Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MACU Call Center
20023
Mountain America Credit Union
Big-D 10/13/2020
Clear
7:30 AM
50
9:30 AM
●
I arrived on site and began my observation of the Concrete Placement for curb at the Southeast side of the
parking lot.
I performed ACI tests and observed that the concrete was in general conformance to project documents. I
Informed the contractor and supplier of the results. I observed the contractor consolidate the concrete by
means of a mechanical vibrator.
I observed for the duration of the pour.
Digitally signed by Jacob P Christensen
Date: 2020.10.14 20:20:12 -06'00'8129697
●
D. Aust
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: