HomeMy WebLinkAboutCONCRETE TEST 16 - The Grove at Thomson FarmsInspection Date
04/27/2021
File Name
20001C04272021PG
Inspector's Signature Inspector's Name
Peter Glanzer
Reviewer's Signature Reviewer's Name
E. Vail
Reviewed Date
04/27/2021
F6886B78-E419-4353-9C1E-1739B50D760F 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name
The Grove
Time Start
10:15 AM
Client
Stillwater Equity Partners
Contractor
Headwaters Construction co
Time End
10:15 AM
Inspection Type(s)
Concrete Placement
Location(s)
South west corner of building 8
Cylinders are by the first four storage containers
on you right on the road
Observations/ Remarks
Slump failed the first time with a 3.5 then they added water for a slump of 6 and 1/4
Weather was great
Items observed are in general conformance with approved project documents and jurisdictional requirements.