HomeMy WebLinkAbout20023-SI-10-29-2020 DFA sfProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
Inspected By:
MACU Call Center
20023
Mountain America Credit Union
Big-D 10/29/2020
Clear
7:30 AM
26
9:30 AM
I arrived at the site and began my observations. I I tested the first truck and found the air content to be low.
I informed the contractor and the truck driver and adjustments were made. I tested the result and found it to
be within project specifications.
D. Aust
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: