Loading...
HomeMy WebLinkAbout20023-SI-10-28-20 JMD sfProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: MACU Call Center 20023 Mountain America Credit Union Big-D, Mills Concrete 10/28/20 Sunny 11:00 AM 40 2:30 PM ● ● I arrived on site and began my observation of the steel reinforcement placed for the driveway entrance slab on the south side of the project connecting to main street. I observed that the steel had been placed within general conformance to project guidelines. I remained on the site to observe the concrete placement and I informed the contractor of my observations and test results before leaving the site. Digitally signed by Jacob P Christensen Date: 2020.10.29 15:45:37 -06'00'60666 ● J. Denton Page 2 of 2 Description: Description: Description: Description: Additional Comments: