Loading...
HomeMy WebLinkAbout20023-SI-06-01-2020 LC sfProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: MACU Call Center 20023 Mountain America Credit Union Mills Concrete 06/01/2020 Fair 5:30 AM 53 12:00 PM I arrived on site to observe the Concrete Reinforcement and the Concrete Placement. I went around the building starting on the nw corner and moved clockwise along the footings in order to observe the Concrete Reinforcement that the contractor had placed. I observed that the Concrete Reinforcement was in general accordance to project documents. I then proceeded to observe the Concrete Placement. I observed that the concrete was placed using a pump and that the contractor consolidated the concrete mechanically, using a vibrator. I observed that the Concrete Placement was in general accordance to project documents. Digitally signed by Jacob P Christensen Date: 2020.06.04 14:02:38 -06'00'8129697 Concrete Reinforcement. Concrete Placement. Mechanical consolidation using vibrator. L. Camarillo Page 2 of 2 Description: Description: Description: Description: Additional Comments: