HomeMy WebLinkAbout20023-SI-5-12-2020 JPC sfProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MACU Call Center
20023
Mountain America Credit Union
Mountain Valley Construction 5/12/2020
P/ Cloudy
11:45 PM
63
2:15 PM
I arrived on site to observe the bottom of excavation for the footings and foundation. After reviewing the
Geotechnical Report by GSH I observed the contractor proof roll the material. I observed that the soil was
firm and unyielding. The soil encountered at the bottom of excavation is a sandy gravel of natural deposits.
I notified the contractor of my observations prior to leaving.
Digitally signed by Jacob P Christensen
Date: 2020.05.13 10:54:04 -06'00'8129697
J. Christensen
I observed that the soil encountered at the bottom of excavation was in general conformance and acceptable with the conditions stated in the Geotechnical Report.
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: