HomeMy WebLinkAboutWELDING INSPECTION - 19-00723 - Mountain America Credit Union Office - Call CenterProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MACU Call Center
20023
Mountain America Credit Union
Elite Steel 09/10/20
Clear
9:00 AM
75
12:00 PM
I arrived on site and began my observations of the full penetration welds on the second floor framing at grid
lines 3:B-C. I observed the contractor prepare the area to be welded. I observed the contractor place the
root welds and clean the weld prior to adding the next pass. I observed that the welds appeared sound and
were free from visual inclusions and porosity. I notified the contractor of my observations prior to leaving.
Digitally signed by Jacob P Christensen
Date: 2020.09.17 08:35:59 -06'00'8129697
●
J. Christensen
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: