Loading...
HomeMy WebLinkAbout20023-C-06-24-2020 FP 2 of 4 sfProject Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл 5,037 psi MACU Call Center Mills Concrete 192F MACU 20023 15046 60 of 208 yards MP 322, MA AE 90 F. Pelton 06-24-2020, 6:00 AM 3.75 6 68.5 52 24 47 150A 150E 150C 150B 150D 4 4 4 4 07/01/20 07/22/20 07/22/20 07/22/20 07/22/20 46,075 66,470 62,325 61,145 53,5003,665 5,287 4,958 4,864 Digitally signed by Jacob P Christensen Date: 2020.07.22 09:31:11 -06'00' 12.57 Walters Ready Mix Western Exterior wall 7 28 28 28 H 12.57 12.57 12.57 Cylinders are located on Eastern Fence near the crane. 2 S. Edwards 06/25/2020 5 5 5