Loading...
HomeMy WebLinkAbout20023-SI-10-29-2020 DFA sfProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Inspected By: MACU Call Center 20023 Mountain America Credit Union Big-D 10/29/2020 Clear 7:30 AM 26 9:30 AM I arrived at the site and began my observations. I I tested the first truck and found the air content to be low. I informed the contractor and the truck driver and adjustments were made. I tested the result and found it to be within project specifications. D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: