COMcheck Software Version 3.5.2
Envelope Com
2nns 11=t^_�
Report Date: 01/17/08
Data filename: C:\Program Files\Check\COMcheck\Eclipse Marketing bldg.-mk
Section 1: Project Information
Project Type: New Construction
Project Title : Eclipse Marketing Inc.
Construction Site:
305 West Main
Rexburg, ID 83440
Owner/Agent:
Section 2: General Information
Building Location (for weather data): Rexburg, Idaho
Climate Zone: 16
Heating Degree Days (base 65 degrees F): 8693
Cooling Degree Days (base 65 degrees F): 143
Building -Type,
Office
Section 3: Requirements Checklist
Climate -Specific Requirements:
Component Name/Description
Floor Area
3840
0700555
Eclipse Marketing
Designer/Contractor:
Gross Area Cavity Cont. Proposed Budget
or Perimeter R-Value R-Value U-Factor U-Factor
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
Air Leakage, Component Certification, and Vapor Retarder Requirements:
Lj 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor-penneable wrapping material installed in accordance
with the manufacturer's installation instructions.
2. Windows, doors, and skylights certified as meeting leakage requirements.
O 3. Component R-values & U-factors labeled as certified.
4. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that
achieves the rated R-value without compressing the insulation.
O 5. Stair, elevator shaft vents, and other dampers integral to the building envelope are equipped with motorized dampers.
6. Cargo doors and loading dock doors are weather sealed.
T Recessed lighting fixtures are: (1) Type IC rated and sealed or gasketed; or (it) installed inside an appropriate air -tight assembly with a
0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material.
O 8. Building entrance doors have a vestibule and equipped with closing devices.
Exceptions:
Building entrances with revolving doors.
Doors that open directly from a space less than 3000 sq. ft. in area.
O 9. Vapor retarder installed.
Project Title: Eclipse Marketing Inc.
Data filename: C:\Program Files\Check\COMcheck\Eclipse Marketing bldg..cck
p EC EE WE
E
17 2008 D
CITY OF REX 40f
/08
COMcheck Software Version 3.5.2
Interior Lighting Compliance
Certificate
2003 IECC
Report Date: 01/17/08
Data filename: C:\Program Files\Check\COMcheck\Eclipse Marketing bldg..cek
Section 1: Project Information
Project Type: New Construction
Project Titte : Eclipse Marketing Inc.
Construction Site:
305 West Main
Rexburg, ID 83440
Owner/Agent:
Section 2: General Information
Building Use Description by:
Building Tvoe Floor Area
Office 3840
Section 3: Requirements Checklist
Interior Lighting:
1. Total proposed watts must be less than or equal to total allowed watts.
Allowed Watts Proposed Watts Complies
3840 3714 YES
O 2. Exit signs 5 Watts or less per side.
Designer/Contractor:
Exterior Lighting:
O 3. Efficacy greater than 45 lumens/W.
Exceptions:
Specialized lighting highlighting features of historic buildings; signage; safety or security lighting; low -voltage landscape lighting.
Controls, Switching, and Wiring:
4. Independent controls for each space (switch/occupancy sensor).
Exceptions:
Areas designated as security or emergency areas that must be continuously illuminated.
Lighting in stairways or corridors that are elements of the means of egress.
O 5. Master switch at entry to hotel motel guest room.
O 6. Individual dwelling units separately metered.
O 7. Each space provided with a manual control to provide uniform light reduction by at least 50 % .
Exceptions:
Only one luminaire in space;
An occupant -sensing device controls the area;
The area is a corridor, storeroom, restroom, public lobby or guest room;
Areas that use less than 0.6 Watts/sq.ft.
8. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft.
Exceptions:
Areas with only one luminaire, corridors, storerooms, restrooms, or public lobbies.
Project Title: Eclipse Marketing Inc. Report date: 01/17/08
Data filename: C:\Program Files\Check\COMcheck\Eclipse Marketing bldg..cck Page 2 of 6
9. PhotocelVastronomical time switc' exterior lights.
Exceptions: *Sv�
Lighting Intended for 24 hour use.
10.Tandem wired one4emp and three -lamp ballasted luminaires (No single -lamp ballasts).
Exceptions. -
Electronic high -frequency ballasts; Luminaires on emergency circuits or with no available pair.
Section 4: Compliance Statement
Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and
other calculations submitted with this permit application. The proposed Lighting system has been designed to meet the 2003 IECC, Chapter 8,
requirements In COMcheck Version 3.5.2 and to comply with the mandatory requirements in the Requirements Checklist.
Name - Title
Signature Date
Project Title: Eclipse Marketing Inc. Report date: 01/17/08
Data filename: C:1Program FileslCheWCOMchedclEc fipse Marketing bldg..cck Page 3 of 6
Imw `.
COMcheck Software Version 3.5.2
Interior Lighting Application
Worksheet
2003 IECC
Report Date:
Data filename: C:1Progmm Files\Check\COMcheck\Eclipse Marketing bldg..cck
Section 1: Allowed Lighting Power Calculation
A B C D
Floor Area Allowed Allowed Watts
Watts 1 ft2
Office 3840 1 3840
Total Allowed Watts = 3840
Section 2: Proposed Lighting Power Calculation
A
B
C
D
E
Fixture ID : Description / Lamp I Wattage Per Lamp / Ballast
Lamps/
# of
Fixture
(C X D)
Fixture
Fixtures
Watt.
Office (3840 sq.ft.)
Incandescent 1: recessed cans / Incandescent 65W
1
48
65
3120
Compact Fluorescent 1: surface mount / Twin Tube 40W / Electronic
2
9
40
360
Compact Fluorescent 2: surface mount / Spiral 13W / Electronic
2
18
13
234
Total Proposed Watts =
3714
Section 3: Compliance Calculation
If the Total Allowed Watts minus the Total Proposed Watts is greater than or equal to zero, the building complies.
Total Allowed Watts = 3840
Total Proposed Watts = 3714
Project Compliance = 126
Project Trtie: Eclipse Marketing Inc. Report date:01/17/08
Data filename: C:\Progmm Files\CheddCOMcheck\Eclipse Marketing bldg..cck Page 4 of 6
COMcheck Software Version 3.5.2
Mechanical Compliance Certificate
2003 IECC
Report Date: 01/17/08
Data filename: C:\Program Files\Check\COMcheck\Eclipse Marketing bldg..cck
Section 1: Project Information
Project Type: New Construction
Project Title : Eciipse Marketing Inc.
Construction Site:
305 West Main
Rexburg, ID 83"0
Owner/Agent:
Section 2: General Information
Building Location (for weather data): Rexburg, Idaho
Climate Zone: 16
Heating Degree Days (base 65 degrees F): 8693
Cooling Degree Days (base 65 degrees F): 143
Section 3: Mechanical Systems List
Quantity System Type & Description
Section 4: Requirements Checklist
Designer/Contractor:
Project Title: Eclipse Marketing Inc. Report date: 01/17/08
Data filename: C:\Progmm Files\Check\COMcheck\Eclipse Marketing bldg..cck Page 5 of 6
COMcheck Software Version 3.5.2
Mechanical Requirements
Description
2003 IECC
Report Date:
Data filename: C:\Program Files\Check\COMcheck\Eclipse Marketing bldg..cck
Project Tale: Eclipse Marketing Inc. Report date: 01/17/08
Data filename: C:\Program Files\Check1COMcheck\Ecipse Marketing bidg..cck Page 6 of 6