Loading...
HomeMy WebLinkAbout20023-SI-09-24-2020 DFA sfProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: MACU Call Center 20023 Mountain America Credit Union Big-D 09-24-2020 Windy 10:30 AM 70 12:30 PM I arrived on site at approximately 10:30 AM. I observed that the contractor had rolled the parking lot area and was prepared to roll the water truck over it. I observed the ground deflection as the truck rolled over and observed that the ground was firm and unyielding. Digitally signed by Jacob P Christensen Date: 2020.09.25 21:38:35 -06'00' ● D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: