Loading...
HomeMy WebLinkAbout20023-C-08-28-2020 DFA 2 of 2 sfProject Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл 4,447 psi MACU Call Center Mountain America Credit Union 1421 20023 17055 60 of 100 Yards MP 322 D. Aust 08/28/2020 7:00 AM 5 0.8 70 50 283A 283E 283C 283B 283D 4 4 4 4 09/04/20 09/25/20 09/25/20 09/25/20 40,215 55,850 55,595 56,265 24,0003,199 4,443 4,422 4,476 Digitally signed by Jacob P Christensen Date: 2020.09.26 16:13:21 -06'00' 12.57 Walter's Ready Mix Second floor slab 7 28 28 28 H 12.57 12.57 12.57 141 2 of 2 08/29/2020 1 2 2