HomeMy WebLinkAboutSTEEL INSPECTION 2 - 19-00723 - Mountain America Credit Union Office - Call CenterProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MACU Call Center
20023
Big-D Constuction
Big-D 08/18/2020
Sunny
12:00 PM
77
2:00 PM
I arrived on the site at 12:00 PM. I observed that the contractor had completed wending the studs on the
west half of the decking. I observed that the studs were welded to the decking. I observed that all studs
were welded well with the exception of one that I showed to the site manager. He marked it and it will be
fixed. I observed that the work done was in general conformance with project documents.
William Moffat Digitally signed by William Moffat Date: 2020.08.19 07:42:07 -06'00'8129697
●
Deck Stud Weld
W. Moffat
Page 2 of 2