Loading...
HomeMy WebLinkAbout20023-SI-10-13-2020 DFA sfProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: MACU Call Center 20023 Mountain America Credit Union Big-D 10/13/2020 Clear 7:30 AM 50 9:30 AM ● I arrived on site and began my observation of the Concrete Placement for curb at the Southeast side of the parking lot. I performed ACI tests and observed that the concrete was in general conformance to project documents. I Informed the contractor and supplier of the results. I observed the contractor consolidate the concrete by means of a mechanical vibrator. I observed for the duration of the pour. Digitally signed by Jacob P Christensen Date: 2020.10.14 20:20:12 -06'00'8129697 ● D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: