Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PROJECT INFORMATION PG 2 - 07-00402 - Madison Gymnastics - Tenant Finish
RignY-Su Spacel 1 51 ite Com mercial Load Summary Job: Nov 1, 2000 Zone: Space IF COOLING LOAD DESIGN CONDITIONS at Jul 1500 Inside- 75 OF outside. 89 OF R H.- 50 % Moisture: -31 grub 2. SOLAR RADIATION THROUGH GLASS 3. TRANSIYIISSiUN GAINS sensil,�lalis:2'728 Glass - D 187 Qors: 678 Partitions: � Floors: � ROOfs/Ceilings- 10695 Retum Air Ceiling: 4. .INTERNAL HEAT GAIN qari�ih1 0 uccUpants: Lights: Motors: Appliances: INFILTRA'FI{)N: SUBTOTAL: Spa SUPPLY DCCT YVi 1�7ILJI1c; 6500 56711 a 0 Outside air cfm: ce Coad SUBTOTAL: Bldg comp's and supplduct Actual cfm: y�76� at Supply [L)- 9. VENTILATION: Make-up air cfm: 7.0. RETURN ASR LEAD: Lighting & roof {net} 11. RETURN DUCT 12. TOTAL LOADS 4N EQLIIPM:ENT 13• DESIGN CONDITIONS Inside: 70 ° F Outside: 7.4. TRANSMISSION L055E5 HEATING LOAD Peakload at Jul 1500 TD: 14 OF mulit: 1.0 Ins.wb Sensible 4614 14288 Latent 63211 10833 _ o 1894 24505 106618 0 106618 -P0 0 0 106618 mult- TD: � °F Walls: -- 19735 GPass: 3393 Doors: ,����� Partitions- � Floors: 7 �Gfi99 ROOfS/Cellings: 11856 Rehm Air Roof � 15. INFILTRATION.- Outside air cfm: 16. SUBTOTAL: Building cvmponents 17. SUPPLY DUCT: 18. VENTiLATI4N: Make-up air cfm: 19. HUMIDIFICATION 20. RETURN DUST 21, TOTAL HEATING LVAD UN EQUIPN�E�iT -� =yam ' �y' *��- y p i�� �.. � �htsoft �1y u ne (o m r a 15 -1 1 WY 1550 0 1.0 76 OF 67558 176424 0 0 0 0 176424 62 °F Latent 10833 WE -3assa -23800 f -23800