HomeMy WebLinkAboutRESCHECK - 07-00466 - Snellgrove Townhomes - Bldg #1, 4 UnitsSep
t
25 007 P
L
REScheck SOftware Version 4.f.1
Compli��nce Certificate
Project Title,-. :Snell rove Town Ham�S
Report Date: 091251p7
Data €if5�narne; C.1Pmgrarn FileslChedciREScheck�,Sneilgrove.rck
En C*dG
Lcadrx
Construction Tom;
Gazing Area Percentage
Healing Degree Days=
Cotru tion Site:
345 W. Main t"
amu, } ID
2003 ICC
Rexburg, Idahv
MU111#arrilly
15%
8693
Owner/Agent;
Woodshed PrOPOrties LL
Ida ho Fees, 3 ICS
t
seven Snell
Kda Developing
3784 E 1 1
b,, ID
d'O 1: VMYJ Fra: Dub Pang Low
a T' y
Door : Sorg
Wall d Frame, 1 ', O y c,
Wd Oar . Vinyl Fra rrie ; D able Pane with Low -F=
Basemen Wall I
heightWall
Depth below grade; 7.01
Insuladon depth: &;.
2:353 19.0 84
364 D-320 110
160 116
2008 45
310 -132D 99
2016 11.0 .
E � ck' ' r- .1 +1 ani' to mrn has n des rigid to meet 1 h
t r n 'at require meats listed in ttChecKi
Nie - Title
Pie Thle 0811
Data 'ff)8n&Me-- CAPragram Fffes�C s
Skgna#urq Date
nE�EC-�E
D
Page 1 of 4
Repot date; Cq(25jO7,
it
Sep
A
25 200 - .p iJ
- A S E R 3 E T
Dc'wde,1F, 09/25/07
Callings:
R
REScheckSoftware Version 4. 1. 1
inspectiion Checklist
CJ C e Irl n g I.- Flat Rin g o r S cl S 5 or Tr i s }
o mmants:
Above- r cl[ G Walls:
C3 Wal 1: %Vcc>d Frame, 16" O_ -1 9 _0 e
omrnt-
LJ Wall : Wood Frame, 1 ew o. C., .0 cavity
Ccmnts;
13866meni Wall Is-.
Ll iBasemsnt Wall 1: Solid Concrete or Masonry, 8.01 ht I T. -GE bg / 8.01 insul, R-1 1.0 cavity insulation
C rn en : -�
Windows:
Ll Window 1; Vinyl Frame:Double Pan a with-
For Wridows without lab l -factors. descdbe
ft urs
CorinerF
Win ow .- Vinyl Frame: Dcuble Pane
For Wndcws mahout labeled U -factors, d
Comments:
D.
J Door `olid, U -factor: 0,280
Air Leakage:
L] Jdrlts, pe n e# tions, and all other such o g •
r� are Sourms
� ire � �� ���jthatLj 6 CBS Sa d lights are T fnsidean o air l �9 a+ .
bl mat rl , If n -uresaret'B air -tight assembly Wth a -5w dearanm f
rom
ills,ulaii0n, -
Skylights:
Vapor. Rotarder
0 1 nista rl ed a n the Wa rm. In-vA Me r sly e of a 11 no n-,%
Materials Id'Britib CaUnna-
rl
Matan' l and � .
'Parent are idea d so that Co l"
anca can ba determin&d.
MaAuFacturer rnanuals for all installed
rrd cucling equipment and s3rylVater heating
"'Su)@tion R- lue's E2n'! 1 n ors areInsulation is ,' �havet n r Id d..
early marked ars the kfildin plans or specincatlans,
Installed accordirg to marfu'fa =re r"s instrudons, in Substantial comact nth
manner that hxe a the rated .--value th ui- �� � �r� ire ��� �fN and fry a
Pf'Oiad TiHO'q Snellgrove Town Homos
_ 2 the insulation ,
Data filerame-C:lPrOgram check%ESchcicAn ell r. r f
port dam: 09125/07
r
Sep 25 2007 2: SOPM [AR—A-ASERJET FAX
}
Duct Insulation*
CJ uPP (Y dui in unconditianed atlics or outsa
Ej .tures ducts= the building are 1 ns uda led to R- 11
�, ��iieAos or
Vide the bLX'1d!rg are insulated t
Lj S Lipp I y dui fn un d1ti o no d s Pacesare I ns L%
Retum ducts hi unconditioned spaces (except basernents) are insWated to
+int cn Is not ru«d on return dui in
Ll ire extfor waHs iare used as pjqnLjms, the vvaH is Iris
int to .I. -i I
Duct tru i n
L] WO connec4lons to flanges f air distributivi E,�ystsm equiprnerit are sealed and
L:j AJI JoInts, seams
i rl�h welds, 8k, tI(adhesives).
or tapes. Tapes and mastics ars � �� - �f
Gonflnuously welded and lock1r; g -type longitudinal joint& and searns 3n ducts operating at less 1ha n 2 in. w.g. 590 pa).
The HVAC system provides a means for balarcing air and water systerns.
Ll ThOrmOstats exist fbr each dwelling unit (non -dwelling arlaas
atd0n-nfic means to pattally rastClct or shut off the heatiN andior woling Input to each roorn is rcvide!204
must " One thOrmcsfat for #rn or zone).
A Manual or
Efeefric systems -
E3 SOParate e1OCtdOet'r t fOf each r llin
r
Saco Fater Heating; J
Cj Water heaters with % rticaa n t t n c# h inlet and outlet unl the
p r I Part r circulating ar rrr r feat
I Pm l tin g hot water p i pes @r !nSU I ted to the Je
Circulating tjr
Lj C inti n g it water p
ipe-s anainsulated to thelevels in Table 1.
Swimming Pools.*
�
All 1heated swjmm-ingpocis have n on/off heater it
c;h and a mvBr unless over 20 % of the OL' -' PQ PUMPS have a timeClock no 1
i
HGaling and Cooling Piping Insulation,
F or chilled fluids below 55 idegn3les F are rn til
aW to the levels In Table 20
Pmjed TItle . mA rovia Town Hornes
Data f�farm C:\PrO9raM File � e(*1RE
Page 3 of 4
Repart data: 0912&07
p.3
Sep 2S 2007
i O O ■ ■ i HP ASERJET
FAX
Table 7: Minimurn Insularjor, Thickness for Circ jating H'Q� Water Pipes
Insulation Thickness In Inches by Pipe sjtes
��Heated Water mmmmh� n. and RunOULtS
�T� re up 1-p 1.25#1 � " to 2.3 Over 2"'
140-1 1. '0
100-1391.0 t0,5
0.5 0.5 1,
Tablo 2: Minimum Insulation Thickness for HVAC Pi
pes
PlOng SyVetn Typn Fluid Temp.,
H %at in g Systa rns PkatVa(9F)
Low PressuirefTemperature 201-250
Low Temperature 106-200
Steam Condensate (for f d water)
Cooling SWerns
Chilled Water, 1 efr glarent and
Brine Below 40
COTES TO FIELD; (Building Department t1sa only)
Insulation ThIckneu in Inclhes
2' Runouts I" and Lgsr,,
Pipe sizes
1.25' .0" Z51F to 4'1
Prclect Tftle rJ r v Tc)n Home
Dai Manama: C; r rn Fil � lhc
Rage of
RePOJI date:
p. 4
1-0
1.0
1.5
}
0.75
Prclect Tftle rJ r v Tc)n Home
Dai Manama: C; r rn Fil � lhc
Rage of
RePOJI date:
p. 4