Loading...
HomeMy WebLinkAboutCOMCHECK - 07-00458 - Interwest Cabinets - Storage BuildingET 2003 IECC Report Date: 10/18I07 Generated by COMcheckmWeb Software Envelope Compliance Certificate Section 1: Pro'aect infa�rnation Project Title* Interwest Cabinet Stogie Construction Site: 64 S 3 rd Rexburg Idaho 83440 Owner/Agent: SerCt*on 2: General Info ation Building Lotion (for weather data): Climate Zone: Heating Degree Days (base 65 degrees F)-- Cooling :Cooling Degree gays (base 65 degrees F): Project Type: VerUcal Glazing I Wall Area. Pet.: Store, Industrial and Commercial eu r, Idaho 1 $693 143 New Construction 1% Section 3: Requirements Checklist 07 00458 Interwest Cabi net Designer/Contriactor: Climate -Specific Requirements: Component lame/Description Gross Area r Perimeter Cavity R Value Com -rus Proposed tJ*F:nr Budget 11. C 0%r KOOt :Metal, with Thermalre Ext. Wall 1: Metal Wall w/o Thermal BWks 6840 32.0. 25.0 0.022 0.047 Door 1, Overhead 40 0.101 0.520 Door 2-q Solid 592 0.125 0.112 40 0.225 0.112 l` it l Concrete Floor (over uncondifloned space %'� 6840 �� 1 . r Ll 0 .040 8 uaget U-taCtorSrare used for software baseline Calculations ONLY, and are not wde requirements. �p{ Air Leakage, Componont Certification, 1 - All joints accordance Wth the manufacturers installation instructions. . Windows, yrs, and skylights certified as meeting i requirements. LJ _ Component -value & U-tatctorz labeled as cued, . i ns elation in stalled accord'i ng to manufactu reel In structionsin s ubstandal contact with the su rface r� � r�� � r'"r ria n n r that the rated -value t tcompressing the rr Mori 5 - Stair, elevator shaft vents, and other dampers integral to the building envelope are equipped Mth motorized dampers. . Cargo doors and loading dock doors are weather sealed. El 7, Recessed lighfi ng fixtures are - (1) Type I C rated a nd sea led or ge s td ' o r(fl)r� � l f r in pprop�t �r� art a srb l with . in clearance fromcombustiblematerials an with inches lrnfrom insultjon material. 8. Building entrance doors have a vestibule n equipped with closing devices. i Exceptions.- Interwest Cabinet at Storage Page 1 f Building entrances with reVOP . ioors. Doors that open directly from a space less than 3000 sq. ft. in. area. . (j . Vapor retarder installed. Section 4: Compliancy Statement representedCOMPMance Statement The proposed envelope design ument is consistent wfth the buildingdin, specifications and other calculations submitted wvith thispermit application. The proposed envelope system h as been desig d to meet the 2003 IECC ;requi rets i Web and to comply with the mandatory requirements in the ire quirements Ch,,kn,,e,t. 1*4 It / z Name - Title Interwest Cabinet Storage l . 't'&P OW -71/9 .10 rf� Page 7 2003 IECC Report Date: 10/18/07 FMO a vienerated by COMcheck=Web Software Mechanical Compliance Certificate Section 1: Project Information Project Tile: In#erwest Cabinet Storage ConstmictionSite: 648 3 rd W Rexburg , Idaho 83440 Owner/Agent: Section 2.* General Information Bij it r� Lotion (for weather data): F r , Idaho Climate Zone: 1 Heating Degree Luys (bass 65 deg8693 Cooling Degree Days (base 65, degrees : 143 Project Type: New Construction Section 3: Mechanical Systems List QUAMWS e T & Do ion 2 HVAC System 1: Heating; Unit Heater, Gas Sectgo ion 4: Requirements Checklist Designer/Co. dpa%ct Requirements Specific To: HVAC System 1 ; j 1. Equipment minimum efficiency: Unit Heater (Gas): 80% Ec Generic Requirementss- Must be met by al! systems to which the requirement is applicable; Q 1. load calculations per 2401 ASHRAE Fundamentals Ll 2. Plat equipment and system capacity no greater than needed to meet loads E tie : Standby equipment automatically off when primary system Exception: Muffiple units cOntrdled to sequence operation as a funcfion Lj . Minimum one temperature control device per system Minimum one humidity control device per installed humidifi t • on system . Automatic Controls: Setback to 55 degrees l(heat);and85- + F(cool � �� ��� � pan ear backup a'our Exception: nt nu l operating zones Exception: 2 kW demand or less, submit calculations Ll 6T Outside -air source for venni tin, system capableof reducing OSA to requiFed min imum 13 7. Hot ter pipe insulation: I in. for pig � 1 .5 in. and 2 in. for pipeserant/br• ne pipe insulation: I in, for peg <=1.5 in. and 1.5 in. for pipes 1 in. Steam pipe i nsu late n: 1.5 in. forpipes peg 1 • in. and 3 i. for pi>1.5 i. Exception.* Piping within HVAC equipment Exception: Fluid temperatures between 55 and 105 degrees F Exception: Fluid not heated or Woled Exception.- Runouts <4 ft in length LJ . Operafion and maintenance manual provided to building owner Inter e t Cabinet Storage page 6 of 9 3 1-1 U. Stair and elevator shaft vents arf Pped dh motored dampers Section 5: COmPHance Statement C=Pfiance Statement: The proposed mechanical design represented in this document is Wnsistent with the building plans, sPeCifiCations and other calculafions submitted with this permit applicaton. The proposed mechanical sYstems have been designed to meet the 2003 IECC requirements in COMcheckWeb and to compty wM the mandates requirements i the Requirements �,M3 'r '0 � I ntrt Cabinet Storage Pegs of 9 D Generated by COMcheckinWeb Software Mechanical Requirements Description 2003 IECC Report Date: The following list provides more detailed descriptions of the requirements in Section 4 of the Mechan�cal Campliar�ce Certificate. Requirements Specific To: HVAC System I f 1. The specified heabng and/or coolxn.iapt is efficiency: Unit Heater (Gas): 0% Ec re Genedc RequIrements: Must be met by all SYStems to Wh"Ch the quirement is applIcable: 1 _ Design heating and lira loads for the building must be determined ui procedures in the ASHRAE Handbook of Fundamentals . All equipment and systems must be sized to be no greaterni d et calculated [oads. re piece equipment Providing heating and c*o l� must �i � this rision frMfunction the opacity for the other function a small a s possible, within walla I equipment options. Exception: The equipment and/or system capacity may be greater thanai �ti a nt must �� loads for s purposes. automatically ll i led to a off when the primary equipment acrd/or system erar- ILP Exoeptien : Multiple unfts of the same equipment type whose i nd- paitlas exceed the calculated load are allowedif they are provided with controls to sequence operation of the units as the lead increases or decreases, . Each heating or cooling system se rvi n a sin& zone must have its own temperature oontrol dei, . Each humidificabon system est have fts own humidity control device. } The system or zona control must be a programmable thermostat or other� au omatrcontrol meeting the following ritoria:capable of setfing back temperature to 55 degrees F dn*ng. heating and setUng UP to 85 es F during coolingb)Gapable of autornaail setting back or shutting down systems during unoccupied hours using different day schedulesc)have as accessible -hour owupant oerrided ) have a battery back-up a b ie of maintaining pm9rammed settings for at last 10 hourswithout power. Exception: setback or shutoff contmi is not required ori thermostats that control s sta senang areas that operate cetion r A setbackr shutoff o I is not required On SYStems . The to rest supply outside ventilation air- as required by Chapter 4 of the international Mechanical bode. If the ventilation system is designed to supply outdoor -air quantities exceeding minimum required levels,, the system must be capable of reducing But a =air flew to the minimum required levels, . Allxa s Berring space -conditioning SYStest mus be insulated as follows: Hot water �.piping in for h a n systems- 1 in. . forpipes� 1�-i oriel d�aetet i, for as 1 /�r. nominal diameter. Chilled water, refrigerant, and brine p1pi'n'g systems: ; I in Finsula�o for pipes �� �����. nominal dtareter 1 1� f insulation u tion for�es 1 1/ -ie_ no i # diameter. tea piping.,,. 1 1/2 i.inuion forpipes =1 1 12 -in. nominal diameter 3 in. insulation for pipes >1 1/24n. nominal diameter. Exception: Pipe insulation is not required for facto instarlledi in within ithin I" -I' equipment. Ston; pipe insulation is not required for piping that conveys fluids having a design operating tapeWre ran-ge between 55 degrees IF and 1degrees F ` t«: Pipe insulation is not required fori i� that conveys fluids ds that have netbeen heated or cooled through the use of fossil fuels or electric power. , ori: Pipe insul.tion is not required for runout i� not F valve and iii coil. p exceeding �g r� ��� and � � �. r � �i�aate r between the octroi . Operation and maintenance documentation ut be provided to theowner that includes n#udas at least the following inforrrrationa. e ui entani p (input ars d output) and required maintenance aios equipment ope.ration and r a i ntanaroemanua'ISC) HVAC maintenance ad calibratioil informavon , including wirid tarF sus e�gos desired or feid- �detasat points must be permanentlyrecorded on COnW drais r at control devices, or, for d ilital control systems,11ri programming Comment d complete narrative of how eachto } � is �ntertded to operate. 9. Stair and elevator shaft ventsm u st be equipped with motorized dam ppawcapable of being automatically ��d during normalbuilding operation and interlocked to open as required by, fire and smoke defe cfion system s . All gravity outdoor airsupply andeaust hoods, vents, and ventilators must e equipped with motorized dampers that will automaticallyu t eek are not in use. o� Gravity � e spaces � on- otorazed dampers are acceptable in buildings less than for above dei - 'antic systems s�;in urs a storiesin herl�t conditioned spaces. I test Cabinet Storage Fuge 8 of t �2003 IECC Report Date: 10/18/07 Generated by COMcheckswWeb Software Lighting Compliance Certificate Section. I o, Project -informatioIF Project Tide: Interwest Cabinet Storage Construction Site: 64 S 3 rd W Rexburg + Idaho 830 Owner/Agent Section 2: General Information Building Use Descdpfion by: Project Type: New Construction Storage,, Industrial and Commercial Section 3; Requirements Checklist nterior Lighting-, I , T'Ota1 actual v+ tt :must be less than or equal to total allowed watts.. Allowed Waw Actual Waft Cornplies 5472 704 YES EA signs 5 Watts or less per side.. ExteriorLighting.. . Efficacy greater than 45 lumens/W. Exceptions: Interwest Cabinet Designer/Contractor: ELE I Ir V F_VU I Specialized lighting ihllhtl n features f historic i l l n;si� ; � � eft r � I�I�t�, ��r�� landscape lighting, u rel, Sidi Wiring: i1 . In n t controls acspaExc# (_Switch/occupanry sensor). Areas I hated as security or emergency afeas that must be continuously illuminated.r l ig Inti ng in Stairways or cOrridors that are elements f the means of egress. t t amy to hotelimotel guest room. • uaWwelfing units separately metered, 7. Each space PrOVided with a manual tencOntrol to Provide uniform light mdueflon by at least %. Exceptions Only one luminaire in space; An Gem pant -seising device controls the area; The area is a corridor, storeroom, reStroom, pubhe lobby or guest r00M L Areas that use less than 0.6 Wtt.. - FOMa C fighting shutoff control in buildingslarger than 5,000 sq.ft, U� 9. Photocell/astronomicai time switch on exterior lights. Exception. s-- Interwest Cabinet Storage r 1P 0 L; 0 LC F H'r"' F Page 3 of A{ Uig Ming intended for 24 hour u . IO.Tandem wired one -ramp and three -lamp baBa to luminaires Exceptions: �� w &le�ni high-frequencyballasts; Lu gr Section 4: Compliance Statement representedCompliance Statement: The proposed lighting design int jconsistent with the buildingplans,pitin and other calculations submitted Wththis permit application. The proposed fighting a t Mquirements in i eC-Web and to Qomplythe a to requirements l Name - Title -- I ntet Cabinet Storage at r quirnt hiit. a g d 1W 2003 IECC Report Date: 111111111 hting Application Worksheet Section 7: Allowed Lighting Power Calculation B Floor Area Allowed Allowed Waw Waw i ftz Storage, industrial a Commercial 6840 0.8 .5472 iffy Total Allowed Watts 5472 Section 2: Actual Lighting Power Calculation D r= Future ILS : Description I Lamp I Wade Per Lamp I Ballast Lamps/ # of Fixture Fixture Fixtures Watt. Linear Fluorescent 1; 48 12. T (Super T8) / Electronic Total Actual Watts = 704 Section 3: Compliance Calculafibn If thO Toll Mlowed Wafts minus te TOtal Actual Watts is greater Ma r , the building complies. Total Allowed Watts 5472 Total Aral Waw 704 Project Compliance 4768 Interwast Cabinet Storage Page 5 of