HomeMy WebLinkAbout20023-SI-10-14-2020 DFA sfProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MACU Call Center
20023
Mountain America Credit Union
Big-D 10/14/2020
Clear
10:30 AM
40
12:30 PM
●
●
I arrived on site at approximately 10:45 AM. I observed the contractor preparing the site and prepping a
curb machine. I waited for an hour and the contractor informed me that they had canceled the pour due to
their equipment malfunctioning.