Loading...
HomeMy WebLinkAbout20023-SI-10-14-2020 DFA sfProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: MACU Call Center 20023 Mountain America Credit Union Big-D 10/14/2020 Clear 10:30 AM 40 12:30 PM ● ● I arrived on site at approximately 10:45 AM. I observed the contractor preparing the site and prepping a curb machine. I waited for an hour and the contractor informed me that they had canceled the pour due to their equipment malfunctioning. Digitally signed by Jacob P Christensen Date: 2020.10.22 10:26:45 -06'00'8129697 ● D. AUST Page 2 of 2 Description: Description: Description: Description: Additional Comments: