Loading...
HomeMy WebLinkAbout20023-SI-10-22-2020 DFA sfProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: MACU Call Center 20023 Mountain America Credit Union Big-D 10/22/2020 Clear 7:00 AM 26 9:15 PM ● ● I arrived on site at approximately 7:45 AM. I observed that the contractor had prepared concrete forms in general conformance with project documents. I tested the concrete when it arrived and found that the air content was low. I informed the general contractor as well as the concrete truck driver. The driver added more air and the results of the second test were within project specifications. Digitally signed by Jacob P Christensen Date: 2020.10.26 13:55:56 -06'00'8129697 ● Page 2 of 2 Description: Description: Description: Description: Additional Comments: