HomeMy WebLinkAbout20023-SI-10-22-2020 DFA sfProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MACU Call Center
20023
Mountain America Credit Union
Big-D 10/22/2020
Clear
7:00 AM
26
9:15 PM
●
●
I arrived on site at approximately 7:45 AM. I observed that the contractor had prepared concrete forms in
general conformance with project documents. I tested the concrete when it arrived and found that the air
content was low. I informed the general contractor as well as the concrete truck driver. The driver added
more air and the results of the second test were within project specifications.
Digitally signed by Jacob P Christensen
Date: 2020.10.26 13:55:56 -06'00'8129697
●