Loading...
HomeMy WebLinkAbout20023-SI-5-12-2020 JPC sfProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: MACU Call Center 20023 Mountain America Credit Union Mountain Valley Construction 5/12/2020 P/ Cloudy 11:45 PM 63 2:15 PM I arrived on site to observe the bottom of excavation for the footings and foundation. After reviewing the Geotechnical Report by GSH I observed the contractor proof roll the material. I observed that the soil was firm and unyielding. The soil encountered at the bottom of excavation is a sandy gravel of natural deposits. I notified the contractor of my observations prior to leaving. Digitally signed by Jacob P Christensen Date: 2020.05.13 10:54:04 -06'00'8129697 J. Christensen I observed that the soil encountered at the bottom of excavation was in general conformance and acceptable with the conditions stated in the Geotechnical Report. Page 2 of 2 Description: Description: Description: Description: Additional Comments: