HomeMy WebLinkAbout20023-SI-10-28-20 JMD sfProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MACU Call Center
20023
Mountain America Credit Union
Big-D, Mills Concrete 10/28/20
Sunny
11:00 AM
40
2:30 PM
●
●
I arrived on site and began my observation of the steel reinforcement placed for the driveway entrance slab
on the south side of the project connecting to main street. I observed that the steel had been placed within
general conformance to project guidelines. I remained on the site to observe the concrete placement and I
informed the contractor of my observations and test results before leaving the site.
Digitally signed by Jacob P Christensen
Date: 2020.10.29 15:45:37 -06'00'60666
●
J. Denton
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: