HomeMy WebLinkAboutCOMCHECK - 07-00406 - Gymnastics Center - New BuildingA
X91
Envelope Con
CS
VA w
I It, �P.
. n
2o03 IECC
Report Date: D9128/Q7
Data filename: 1N:1MechanIca 1120071M07174_Madison Gymnastics Load Cal clEngineeringlCalcUlat! onslNlechanicaflComCheck .cck
Section 1: Prefect Information
Project Title: Madison Gymnastics Center
Construction Site:
1 Jetstream
Rexburg, ID 83440
Owner/Agent-
Section
er/ g nt:
Section 2: General Information
Building Location (for weather data):
Climate Zone -
Heating
one:Meatin Degree Days (base 65 degrees F
Cooling Degree I)a (base 65 degrees l~):
Project Type.
Vertical l la n /''mall Area Pct.:
B.gilding Type
Exercise Center
Rexburg, Idaho
1
8693
143
New Construction
%
Section 3: Requirements Checklist
Floor Area
12223
De signer/Contractor:
Climate -Specific Requirements:
Component Name/Description
Reef 1: Metal Roof without Thermal Blocks
Roof + Metal Reef without Thermal Blocks
Exterior Wall 1: Metal WaJl without Thermal Blocks
Exterior Wall 2: Wood Frame, Any Spacing
Window 1 Vinyl Frame 0o u l e Pane with Low -E, Clear, SHGC 0.60
Floor I+' I b- n- rad ,.0 nh ted, Vertical I ft.
Gross Area
r Perimeter
11000
500
5300
2700
237
450
Cavity
Cont.
Proposed
Budget
-' a I u
'dal
Factor
U -Factor"
32.0
0.0
0.072
0,047
38,0
0.0
0.064
0.047
19.0
0.0
0.101
0.067
19.0
0,0
0.068
0.067
-__ -- 0.380 0,520
--- 8.0 --- ---
Budget U -factors are used for software baseline calculations ONLY, , and are
not code requirements,
Air Leakage, Component Certification, and Vapor Retarder
Lj 1. All joints and penetrations are caulked, gasfeted or covered with a moisture a r-rrr�
� � eabfe wrapping material inteiEd in
accordance with the manufacturers installation instructions.
. Windows, doors, and skyJights certified as meeting leakage r quer meat .
Lj . component I -values & U -factors labeled as certified.
F 4, Insulation installed according tomanufacturer's instructions, in substantial contact with the
surface being insulated, and in a
manner that achieves the rated F -value without compressing the insulation.
Li 5. Stair, r, elevator shaft vents, and other dampers integral to the building erive i are e u iPPed with
Lj . Cargo doors and loading dock doors are weather sealed.
Lj . Recessed lighting fixtures are.- (i) Type IC rated and sealed or gasketed, or (ii) installed inside arsappropriate air -tight assembly
with a 0.5 inch clearance from combustible materials and with, 3 inches clearance from insulation mat rf
I.
L] . Building entrance doors have a vestibule and equipped Frith closing devices.
Madison Gymnastics Center
'age 1 of
Exception -s: -
Ruilding enfranccz with revoiving doors.
Doors that open directly fro a space less than 3000 sq, ft. in area.
Lj 9. Vapor retarder installed.
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented in this i
� �idocument iconsistent with the building plHifi atior
and other calculations submitted with this permit application, The ro
posed envelope systern has been designed to meet the 2003 IECC
requirements in COM check Version 3.4.2 and to comply with the mandatory requirements In
AA
Name - Title r
Madison Gymnastics Center
Signature
Date
Page 2 of
I
COMcheck Software Version 3.4.2
Mechanical Compliance Certificate
2003 IECC
Report Date: 09128t07
Data filename; W:1Mechanica1120071M07174_fVladison Gymnastics Load Cal clEnginee ring4CalculationslMechanicafICotnCheck.cck
Section 7: Project Information
Project Title: Madison Gymnastics Center
Construction Site: Owner/ rpt:
1 Jt trearn
Rexburg, ID 83440
Section 2a, General Information
Building Location {far weather data}: Rexburg, Idaho
Climate Zane: 16
Heating Degree Days abase 65 degrees F)� 8693
Cooling Degree pays (base 65 degrees F): 143
Project Type-, New Construction
Section 3: Mechanical Systems List
Quantity SY$I—em Type &.0escription
HVAC System I P Heating: Unit Heaterr Gas
I Storage Water Heater 1: Service Water Heater
Section 4: Requirements Checklist
Requirements Specific To: HVAC System 1
Li 7. equipment mirtimurn efficiency: unit Heater (Gas)- 80°Io Ec
Requirements Specific To: Storage Water Heater 1
F1 1. Heat traps in inlet/outlet fitting s
Ll 2. 1/2 -in. insulation on 8 ft of inlet/outlet piping if no integral heat traps
Lj . Gas Storage Water Heater efficiency - 0.56 EF
Designer/Contractor'.
Generic Requirements: Must be met by all systems to which the requirement is app iicabfe:
LJ 1, Load calculations per 2041 ASNRAE Fundamentals
. Pleat equipment and system capacity no greater than needed to meet la
ads
- Exception: Standby equipment automatically off when primary t
em is operating
- E ption+ Multiple units controlled to sequence operation as a function of load
Lj . Minimum one temperature Ca.ntrol device per system
Li 4. Minimum on,e hurnidity control device per installed humid ifi ation/d ehu id ifi cation
F1 5. Automati'cctrl: Setback to 55 der F (heat) and 85 degrees
7 -day dock, =hour occupant override,
backup
- Exception, onti.n u ra l p ra ti n zones
- Exception: demand or less, submit calculations
F1 . Outside -air source for ventilation; system capable of reducing
to required min'
1 0 -hour
LJ 7. Hot Fater pipe insulation: 1 in. for pipes <=1- ire- and 2 in- for pip �1,5 in, Chilledat r .
�r�frE���r-illrin pipe fnlJffir: 1 Irl, for
pipes =1.5 in. and 1.5 in. for pipes >1.5 ars. Steam i insulation, 1. i - {
� �n. for �� �. ire. � in. for pip 1 .5 in.
Bison Gymnastics Center
Fags 3 of
Exception: Piping within H qui meat
E u PtiOn: Fluid temperatures between 55 and 105 degrees F
Exception: Fluid not heated or cooled
Exception: Runouts ft in i n th
. Operation and maintenance manual pr cd d to building owner
. Newly purchased service water heating equipment meets the efficiency requirements
Lj 10. Fater heater temperature controls; 110 degrees F for dwelling units or 90 degrees F for other occupancies
L -j 11, Stair and elevator shaft vents are equipped with motorized dampers
Section 5n. Compliance Statement
Compliance Statement, The proposed mechanical design represented ire! this document is consistent with the building lar
si
specifications and other calculations submitted with this permit application, The proposed mechanical systems have been designed t ,
meet the 2003 [ECC requirements in COMcheck Vers'on 3.4.E and to comply with the mandatory requirements ire the e u it r -r e n
ts
Checklist,
Name -Title Signature
Madison Gymnastics Center
C!/2 e 1.2 tDo—?
Date
Page f
COMcheck Software Version 3.4.2
Mechanical Requirements
Description
2Ox.) 3 1 E C C
Report Date.
Data l r rri . WAM h ni ah. 00T 07 11Madison Gymnastics Load Cal c\En o "
— ]� need rr�1latins\f'1hnll�rnheck. cck
The following list provides moredta[Jd dri �r� the requirements int in Section f the [hnif Compliance
Certificate,
RequirementsSpecific T HVAC System 1
1 . The specified Beating and/or cooling equipment is covered by the ► H RAE 90. 1 Code and
rout rent the following minimum
efficiency: Unit Heater (Gas): % E
Requirements Specific To-- SStorage Water Heater 1
1. Heat traps are required on noncirculating water heating systems ori both inlet and outlet connections. Ht traps may be purchased
or field -fabricated by creating a loop or inverted -shaped arrangement on the inlet and outleti
Fri insulation fir the� �.
.
specified non it ori tin sari hot water- system is required for all piping in the following cite
gor[es:a)
p p
t fiat ft �f outlet piping ire fr-�r� � constant -temperature, noncircuiating storagetemb inlet.
� tJ�� piping between the storacie
tank and a heat trap in non ar ulatin storage s t rnPip insulation must b t least
�1 1in. and h conductivity no
Btu-in/(h--ft -degrees ),
P Service water heating equipment used solely for heating potable water, pool heaters and
" � fit qtr- stir- tanks rust rpt the
following miniumum efficiency: Gas Storage Water Heater efficiency >;-- 0.56 EE
Generic Requirements: Mut be reset by all systems to which the requirementi .
1.
9
6
Deign heating and cooling loads for the building must be determined usingprocedures res ire
� the HJR Handbook f Eundamntl
or ars approved equivalent calculation procedure,
All equipment and systems must be sized to be no greater than needed to met calculated loads, A single piece f equipment
providing both heating rid cooling mut satisfy this provision for one function with thecapacity for the other function as smaJI as
possible, with ire available equipment options.
- Exception,, The equipment and/or systern capa6tymay be greater than calculated loads for standby purposes. strdb
equipment must be automatically controlled to be off when therima ui ri nt and
� � � fir system is operating.
- Exception: Multiple units of the same equipment type whose ombin dit
,� ed the calculated lid are allowed if they
are provided with controls to sequence operation of the units as the load increases or
dry.
Each heating or cooling system serving a single zone rust have its ovvn temperature
Eahumid
r�trl device.
h
humidi ati n system must have its own humidity control device.
The system or zone control must be a prograrnrnab[e thermostat or t �meeting � P
.her �utrrltf controlt� f�lC�ir-1 �retri:capable
f satin b temperaturet degrees l= during heatingand tai
g up t� dr F d�ri� ���air��� capableof automatically
setting back or shuttingdown systems during unoccupied .fours using different d hedu l .
ble 2 -hour
occupant overr-id d have battery back-up c Pati of maintaining programmed settings f r
at least 10 hours Without power.
- Exception. A setback or shutoff control is not required on thermostats that control systenns serving areas that operate
continuously.
Exception, setback r shutoff control is, not required on sYsterns with total
energydemand of 2 kW Btu/h) or le.
. The system Must supply outside ventilation sir as required by
Chapter 4 of the International h ni l Code, If the ventilation
system is designed to supply outdoor -air quantities exceeding r inin rn required
lvJs, the sstrn rust be capable f reducing
outdoor -air flow to the minimum required I r l .
'. All dipsren paTnditionin�trT�.� must b ir�uF�t
' d as follows: Hit water piping for heating systems., I ir. firi s
=�I 1112 -in. nominal diameterinf for pipe �l
1/2-in,r�ortir�ir�al � �
diameter, Chilled tri refrigerant, and brine pipn. . t��-I: 1 ire.
insulation for pipes _1/2 -in. nominal d i r t r 1 i r� . Insulation for i .
pipes �TIn. nr-r-llnal diameter. Steam piping: 1 1/2 In.
insulation for pipes <=1 1/2 -in. nominal diameter 3 in. insulation for pipes >1 1/2 -in. nominl diameter.
- Exception; Pipe insulation is not required for factory-installedi in within J
� p equipment,
Exception: Pipe insulation is not required for piping that conveys fluids ha
�r> g a design oprtintemperature range between 55
degrees E and 105 degrees E.
Exception., Pipe insulation J s not required for piping that conveys fluids that have
not been heated or cooled through the use of
fossil fuels or electric power*.
Madison Gymnastics Center
Page f
Exception: Pipe insulation i', required for runout piping not exceeding in length 1
n, in d[rnter between the control
valve and HVAC coil,
. Operation and MaIritenarice documentation u t he provided to the owner that i �
includes e t least the following orin information.a)
equipment a p it (4input and output) required maintenance action lbequipment operation and maintenance nul) HVAC
SyStem control maintenance and i libratiinformation, including rn dig r ��ent� ,�� �nt�l��� descriptions;
r;
diced or field-dtriried yet points mut be permanently recorded on control drawings, at control devices,or, for digital control
st om a in programming ommentsd complete narrative of how each system is
intended to operate, eata
. Service water heating equipment mut rpt minimum Federal efficiency
requirements �niuded in the National Appliance Energy
Conservation ,et and the Energy Policy Act of 1992, which neat or exceed ASH
RAE 90.1 Code. New service water heating
equipment can be assumed to meet these requirements.
10. Water -Juin equipment roust bprovided Frith controls that ii the user t set the water temperature t
p � � ure t 1 1 0 degrees F for
welling units and 90 degrees F for other occupancies. Controls must limit output temperatures of lavatories ire public
restrooms to 110 degrees F.
1 Stair- and elevator shaft vents must be equipped with motorized dampers capable of being automatically closed duria normal
bullding operation and interlocked to open as required by fire and smoke d-e-tection systems. All gravity outdoor air supply and
exhaust hood , vents, and ventilators must be q nipped with motorized dampers that will automatically shut when the spaces
served are not in use. Exceptions: _ Gravity non -motorized) dampers are acceptable in duiUn s less than three stories in height
above grade. - Ventilation systems serving unconditioned spaces.
Madison Gymnastics Center
Page 6 of
117Floor/Mezzanine 9,520 1089 1 1-21021 56,415 Direct Direct
4pm June 71 7o.�o
60 1,813 11813
2471520 0. 64 0 1,412 15402
.......... .
2 Office 388 9,5 9 67869 500 Direct Direct
Spm September 2 620 376 0 24 24
3.298
1.60 0.97 0 1 15 86
3 Corridor 230 2,161 1,Q32 0 Direct Direcf
Spm September 0
1 10955 01-40 56 0 14
.61 0.25 0 26 13
4 Mens Restroom 127 548 432 0 Direct Direct
9prn December a 36 24 0 8 8
11080 0.28 0.19 0 7 5
5 Womens Restroom
5�am September 183 3,84 x,285Direct Direct
0 249 70 0 1 1 1 1
1,556 1,36 0.38 0 46 16
......... . ..... .. ..
6 Entry/Staircase 316 91564 7P019 468 Direct Direct
fpm September 2 620 384 0 35 35
4,740 1.96 1.21
0 115 88
7 Mewing Area 498 9,836 131,003 25100 Direct Direct
Spm August 20 638 711 0 31 31
4,233 1.28 1.43 0 119 163
. . ..............
.............. ..........
8 Excersise Room 961 1 3,203 1 81115 85000 Direct Direct
Spm September 1 0 856 99 1 63 63
....... 8"F649 0.89 1.03
0
. ..... 159 227
Zone Peak Totals' 12,223 165817 159775 67,483
Total Zones: 8
105 10,750 8) 739 0 2,000 21000
Unique Zones, 8 273,x3(} 030 0.88 0,71 0 2,000 2; 000
wj .5s
A
r2n
OCT 1 7
WAMechanicaf120071MO7174 Madison Gymnastics Load C
alclEng'.neeringlCalculations\Mechan'ERM�i3OS�ekdml�g�O7,4-.33 PM
:.
7PlN Commercial , L r
4h ..
~� �.-Company,
ao : ::.tRdh7o-} ,..;f*o-_ai }:y,} �;... - :. - 'r ,. .. -ri .. - • �. +. 'it' .. F�}j. moi. [1�yL.
.� ..
:. .. ,..
Air Handler #1 J1W Uverall Total Load Summary
Air Handler Description'. r li Con'st"
nt Volume Sum of Peaks
-
SupplyAir Fan:r itprogramI
estimated horsepower r fHP
Fan Input, 0 % motor an d �
fan efficiency with 0 j n , water across th e fa n
Sensible Heat Ratio, 0.71
�� _ This system occurs 1 times in the build ire
Air System Peak Time:
°
Outdoor conditions:
5pm in July.
880 DBP 680 VVB, 88.20 grains
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in August at 4pm is different
from the total system peak time, hence the air system CFM was computed using a zone sensible load of 155,123.
Simmer: Ventilation controls outside air, ----- Winter-. Ventilation controls outside sir.
Zone Space sensible lass: 165,817 Btuh
Infiltration sensible
loss -0 Btuh 0 CFM
Outside Air sensible lass: 166,957 Btuh 2,OOfl CFM
Supply Duct sensible loss: 0 Bich
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: p Btuh
Total System sensible loss: 3,32 774 Btuh
Heading Supply Air: 165,8171(.840 ?i 1.0$ X 17) = 107750 CFM
Winter Vent Outside Air (18.6% 0f suPPlY) = 2,000 CFM
Zone space sensible gain: 154,643 Btuh
Infiltration sensible fain: p Btuh
Draw-thru fan sensible gain: 1,759 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 41640 Btuh
Total sensible gain ars supply side of coil: 1615042 Btuh
Cooling Supply Air: 161,521 f (.840 X 1 .1 X 20) _ .87739 CFM
Summer Vent Outside Air (22.g% of supply) = 2,000 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btu h
Outside, air sensible gain'. 25,877 Btuh 21 000 CFM
Blow-thru fan sensible gain: q Btu h
Total sensible gain on return side of coil; 25,877 Btuh
Total sensible gain on air handling system: 186,919 Btuh
Zone space latent gain: 67,483 Btuh
Infiltration latent gains 0 Btuh
Outside air latent gain: 15; 197 Btuh �
Total latent gain on air handling system: 82,680 Btuh �
Total system sensible and latent gain: 269,599 Btuh �
Tota! Conditioned Air Spaces
Supply Air Per Unit Area:
Area Per Coaling Capacity -
Cooling rapacity Per Area:
Heating Capacity Per Area:
Total
Heating
Required
With
Outside
Air.-
Total
Cooling
Required
With
Outside
Air --
121223
0.7149
544. D527
0.0a18
27.23
33,774
22.4?
0
F,ft
S . ftTo
TrS.ft
Btu S,ft
to
Tons
VI(:1MeChanfCal120071MD7174_JViadiSop Gymnastics Load Ca[C1EngineeringlCalcuiatianslfVleChani€�i3O��ge�2gi-Mfl7, 4:33 PM
9
'C�i�racr ` F�if Cc%inmerc�e�� �lYHL+ �.oi�ds L,+[7r.�E��ati�i� Program .. , . _ ,. -
.:`E $� d CSE-��par�y.... _ - _.... k ��Cy p{��y }n. �j^�[�[�j {n�*
': * . .�,. L �L�'� ..... �i. ��iVGlli .�EI�rfAlElibr
1111
CGy�p�� t�s�$340EldahcFalls ID
Its
Zone D
etailed Loads (At Zone PU&ftak Times)
..... .... Unit SC-- ..C...... -...L....
.. 'D � U ..
lac '........
Sen L...
ai F�t9 �{t.".
�..........
Quay _ , CFAC.HGF S :._._ . -�LF�- Ga�� `- Gain,- 11 U Uoss
Zone, "Open GYM' Floor/Mezzanine,.pea
JO
ton pe cup.
ks (se€�sible) in ,dune at 4pm, fir ��ndler 1 (Over�1l)Gg,5�20_0,Construc
Roof-I -2-No.Clg-L 4,574 0.50 30,E 0.040 55617 3.6$0 16.831
Roof-2-2-No.Clg-L x, 5 74 0.50 30.7 0.040 5,617 3.680 16,831
Wall -1 -N-G-D 1,55Q 1 17.7 0.067 11838 6.164 9�554
WalI-2-E-GWD 1)549 1 23.Z 0.067 2,48 6.164 91548
Wa.11-3-S-G-D 3$$ 1 30.7 0.07 797 E.16� 2,38
Wall-4-Il11-G-D 1,1 �i � &51.E 0.067 4,825 164 71253
9
Partition-�-1 9023 0115 C.250 Q 3,750GIs-E-1 90r�r33,$36'..;1
000 7 0.3-80 3 34.960 35
Q°roS-4-N5-Saar 1.0 0.600215 0.25f? 32
GIs -W-1 -90-Tran 40.0 1.000 7 a.380 102 34, 9EQ 11398
0%3-0-NS-Solar40.0 0.60Q 2�5 �.57� �,94�
Lights-Prof=2 12, 376 1.000 42;2 9
Equipment-Prof=1 5.0 1.000 171 a
People-P'rvf=1 74.5 1.0p0 35,259 56,415
Floor slab 225 . _ _ _ _
Sub -total 1 01 $3$
Safety factors.- +10%
Total w/ safety factors' 112,021
18.400 4,140
56745 10-1,B16
+0% +15%
56t415 11 7,O89
Sub -total F
Safety factars: +10%
Total wl safely factors. -
61869
500
%
--- -W-WW.._-
500
2.28.3
8,321
+15%
9 559
Floor slab
S -b -total
Safety factors:
Total w safety factors:
I
938
+10%
11032
1,$79
+15%
0 21161
W'�Mechanical\2007�M07174—Madison Gymnastics Load Calc\Engineering\Calculations�.MechanlEai&E��,CsEoek&ffd�2(3
W07P 1 3P
Total wl safety factors: 13285 0 ---------- i
3,84 7 ;
�one 6-EntrylStaircas� �e�ks �se�s�k�� �€� Se t�rnbe".�� 5 m�;ir Har�d�r � (10ir�rall Ca����uc��Qn T��P.
}, Group a;
.............
Roof-l-5-hfo.Cl L - .... _:
9` 316 (].50 16.7 0.X33 17� . ........... ....Wail-1-S-E-1� � 55 �3.436 959
34.9 Q.�66 35 6 6.D56 939
t111a11-2-W-E-D 171 1 22.9 0.066 257
�Wall-3-SE-E-D ��� � 6.056 '1,33
X8.4 0.066 232 5.056 751
Wall -4 -SW -E -D 166 1 32.4 0,066 353
Wall -5 -NW -E -D 93 1 10.9 D.0G6 �� 6.056 � ,002
Partition -6-1 316 6,Q�6 563
Of�5 0.250 (} 3.750 1185
GIs -1 -90 -Tran 2 � .D 1.OOD 3 0.380 27 34.960
O%S-O-NS-Solar 21.0 0.600 227 0.660 11888 734
Gds -SW -1 -90 -Tran 15.0 1.00D 3 0.380 19
O%S-0-NS-Solar 15.0 0.60 227 4.66Q 1.348 34.950 524
Lights-Prof=2 315 5 1.000 1;1
075
l People-Prof=l
2.3 1.000 X85 468
Floor slab 10
- .. - ... . w 62.560 626
Sub -iota! 6, �8 � 468 I
Safety factors: $,316 f
+10% +0% +15%
Total wl safety factors: �----�----
,019 468 91564
N
W-\Mechanical\2007\MO7174—Madison Gymnastics Load Ca I c\E n gin e erin' g\Calc u I atio n s\M e ch a n'F@Mi�-OS48ebildO;�-WO7, 4-33 PM
2003 IECC
Repo rt Date-,, 10/19107
COMChack Software Version 3.5.0
Lighting Compir AI
#ft�_ ! ' �A�
0700406
Madison GNI,iiiiiastics Center
Data flname: ,-\Frogsm Fit \ e � h kAPRJP-T � ` i 1 [ .
cok
Section 1 : Project Informat'P
ion
Project Title: GYMNASTIC CE 7C
Gonstruction 4e: Ownef/Agerit.-
REXBURG. ID 8 440
Section 2: general Information
Suilding Use Description b '=
F roject : New Constructlon
MIn a Type
r=kQrOiSe C9ntQf
Section 3: Requirements Checklist
Epferior Lighting:
. Total Proposed watts rout be I " " than Or equal to total allowed watts.
to od Mitts Proposed Watts
9000 8464
.
Exit:giqng 5 Waw or Eels per Bide,
niplie
YES
881 Jet Stream Dr
Designer/Contractor- +I$ �6'�•s
EL
Lighting;
Z13. Efficacy greatigr than 45 lu rj/w,
Exceptions,.
S PeQia N iAed lighting highlightifig featuresof historic buflding ; signaga, safoty or security li J - ,
lrlq
/ntr i , Switching_, and Wiring:
4� Ind6pe dent� trol for each space (switch/occupancy sensor).
E tion
,r aS dia5I nsted as 6ecurity or ncy areas that must be continuously iIlurnin t d -
Li htin In st Irwas or cortldomthat are elements of the means of egrezis.
, - t -m er Switch at entry to h [ l/rr ntol 9 uogt room.
� I .-LndW. K Ptj 3110eI1in units rate y rn ete red
. E;n PQOO provided with a manutid control do provide un1 -n light reduction by at least01r�c.
.cel F
Only one luminaire in space:
An upant -5enilrlg device controls the area,
Th a ere i:G corridor, 6 to re roVm, rears om , P U brie 10bb ort
g u ro orn;
Areas t @t u e less than 0.6 ' sft,5/qA
R Automatic lighting h ut oar Kn buildingsilarger than 5,QQQ 5q,ft.
tiR .r with only one Ir. m i n sire , cearridoui, storarooms realrooms,-
PhOtOc-ell/astrGn rnical t1me swItch on e t dor lights -
C I TY
0F H00%L EX8 U R G
— ��" r5^^A^'" .+M':+rS'h�k°o Mslikiansrv+ma'd!4N�Y�51 hA4Y.4AhVr,+y,�'S YMI�Ir+45��A5AtiYy°14
Project Tit[ai GYMNASTIC CEMTER
DaTa fil r; CAProgram F'iles\Check�COMcheck\PROJECTS�GYMVJRG[N..Cck Report dalev. 10/19/07
Page 2 of 4
d V
Ddr-iEr\ � -]IV' 1��Il 11 0 0 0
COMcheck Software Version 3.5.0
Lighting A pplication Worksheet
2003 IECC
Report Date:
Data filename: G:1Program FileslChecklCpMchecXlPRQJEC751GYMVIRGIN.cck
Section 1 : Allowed Lighting Power Calculation
B C D
Floor Area Allowed Allowed 'Iattzi
9000 1
Section 2: Proposed Lighting power Cal'culation
A
Fixture ID - Do ri tion / Lamp I a o Per Lamp Bali ,1
1 1 i 1
. 5 Id ■
Exa.�raf .A 1 ' �, �e e a • •E•�a. .,�°. 1 Yds P an. is Y.• ..
■ tIg 1' Ft9..1'■ Y P' i 1i.° 1 P ' P YPP ■
I.:iF •P • 141• ■ a M ■ • �• { 6� {.' P !! l�Fe
I If ee ° qo
P . . . • e _ ;6`� I'^ � , 1 '" lr P'1, {al , i •{ P 1 e
, , e
f oar Plum 1: 46;p'TS W I to tr n
Section 3: COMPIL iance Calculation
Total Allowed Watts = 9000
Lamps/ # o
Fixture Fixtures
Fixture
Daft,
E
(C X D)
1 . .. , 1 43�i1' '- 1.
I 1
. , . . ••. i 1
-
+,lel •r A{ il e{ 1
�� y
°
�
'ICF•'
. . { ■ ■ d le ■,
.. e• ■ { i
1 Y■41 e' ti l!
•'1
e { 'fie !! 1 N S 'Fd�MI'If
I ° I. al .1 'RY 111 1
' I
Is,=■t a
I N IPI �le• • �.� ! iF 4 1 1
I P IL
II'4 ' . •• d p,e •.n i i {e
RI{1 P I'
I � , • P Pa ■ ■ ■■ r . L e e■
dd ° ° P Y■1 I R
d ' �.!!
�.� �,,� le I
4 !! . , j.L i �. = ■ 4 Fl,f 1 . 1..I'
.. !i11, , t+reP . '�+ � 11FMY .Ik M. 1.1'.•' 4
,.I 'il
I II .. I.Fe.F ' ' ' al'•°
e{n'.l1111
. , w
• '
'iR 41. ne . 1•'3111 FYW IP ea• . "�'1M Y 11 { Y
74 {
j
7e ■ ® II dale "
23 368
W
Total PrOpcgod Watts = 8464
If the Total Allowed Waw minus the Total ProPOsed Watts is greater than or equal to zero, the bulldlng compiie,5,
Total Allowed Waft = 9 1)
Total Pro gSed WattS 8464
Project MPH'An e 53,15
�h°7 Mw'Frrnwr. t•s.L re5`.+`!L'+.S�.�V.vsm,•.we.�x7.4k5r1V.W�°�_—__.r��.. .y,�'t'4R45L'S4w �fYi'A'Y'�55 Y'A°.5°heyl:��, �'A°,j%�vli'.:MP. ,.
5'�,IS'�1",a Y1P°45ti'. w. K 5"+5'�q'455'� M1..>. ®�.•! ■ eek
�a1a�54"W�5`A'44554'S'.".5'S'.51��.•W.'�. Ala. --e,.,�:.�F.1�P�,•�{k'; r4ly°..,_ .� �
5�°l.hiWP-4T•'N.S�i�ia�ip'ASI.�LM.'Y.tiiS'.SYiN%.WLi'.G.rY Pr Wi,'•Sia.=S+LirA�.V�•JL�'h"LL,L�tit��aEal _�a�.a.0
rOl t Tide; GYMNASTIC NATI CENTER
Data lena : CAPM73M til \C�h rt date® 10/19;07
Page f
v_ U
Eti u;
Lighting intended for 24 hour use
1O.Tnndem wired p end threewlamp ballasted
E dons! ballasts).
ElectroniC high -frequency banasts; Lum[naires on Omer -
r� Circuits Or with no Mvailable pair.
Section 4; Comphance Statement
Compliance Statement., The proposed g represented In this doom meat 'is Gonsistent with the building plans, j .
at -ions and
thor Icul fi n ubr r tt l with thI.C.7 PermIt aPPHCafion. Thero � .
P d Iitir1U qystem has been designed to east the 2008 I Cha ler 8,
requiroments in CoMchee(Var5,C)n 3,5,0 an4d to GOPnPly wft tie mandatory req a remits in the Requirement Checklist_
Name - Title
1n tura
C t e
�..,,v.�!vh�.J6.►—. s��yATi+�lM11i�RaYY4�
v�4a�aPrOject Title- CMANASTIC CEMTCR
�.wM+i�YWiI+�YwVWYtiA� �
Data flOname: C;Trcogram Flips\C 1 � 1 he ck�P Report dates 1011910'7
PagG 3 of
1��� �J''DR '�7'130L a