Loading...
HomeMy WebLinkAboutCONCRETE TEST 16 - The Grove at Thomson FarmsInspection Date 04/27/2021 File Name 20001C04272021PG Inspector's Signature Inspector's Name Peter Glanzer Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 04/27/2021 F6886B78-E419-4353-9C1E-1739B50D760F 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name The Grove Time Start 10:15 AM Client Stillwater Equity Partners Contractor Headwaters Construction co Time End 10:15 AM Inspection Type(s) Concrete Placement Location(s) South west corner of building 8 Cylinders are by the first four storage containers on you right on the road Observations/ Remarks Slump failed the first time with a 3.5 then they added water for a slump of 6 and 1/4 Weather was great Items observed are in general conformance with approved project documents and jurisdictional requirements.