Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION - 19-00736 - The Grove at Thomson Farms PH2 - Linden - 30 Unit Bldg 7Inspection Date 04/30/2021 File Name 20001DFR04302021JPC Inspector's Signature Inspector's Name Jacob Christensen Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 04/30/2021 6c77d085ef10af70-1619802674467 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name The Grove Time Start 08:30 AM Client Stillwater Equity Partners Contractor Headwaters Construction Time End 10:30 AM Inspection Type(s) Epoxy Embeds/ Anchors Location(s) Linden Building Observations/ Remarks I arrived on site and began my observations for the HDU's at various locations (HDU5, HDU8) on the first floor. I observed that the contractor had cleaned out the holes with a wire brush and air. I observed the contractor use Hilti 200 and placed sufficient epoxy in each hole prior to placing the bolts with a twisting motion. I notified the contractor of my observations prior to leaving. Items observed are in general conformance with approved project documents and jurisdictional requirements.