Section T: Project Information
.rct Nae:Farm -
t & Lease Space
Rexburg Idaho
Des - gn er/t ract o r: JRW
1 152 Bond Ave. Suite
Rexburg, ID 83440
Document Aut. r.
T l pp ho ne:
Date:
Section 2,* General Information
Building Location (fir weather dada):
Climate Zany:
Heating Degree Days (base 65 degrees F):
Cooling Degree Days (base 65 degrees F).-
Project
Type.
S ecti.on 3: Me ch ani cal S yste ms List
Quantity
4
Rexburg, Idaho
16
$693
143
New Constructiorl
O
Permit Number
Checked By/Date
Cooling: Packaged Terminal Unit, itfir- �, ��i�
poled nor S Ingle Zone
Section 4: Requirements Checklist
Requirements Specific T HVAC System 1
1, Equipment minitnum eEciency
Packaged
meets2. Newly purchased cooling equipment the cooling efficiency requirements
Generic Reire Must be met by all, systems
1. Loa calculations per 1997 ASHRAE Fundamentals
2. Plant Jpt and system capac-ity no greater tbwi needed to meet loads
Exception: Standby equipmentautomatically�-� ti i
is ratin
Opti Multiple units controlled to sequencert -ion c.
Minimum one temperature control device per system
Minimum one humidity contras device per instaJ.led humidificatloWdehumidi�cation system
Thermostatic controls has 5 deg, F deadband
- Exception: Thermostats requiring manual changeover between heating and cooling
Automatic shut-off dampers on exhaust systems and supply systems With airffow >3, 000 cfrn
Outside -air source for ventilation; system capable of reducing OSA to required minimum
R-5 supply and return air duct insulation in unconditioned spaces
F R-8 supply and return air duct insulation outside the building
� R-8 insulation between ducts and the building exterior when ducts are arto ilding assembly
� -Exception: Ducts located within equipment
1 -Exception: Ducts with interior and exterior temperature diference not exceeding 15 deg. F.
] � 3. Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts;
j UL 1$ 1, A or 18 1 B tapes wid mastics
j -Exception: Continuously welded and hacking -type longitudinal' oints and seams o� ducts
� operating ax static pressures less tl��n 2 inches w, g, pressure classification
] � 10. Mechanical fasteners and sealants used to connect ducts �d air distribution equipment
] � 11. Operation and maintenance manual provided to building owner
� J �
12• Balancing devices provided in accordance with IMC 603.15
[ � j 13. Mair and elevator sha$ vents are equipped with mototized dampers
Section 5: Compliance Statement
The proposed mechanical design represented in this document is consistent with the bu-ilding plans, specifications and
other calculations submitted with phis Pel -mit app]icatian. The proposed mechanical systems havebeen deigned to meet
the 2Q03 EECC requirements in COMcheek-EZ Version 3.0 Release la and to co,,,n1t, �xqt3� rhP An+,,�. ._
the Requirements Checklist,
Principal Mechanical Designer -Name
Y I ir t i
Mechanical requirements Description
2403 IIECC
COMcheckEZ Software Version 3.0 Release la
Data filename: Untitled. cck
The following list provides more detailed description of the requirement
C erti fi cote. s in Section 4 of the Mechanical Compliance
Requirements i !i T: HVAC System
1. The specified heatincy andlor cooling '
1 t is covered the HRAE 90.1 Code and must meet thefoliowing
minimumln: Pack T it X Unit: 11, 0 EER
2. The specified cooling equipment is cove -red bI minimum eTICIMCY requirements
can be assum, ed to meet or exceed AS HRAE go. I Code requirements for equiprn ent eE cieney.
Generic Requirements: Must be met by alI systems to which the requirement is applzcable
I. Design heating and coling loads f)r the building mint be determined using procedures equivalent to those in
Chapters 27 and Z$ of the ASHRAE Handbook of Fundamentals or an approved equivalent calculation procedure.
2- All equipment and systems must be sized to be no grater than needed to meet calculated loads, A single piece of
equipment providing both heating and cooling must satisfy this provision for one fianetion with the capacity for the
ather function as small as possible, within available equipment options,
- Exception: The equipment and/or system capacity may be greater than calculated loads for standby pLupases.
Standby equipment must b e automatically controlled to be of when the primary equipment and/or system is operating.
Exception: Multiple units of the same equipment type whose combined capacities exceed the calculated lead are g
allowed if they are provided with controls to sequence operation of the units as the load increases or decreases.
3. Each healing or cooling system serving a single zone must have its own temperature control device.
4. Each humidification system must have its awn humidity control device,
5. Thermostats controlling both healing and cooling must be capable of maintaining a 5 degree F deadband (a range of
temperature tivhere no hating or coaling is provided).
-Exception: Deadband capability is not required if the thermostat does not have automatic changeover capability
between heating and pooling.
6. Outdoor -air supply systems with design airflow rates ,3,000 cfm of outdoor air and all exhaust systems must have
dampers that are automatically closed while the equipment is not operating.
7. The system must supply outside ventilation air as required by Chapter 4 of the International Mecbanlcal Code. Tf the
ventilation system is designed to supply outdoor -air quantities exceeding minimum required bevels, the system must
be capable of reducing outdoor -air flow to the minimum required levels.
8. Air ducts must be insulated to the following levels -a) Supply and return air ducts far conditioned air located in
unconditioned spaces (spaces neither healed nor cooled) must be insulated with a minimum ofR-5, Unconditioned
spaces include attics, crawl spaces, unheated basements, and unheated garrages.b) supply and return air ducts and
plenums muss be insulated to a minimum of R-8 when located outside the buildiDg. C) When ducts are located Within
exterior components (e.g., bors or road), zl-tlnimurn R-$ insulation is reqttired only between. the duct and the
wilding extenor.
Exception: Duct insulation is not requiredon ducts located within equipment.
Exception: Duct insulation is not required when the design temperature diffirence between the interior az-►,d exterior of
the duct or plenum does not exceed 15 degree F.
9• All joints, longitudinal acid transverse stems, and connections in ductwork must be securely sealed. using weldments;
mechanical fasteners with seas, gaskets, or mastics; mesh ani mastic sealingsystems; or tapes. T
must b e listed and labeled in accordance with UL 18 1 A or UL ] 81 8. � � �e� and mastics
- Exception: Continuously welded anlacking_t�pe longitudinaljoints and scorns on duets operating at qtatic.
pz-es,%�ures Less than 2 inches w.g, pressure classificatian�
10. Mechanical fisteners and seals, mastics, or gaskets must be used, when connecting ducts to dans and ether al -To
distribution equipment including multiple -zone terminal unfts.
1. Operation and maintenance documentation must be provided to the O'"Mer that includes at least the following
infonnation* equipment capacity (input and output) and required maintenance actionsb) equipment operation and
maintenance manualse) HVAC system control maintenance and calibration information, including wiring diagrams,
ics, and control sequence descriptions; desired or field -determined set points must be perrnanently recorded on
control drawings, at control devices, or, :br digital control s stem m
s, in programing commentsd) complete narrative
of how each system x s intended to operate. Y
1 2, Each supply air outlet or diffiser and each zone terminal device (such as VAV or mixing box) must have
I
balancina device. Acceptable balancing devices As own
include adjustable dampers located within the ductwork, terminal
devices, and supply air diffusers.
13. Stair and elevator shaff vents must be equipped with motorized dampers capable of being automatically closed during
non -nal building operation and interlocked to open as required by fire and smoke detect' 10n systems. All gravity
outdoor air supply and exhaust hoods, vents, and ventilators, must be equipped with motorized dampers that will
automatically shut when the spaces served are, not III use.
Exceptions:
- Gravity (non -motorized) dampers
are acceptable in buildings less than three storms
- Ventilation systems serving unconditioned spaces.. in height above grade.
Lighting Compliance Certificate
2003 IECC
M C Z S offware Version 3. 0 Release I r
Data flename: Untitled. eck
Section lo. Project Information
Project Name:
Designer/Contractor-
Document Author:
Farm Credit Services &Lease Space
Rexburg Idaho
JRW &Associates, PLLC
1152 Bond Ave. Suite A
Rexburg, ID $3444
Telephone:
Date:
Section I: General Information
Building Use Description
P ri ect Typ
Activitv Troe(}
BankfFinanciaf Institution
Office
. t ivI t f Type
r w Construction
Section 3: Requirements Checklist
Brag. f
Det. �
Use �
[ ]I
InteriQr Lighting
1. Total actual watts must be less than or equal to total allowed watts
Allowed Watts
Actual Watts
Exterior Lighting
. Eficacy greater than 45 l ns/W
Exceptions. -
2440
i s
.244U
Complies(Y/N)
YES
ig
Permit Number
Checked By/Date
Floor Area
1600
Ygoo
Specialized lighti".ng hi hlighti .t r historic ri uil i ; lighting;
low -voltage landscape lighfing.
Controls, Switching, and Wifing
. Independent controls r each sPacc (Switch/occupancy
Exception: Areas that must be cont .nuousl illuminated.
. Master switch at entry to hotel/motel guest room.
5. Individual dwelfing units separately metered.
M
J f 6. Each space provided with a manual control to provide uniform light reduction capability.
j
Exceptions.&
�
Only one luminaire in space; An occupant -sensing device controls the area;
� The area isa corridor, storeroom, resiroom, or Lobby; Areas that must be continuously illuminated;
� Areas that use less than {].6 Watts/sq. ft.
[ ] J 7. Automatic lighting shutof control in buildings larger tl.��n S, QQQ
� ] � 8. Photocell/astronomical time switch on exterior lights.
� Exceptions: Areas requir�ng lighting daring daylight hours
[ ] J 9. Tandem wired one -lamp and three -lamp ballasted luminaires.
Exceptions:
Electronic high -frequency ballasts; Lumlnalrcs On emergency Circuits or wIth. no available, pair,
Section 4: Compliance Statement
The proposed. ling design represented thisistent w1th -the building plans, '
specifications and other
calculations submitted it this xt application. The proposed lightirig system hass been des'
MCC, Chapter 8, requirements 'n COMeheck-E7 i gned to meet the & 2003
in the RequirementsI _, Version 3.0 Release I a and to with t requirements
Principal Lighting Designer-Narne
i gn ature
3Zi
I> 16 &
Daze
Lighting Application Worksheet
2003 IFCC
COMcheck-EZ Salware Version 3.0 Release la
Section I: Allowed Lighting Power Calculation
0
B ankl F i nand al Institution
Office
Section 2. Actual Lighting Power Calculation
A
Fixture
F1
FIA
13
Fixture Descn-ption
4g"
TS
32W
1
Electronic
48"
T8
32W
1
Electronic
F2 Twin Tube 18W / Electronic
F3 48" T8 32W f Electronic
F4 Incandescent 6(}W
F 5 Incandescent 40W
F6 48" T8 32W I Electronic
Floor
Area
421
otl.
Allowed
Watts
watts/$2
0
Allowed
Watts
Total Allowed. Watts = 438
C D
Lamps/ # of
F1
3
3
1
1
S
2
2
E
fixtar,es Watt.
16
12
3
1
2
1
95
95
17
32
Boa
80
F
D x E)
lszo
9s
204
96
300
Total Actual Watts — 2440
Section,3: C
ompliance Calculation
If the Total Allowed Watts minus the Total Actual Watts is greater than or equal to zero, the building complies.
LigbtingPASSESO. Desigm. 44% bitter than code
Total Allowed Watts = 4380
Total Actual Watts = 2440
Prvleci Compliance 1940
Envelope Compliance Certificate
2003 IECC
CQNlcheck EZ Software Version 3. Q Release 1 a
Data filename: S:1Drawingsl305-Farimm Credit Servicesl305.cck
Section 1: Project Informatian
Project Name:
Designer ontr t r:
Document th r-
FARI'VI CREDIT SERVICES
JRW & ASSOCIATES
RICHARD
Section, 2; General Information
Building Location (fir weather date):
Climate Zone. -
Heating Deg
one:
H t n re Days (base 65 degrees F):
Cooling Degree Days (base 65 degrees F)-.
P rj t Type:
ern Wall Ratio:
Section 3: Requqp
irements Checklist
I,(,)r.
Dept.
Use
Rexburg, Idaho
16
8693
143
New Construction
0,20
F 100
..
3400
Permit Number
Checked By/Date
Air Leakage, Component Certification, and Vapor Retarder Requirements
� . All Joints and penetrations are caulked, Basketed, weather-stripped, or otherwise sealed.
2. Windows, doors, and skylights certified as meeting leakage requirements.
J. t1..omponent x -values cYi [1-ficctors labeled as certified.
4. Stair, elevator shaft vents, and other dampers inte,ral to the building envelope are equipped
ixrith mntnri.�a.d ,7.,.�.....___
fi 1[.4A 112V LV[]r
,�11�]yI J.
S. Cargo doors and loading dock doors are weather sealed_
. R ecesd I i tin t1x1rri
1 l rates and, scaled r as t or (ii)
i
hstalled ins de an
cqrri air -tight assembly with a 0.5inch clearance
with 3 inches Clearance from maul at i
tori al.
7 Buildinb entrance doors have a vestibule and equipped with closing devices.
� Exceptions:
j
Building enhances with revolving doors.
j
Doors that aper directly from a space less than 3000 sq. ft. in area.
CII'mate-Specific Requ semen is
ComD:onent
y'iv
roo
Roof I ,- All -Wood Joist/Raff er/Truss
Cornmentis:
Ftr'r Wall I Wood Frme, Any Spacing
Comments:
Win 1: Metal Frame.Double Pane with_
Tinted, SHGC 0.58
Comments:
Door I.- Glass, Tinted., 0.87
Floor 1:All-Wood
.t ;
Gross
Area
3539
623
Cavity
-Value
Cont.
Proposed Budget
R -Value `"actor U --F or
0.0
0.0
0.610
0.920
U.049
(a) budget U -factors are used for s-ofiware baseline calculations ONLY, and are not code requirernents.
Fn ve 1 o pe PAS S IES: Design 6 % better than code
S e cti an 4: C ompliance Statement
M 1.
0.520
0.520
0.040
The purposed envelope design represented in this document is consistent with the building plans, specifications and other
calculations submitted with this permit application. The proposed envelope system has been, designed to meet the 2003
IEC C rec�uire�ents in CQMcheck-EZ Version 3.0 Release 1 a and to comply with the mandatory requirements in the
Requirements Checklist.
Principal En�e�o�e Designer -Name
Signature
Envelope Compliance Certificate
2003 IECC
0600127
Farm Credit Services
C4Mcheck-EZ
Soffwaxe Veni.on
3.0 Release
2
Data filename:
SADrawin2s\305
Fame Credit
Serviccsl30S.cck
S ectian 1: Project information
ProJect Name. -
Design er/Confractor
cum n Author:
FARM CREDIT SERVICES
JRW & ASSOCIATES
RICHARD
Section 2,: General Information
Building Location (for weather data).-
Climate
ata):Climate Zone;
Heating Degree Days (base 55 degrees F):
Cooling Degree Days abase 65 degrees F):
Projed Type:
Window I Wall Ratio:
ildin� TvDe
Seefion 3-a Requirements Checklist
Itexbwrg, Idaho
ld
8693
143
New Construction
Checked BylDate
_U I n nr A
3400
Bldg. j
Dept, �
Use 1
� Air Leakage, C'om{ponent Certification, and Vapor Retarder Requirements
1. All joints and penetrations are caulked, gasketed, weather-stripped, or otherwise sealed.
� ] i 2. Windows, doors,, and skylights certified as meeting leakage requirements.
[ ] � 3- Component R -values & U -factors labeled as certified.
� ] j 4- Stair, elevator sha$ vents, and other dampers integral to the building envelope are equipped,
f with motorized dampers.
[ ] � 5. Cargo doors and loading dock doors are weather sealed.
[ ] � 6. Recessed fighting fixtures are: (i) Type IC rated and sealed or a�keted; or(ii)g installed inside an
J appropriate air -tight assc�nbly with a 0.5 inch clearance from combustible materials and
�
with 3 inches clearance frorn insulation material.
C � � 7. wilding entrance doors have a vestibule and equipped with closing devices.
� Exceptions:
� Building �ntxances with xevolving doors.
f Doors that open directly from a space :Fess than 3000 sq. It. in area„
Climate -Specific Requirements
onent Nan-ie/DesCn'-Dtio
Rao 1: All -Wood Joist/Rader/Truss
Exterior Wall 1: Wand Frame, Any Spacing
Window I: Metal Frame:Double Pane with Low -E
Tinted, SHGC 0.58
Door 1: Glass, Tinted, SHGC Q.87
Floor 1: All -Wood Joist/Truss
Gross
Area or Cavity dont. Proposed Budget
Perimeter R -Value RNalueU-F U -Factor
3400
38.0 0.0 0.02
3539
21.0 0.0 0.062
0.067
623
�-- --- 0.610
0.520
100
--- --- 0.920
0.520
3400
19.0 0.0 o.049
0.040
(a) Budget U-Ectors are used r soRware baseline calculations requJ
,nents.
ISai ve 1 o p e PASSES: Design 6°/fl better than code
Section 4: Complia][1ce Statement
The proposed envelope design represented in this document is �cvnsistent wi
calculations submitted with this pewit the building pans, specifications and other
�nmit application. The proposed envelope system has been designed to meet the 2003
IECC requirements in COMcheck-EZ Version 3.0 Release 2 and to comply with the mandatory requirements in the
Requirements Checklist.
Principal Envelope Designee -_Name
_AAAj
Date