Loading...
HomeMy WebLinkAbout20023-C-06-24-2020 LC 3 of 4 sfProject Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл 4,076 psi MACU Call Center Mills Concrete 192F MACU 20023 15042 10 cy (110 cy /208 cy) MP 322, MA AE 90 L. Camarillo 06-24-2020 6:40 AM 6 5.4 68.7 53.9 24 47 153A 153E 153C 153B 153D 4 4 4 4 07/01/20 07/22/20 07/22/20 07/22/20 42,505 51,225 51,555 50,945 53,5003,381 4,075 4,101 4,052 Digitally signed by Jacob P Christensen Date: 2020.07.22 09:40:40 -06'00' 12.57 Walters Ready Mix, Inc Building walls (near se wall corner) for first floor. 7 28 28 28 H 12.57 12.57 12.57 NA 3 of 4 S. Edwards 06/25/2020 5 5 5