HomeMy WebLinkAbout20023-SI-08-28-2020 DFA sfProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: MACU Call Center 20023 Big-D Constuction Mill's Concrete 08-28-2020 Sunny 4:15 AM 45 8:30 AM ● ● I arrived on site at approximately 4:30 AM. I observed that the contractor had prepared the second floor for the concrete pour. I observed that there was rebar at each welding seam in the decking. I also observed that there was rebar around the perimeter of the inner part of the foundation walls. The mix contained micro fiber threads to add strength to it. I tested the first and sixth trucks and I stayed for the duration of the pour. The slump was slightly higher than the specifications for the sixth truck. I informed the contractor of these results and he decided to keep it anyway. Digitally signed by Jacob P Christensen Date: 2020.09.01 09:35:23 -06'00'8129697 ● Rebar and decking before pour Rebar and decking before pour D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: