcheek-EZ Version 3.0 Release la and to co,,,n1t, �xqt3� rhP An+,,�. ._ the Requirements Checklist, Principal Mechanical Designer -Name Y I ir t i Mechanical requirements Description 2403 IIECC COMcheckEZ Software Version 3.0 Release la Data filename: Untitled. cck The following list provides more detailed description of the requirement C erti fi cote. s in Section 4 of the Mechanical Compliance Requirements i !i T: HVAC System 1. The specified heatincy andlor cooling ' 1 t is covered the HRAE 90.1 Code and must meet thefoliowing minimumln: Pack T it X Unit: 11, 0 EER 2. The specified cooling equipment is cove -red bI minimum eTICIMCY requirements can be assum, ed to meet or exceed AS HRAE go. I Code requirements for equiprn ent eE cieney. Generic Requirements: Must be met by alI systems to which the requirement is applzcable I. Design heating and coling loads f)r the building mint be determined using procedures equivalent to those in Chapters 27 and Z$ of the ASHRAE Handbook of Fundamentals or an approved equivalent calculation procedure. 2- All equipment and systems must be sized to be no grater than needed to meet calculated loads, A single piece of equipment providing both heating and cooling must satisfy this provision for one fianetion with the capacity for the ather function as small as possible, within available equipment options, - Exception: The equipment and/or system capacity may be greater than calculated loads for standby pLupases. Standby equipment must b e automatically controlled to be of when the primary equipment and/or system is operating. Exception: Multiple units of the same equipment type whose combined capacities exceed the calculated lead are g allowed if they are provided with controls to sequence operation of the units as the load increases or decreases. 3. Each healing or cooling system serving a single zone must have its own temperature control device. 4. Each humidification system must have its awn humidity control device, 5. Thermostats controlling both healing and cooling must be capable of maintaining a 5 degree F deadband (a range of temperature tivhere no hating or coaling is provided). -Exception: Deadband capability is not required if the thermostat does not have automatic changeover capability between heating and pooling. 6. Outdoor -air supply systems with design airflow rates ,3,000 cfm of outdoor air and all exhaust systems must have dampers that are automatically closed while the equipment is not operating. 7. The system must supply outside ventilation air as required by Chapter 4 of the International Mecbanlcal Code. Tf the ventilation system is designed to supply outdoor -air quantities exceeding minimum required bevels, the system must be capable of reducing outdoor -air flow to the minimum required levels. 8. Air ducts must be insulated to the following levels -a) Supply and return air ducts far conditioned air located in unconditioned spaces (spaces neither healed nor cooled) must be insulated with a minimum ofR-5, Unconditioned spaces include attics, crawl spaces, unheated basements, and unheated garrages.b) supply and return air ducts and plenums muss be insulated to a minimum of R-8 when located outside the buildiDg. C) When ducts are located Within exterior components (e.g., bors or road), zl-tlnimurn R-$ insulation is reqttired only between. the duct and the wilding extenor. Exception: Duct insulation is not requiredon ducts located within equipment. Exception: Duct insulation is not required when the design temperature diffirence between the interior az-►,d exterior of the duct or plenum does not exceed 15 degree F. 9• All joints, longitudinal acid transverse stems, and connections in ductwork must be securely sealed. using weldments; mechanical fasteners with seas, gaskets, or mastics; mesh ani mastic sealingsystems; or tapes. T must b e listed and labeled in accordance with UL 18 1 A or UL ] 81 8. � � �e� and mastics - Exception: Continuously welded anlacking_t�pe longitudinaljoints and scorns on duets operating at qtatic. pz-es,%�ures Less than 2 inches w.g, pressure classificatian� 10. Mechanical fisteners and seals, mastics, or gaskets must be used, when connecting ducts to dans and ether al -To distribution equipment including multiple -zone terminal unfts. 1. Operation and maintenance documentation must be provided to the O'"Mer that includes at least the following infonnation* equipment capacity (input and output) and required maintenance actionsb) equipment operation and maintenance manualse) HVAC system control maintenance and calibration information, including wiring diagrams, ics, and control sequence descriptions; desired or field -determined set points must be perrnanently recorded on control drawings, at control devices, or, :br digital control s stem m s, in programing commentsd) complete narrative of how each system x s intended to operate. Y 1 2, Each supply air outlet or diffiser and each zone terminal device (such as VAV or mixing box) must have I balancina device. Acceptable balancing devices As own include adjustable dampers located within the ductwork, terminal devices, and supply air diffusers. 13. Stair and elevator shaff vents must be equipped with motorized dampers capable of being automatically closed during non -nal building operation and interlocked to open as required by fire and smoke detect' 10n systems. All gravity outdoor air supply and exhaust hoods, vents, and ventilators, must be equipped with motorized dampers that will automatically shut when the spaces served are, not III use. Exceptions: - Gravity (non -motorized) dampers are acceptable in buildings less than three storms - Ventilation systems serving unconditioned spaces.. in height above grade. Lighting Compliance Certificate 2003 IECC M C Z S offware Version 3. 0 Release I r Data flename: Untitled. eck Section lo. Project Information Project Name: Designer/Contractor- Document Author: Farm Credit Services &Lease Space Rexburg Idaho JRW &Associates, PLLC 1152 Bond Ave. Suite A Rexburg, ID $3444 Telephone: Date: Section I: General Information Building Use Description P ri ect Typ Activitv Troe(} BankfFinanciaf Institution Office . t ivI t f Type r w Construction Section 3: Requirements Checklist Brag. f Det. � Use � [ ]I InteriQr Lighting 1. Total actual watts must be less than or equal to total allowed watts Allowed Watts Actual Watts Exterior Lighting . Eficacy greater than 45 l ns/W Exceptions. - 2440 i s .244U Complies(Y/N) YES ig Permit Number Checked By/Date Floor Area 1600 Ygoo Specialized lighti".ng hi hlighti .t r historic ri uil i ; lighting; low -voltage landscape lighfing. Controls, Switching, and Wifing . Independent controls r each sPacc (Switch/occupancy Exception: Areas that must be cont .nuousl illuminated. . Master switch at entry to hotel/motel guest room. 5. Individual dwelfing units separately metered. M J f 6. Each space provided with a manual control to provide uniform light reduction capability. j Exceptions.& � Only one luminaire in space; An occupant -sensing device controls the area; � The area isa corridor, storeroom, resiroom, or Lobby; Areas that must be continuously illuminated; � Areas that use less than {].6 Watts/sq. ft. [ ] J 7. Automatic lighting shutof control in buildings larger tl.��n S, QQQ � ] � 8. Photocell/astronomical time switch on exterior lights. � Exceptions: Areas requir�ng lighting daring daylight hours [ ] J 9. Tandem wired one -lamp and three -lamp ballasted luminaires. Exceptions: Electronic high -frequency ballasts; Lumlnalrcs On emergency Circuits or wIth. no available, pair, Section 4: Compliance Statement The proposed. ling design represented thisistent w1th -the building plans, ' specifications and other calculations submitted it this xt application. The proposed lightirig system hass been des' MCC, Chapter 8, requirements 'n COMeheck-E7 i gned to meet the & 2003 in the RequirementsI _, Version 3.0 Release I a and to with t requirements Principal Lighting Designer-Narne i gn ature 3Zi I> 16 & Daze Lighting Application Worksheet 2003 IFCC COMcheck-EZ Salware Version 3.0 Release la Section I: Allowed Lighting Power Calculation 0 B ankl F i nand al Institution Office Section 2. Actual Lighting Power Calculation A Fixture F1 FIA 13 Fixture Descn-ption 4g" TS 32W 1 Electronic 48" T8 32W 1 Electronic F2 Twin Tube 18W / Electronic F3 48" T8 32W f Electronic F4 Incandescent 6(}W F 5 Incandescent 40W F6 48" T8 32W I Electronic Floor Area 421 otl. Allowed Watts watts/$2 0 Allowed Watts Total Allowed. Watts = 438 C D Lamps/ # of F1 3 3 1 1 S 2 2 E fixtar,es Watt. 16 12 3 1 2 1 95 95 17 32 Boa 80 F D x E) lszo 9s 204 96 300 Total Actual Watts — 2440 Section,3: C ompliance Calculation If the Total Allowed Watts minus the Total Actual Watts is greater than or equal to zero, the building complies. LigbtingPASSESO. Desigm. 44% bitter than code Total Allowed Watts = 4380 Total Actual Watts = 2440 Prvleci Compliance 1940 Envelope Compliance Certificate 2003 IECC CQNlcheck EZ Software Version 3. Q Release 1 a Data filename: S:1Drawingsl305-Farimm Credit Servicesl305.cck Section 1: Project Informatian Project Name: Designer ontr t r: Document th r- FARI'VI CREDIT SERVICES JRW & ASSOCIATES RICHARD Section, 2; General Information Building Location (fir weather date): Climate Zone. - Heating Deg one: H t n re Days (base 65 degrees F): Cooling Degree Days (base 65 degrees F)-. P rj t Type: ern Wall Ratio: Section 3: Requqp irements Checklist I,(,)r. Dept. Use Rexburg, Idaho 16 8693 143 New Construction 0,20 F 100 .. 3400 Permit Number Checked By/Date Air Leakage, Component Certification, and Vapor Retarder Requirements � . All Joints and penetrations are caulked, Basketed, weather-stripped, or otherwise sealed. 2. Windows, doors, and skylights certified as meeting leakage requirements. J. t1..omponent x -values cYi [1-ficctors labeled as certified. 4. Stair, elevator shaft vents, and other dampers inte,ral to the building envelope are equipped ixrith mntnri.�a.d ,7.,.�.....___ fi 1[.4A 112V LV[]r ,�11�]yI J. S. Cargo doors and loading dock doors are weather sealed_ . R ecesd I i tin t1x1rri 1 l rates and, scaled r as t or (ii) i hstalled ins de an cqrri air -tight assembly with a 0.5inch clearance with 3 inches Clearance from maul at i tori al. 7 Buildinb entrance doors have a vestibule and equipped with closing devices. � Exceptions: j Building enhances with revolving doors. j Doors that aper directly from a space less than 3000 sq. ft. in area. CII'mate-Specific Requ semen is ComD:onent y'iv roo Roof I ,- All -Wood Joist/Raff er/Truss Cornmentis: Ftr'r Wall I Wood Frme, Any Spacing Comments: Win 1: Metal Frame.Double Pane with_ Tinted, SHGC 0.58 Comments: Door I.- Glass, Tinted., 0.87 Floor 1:All-Wood .t ; Gross Area 3539 623 Cavity -Value Cont. Proposed Budget R -Value `"actor U --F or 0.0 0.0 0.610 0.920 U.049 (a) budget U -factors are used for s-ofiware baseline calculations ONLY, and are not code requirernents. Fn ve 1 o pe PAS S IES: Design 6 % better than code S e cti an 4: C ompliance Statement M 1. 0.520 0.520 0.040 The purposed envelope design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been, designed to meet the 2003 IEC C rec�uire�ents in CQMcheck-EZ Version 3.0 Release 1 a and to comply with the mandatory requirements in the Requirements Checklist. Principal En�e�o�e Designer -Name Signature Envelope Compliance Certificate 2003 IECC 0600127 Farm Credit Services C4Mcheck-EZ Soffwaxe Veni.on 3.0 Release 2 Data filename: SADrawin2s\305 Fame Credit Serviccsl30S.cck S ectian 1: Project information ProJect Name. - Design er/Confractor cum n Author: FARM CREDIT SERVICES JRW & ASSOCIATES RICHARD Section 2,: General Information Building Location (for weather data).- Climate ata):Climate Zone; Heating Degree Days (base 55 degrees F): Cooling Degree Days abase 65 degrees F): Projed Type: Window I Wall Ratio: ildin� TvDe Seefion 3-a Requirements Checklist Itexbwrg, Idaho ld 8693 143 New Construction Checked BylDate _U I n nr A 3400 Bldg. j Dept, � Use 1 � Air Leakage, C'om{ponent Certification, and Vapor Retarder Requirements 1. All joints and penetrations are caulked, gasketed, weather-stripped, or otherwise sealed. � ] i 2. Windows, doors,, and skylights certified as meeting leakage requirements. [ ] � 3- Component R -values & U -factors labeled as certified. � ] j 4- Stair, elevator sha$ vents, and other dampers integral to the building envelope are equipped, f with motorized dampers. [ ] � 5. Cargo doors and loading dock doors are weather sealed. [ ] � 6. Recessed fighting fixtures are: (i) Type IC rated and sealed or a�keted; or(ii)g installed inside an J appropriate air -tight assc�nbly with a 0.5 inch clearance from combustible materials and � with 3 inches clearance frorn insulation material. C � � 7. wilding entrance doors have a vestibule and equipped with closing devices. � Exceptions: � Building �ntxances with xevolving doors. f Doors that open directly from a space :Fess than 3000 sq. It. in area„ Climate -Specific Requirements onent Nan-ie/DesCn'-Dtio Rao 1: All -Wood Joist/Rader/Truss Exterior Wall 1: Wand Frame, Any Spacing Window I: Metal Frame:Double Pane with Low -E Tinted, SHGC 0.58 Door 1: Glass, Tinted, SHGC Q.87 Floor 1: All -Wood Joist/Truss Gross Area or Cavity dont. Proposed Budget Perimeter R -Value RNalueU-F U -Factor 3400 38.0 0.0 0.02 3539 21.0 0.0 0.062 0.067 623 �-- --- 0.610 0.520 100 --- --- 0.920 0.520 3400 19.0 0.0 o.049 0.040 (a) Budget U-Ectors are used r soRware baseline calculations requJ ,nents. ISai ve 1 o p e PASSES: Design 6°/fl better than code Section 4: Complia][1ce Statement The proposed envelope design represented in this document is �cvnsistent wi calculations submitted with this pewit the building pans, specifications and other �nmit application. The proposed envelope system has been designed to meet the 2003 IECC requirements in COMcheck-EZ Version 3.0 Release 2 and to comply with the mandatory requirements in the Requirements Checklist. Principal Envelope Designee -_Name _AAAj Date