HomeMy WebLinkAboutCOMCHECK - 07-00402 - Madison Gymnastics - Tenant Finish4P -
2003 IECC
D
CO M check Softwar
M
"t
0700402
Madison (jr\11111clstics- Tenant A 41sl1
8/23/07
Envelope Compliance Certificate
Report Date. 08/22107
Data filename: Q-0ocuments and SattingsALAN CA00 MDes kto k orn h E
Section 1: Project Information
Project Title. Tenant Improvement
Construction. Site;
01 Dividend
Rexburg, ID 83440
Owner/Agent;
Alan Cook
Design D l p t LLC.
P.O. Box 131
Teton, I 83451
70953
aerotech@fretel.com
Section ZF!4 General Information
Building Lon (for weather data).
Climate Zone:-
Heating
one;Heating Degree Lays baso 65 degrees F:
Cooling Degree Days, (base 65 degrees F):
Project Type. -
Vertical Gl
ype,' rt 11 in / Wall Area Pet,
iv -Type(-s)
Gyrimasiurn Playing Burke
Office
Other
Rexburg, Intl
1
869.3
143
New Construction
1%
Section 3: Requirements Checklist
Io or Ares
5272
180
128
Designer/Contractor'.
Man Cook
P.O. Box 131
Teton, ID 83451
Climate -Specific Requirements:
Component Name/Descriptio
Roof 1: Metal Roof without Thermal Blocks
Exterior Wall 1: Metal Wall without TheFmal Bucks
Window 1: Distal Frame with Thermal Break. -Double Pane, Tinted,
SHGC 0.17
Door 1 Solid
Door : Overhead
Gross Area
or
Perimeter
1800
9840
252
196
Cavity
-Value
coat.
Iue
w
Proposed
l -Factor
0.076
0.111
) AI
0.350
0.350
Budget
-Factor
0,047
0.067
0.520
(a) Budget U=fac#ors are used for software baseline calculations ONLY, and are not cede requirements.
Air Leakage, Component Certification, and Vapor Retarder Requirements,*
❑ I. All joints and penetrations are caulked, gaskefed or covered with a moisture vapor -permeable wrapping materia] installed in
accordance with the manufacturer's installation instructions.
Tenant Improvement
� .
Page 1 of
� a
2. Windows, doors, and rlic r rtiftd metro leakage requirements.
. Component R - values -f ui r labeled as cerfiffed.
.I nsulation i n t fled acmrding to manufacturersinstructions, in substantial contact with the surface being insulated , and in a
manner that achieves the rated -value without compressing the insulation.
. Stair, elevator shaft vents, nd other dampers integral to the building envelope are equippiad
0 6. Cargo doors and loading dorkdoors are weather sealed.
Ll .. Recessed lighting fixtures are: 1 Type IC rated and sealed or 4 t d r ll installed inside .n appropdate inti 'h
assembly with a 0.5inch clearance from combustible materials and with 3 inches clearance from insulation material,
LJ 8. Building entrance doors have a vestibuleand equipped with closing,
Exceptions.,,
Building entrances with revolving doors.
Doors that open directly fro$Pace less than 3000 sq. ft in area.
LJ . Vapor retarder 'Installed.
Section 4.w Compliance Statement
Compliance Statement. The proposed envelope design r pr nt d In this document is wnsistent wfth the building plans,
5pecifications and other calculations submiftedwith this permit application. The proposed envelope system has been lesioned t
asst the 2003 J ECC requirements in COM check Version 3.2.1 and to comply with the mandatory requirements in the Requirements
Checklist.
Principal Envelope Designer -Name
Tenant Improvement
Signature
Date
2003 IECC
D
COMcheck Software Version 3.2.1
Q
Permft Dam
Lighting Compliance Certificate
deport Date: 08122/07
Data filename: CADocuments and Semon \ALAN COO
Section 1: Project Info ation
Project Title: Tenant Improvement
Construction Site:
301 Dividend
Rexburg, ID 83440
Owner/Agent;
Alan. Cook
Deign [Development LLC.
P.G. Box 131
Teton, ID 83451
709-4453
aerotech@fhatel.com
SOction Z: General Information
.1
Building Use Description by: ActI TYPE
Project Type: New Constivction
,*'. a
-W
s o r
' Playl ng Surface
ff
Other
lection 3: Requirements Checklist
Floor .Area
5272
180
128
Interior Lighting:
13 1. Total actual waw must be less than or equal to ftl allowed watts.
Allowed Waft Actual Waw COMIks
7707 6750 YES
2. Exit stgns 5 Watts or les per sWe.
Desi n tr r:
Alan Gook
P.O. BOX 131
Teton, I 1
- — 0 %
Exterior Lighting:
. Efficacy greater than 45 lnf.
Gem:
Specialized fighUng highlighting features of historic buildings; signage- safety or security righting; lour- It a landscape
lighting.
Controls, Switching, and Wiring..
J 4 Independent controls for each space ithocany sensor).
.do:
Areas designated as securityr emergency areas that must be continuously illuminated.
Lighting in stairways or odors that are elements of the means of egress.
LJ . Master swftch at entry to hotllctl guest room.
Lk . Individual dwelling units sopa tel et re .
. Each space provided with a manual control to pfovideung It t reducdon by at least
- _ - .-:�*-z...-••:—.• .•• :.. .. •, . '¢48'"€'rfYi9'.ilYho5l4: Y'�#A'
Tenant Improvement
Page 3 of
Excapfionv
Onty one luminaire in space;
An
- -
n occupant -sensing device Controls the area
The r is a Gori d ora store, rester Pubfic
Areas that use less than 0.6 'wafts .,
wntrol in buildings larger than 5,000 sq.ft.
U! 19- Photoce 11/antro of y f
[ match o exterior lights.
Exceptions:
Lighting intended for 24 hour use.
U- 10. TarideLM wired one -lamp an'd three -lamp ballasted luminaires (No single4amp ballasts).
Exo:
Electonic high -frequency ballasts; Luminaires r
Section 40m Compliance Statement
OmPfianceStatement: The proposW ligtt N, ign represented i thIs istent with the F building
sPecifications and other calculations submiftedVA'th this
permit
met the 2003 I, Chapter 8, requirements in COMcheck Version 3.2.1 and to comply with
Requirements Cheddist.
Prindpal Lighting Ine
r -Name
P,
Temnt Impmement
Signature
Date
Page 4 OT
IF
7
L
COMcheck Software Version 3,2.1
,Permit Date
Lighting Application Worksheet
2003 IECC
Report oats:
Data filename_ C:IOocumenfs and SettingslAl..AN COO FCtdesfctaplc0mchksIV4'AREHflT1MP-1.CGK_cck
Section 1: Allowed Lighting Power Calculatio-n
A
Area Category
Gynmasium Flaying Surface
Office
Floor Area
4ft�}
Allowed Allowed Watts
llilla#ts f ft2 (B x C)
5272 1.4 738i
180 1. 1 1'
Other 128 1 128
Total Allowed Watts 7707
Section 2: Actual Lighting Power Calculation
Fixture ID :. Description I Lamp I Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D)
Fixture Fixtures Watt,
HID 1: Metal Halide OW Electronic
X50 f'I 45
Total Actual Watts 6750
Section 3: Compliance Calculation
If the Total Allowed Wafts minus the Total Actual Waft is greater= than or equal to zero, the building wrnplies.
Total Allowed Watt = 7707
Total Actual 'watts = 6750
Project ornpli n = 957
Tenant Improvement
Page 5 of
01
fA
2003 IECC
Pan -nit
Permit Date
COMcheck Software Version 3.2.1
Mechanical Compliance Certificate
Report Date: 08/22107
alfilename: : Documents and SettingL_ . KXDes ktop\camchks\WAREH0T1 P- I .
cok
Section 1: Project Information
Project Title: Tenant Improvement
Construction Site;
1 Dividend
Rexburg, ID 8340
CMner/Agent:
Alan
Design Development LLC.
P.O. Box 131
Teton, I C 83451
709-4453
aerotech@fretel.com
Section 2w. General information
Building Location (for weather data): Rexburg, Idaho
Climate Zone., 1
Healing Degree Days (base 65 degrees F),,- 8693
Cooling Degree Days (base 65 degrees F: 143
Project Type: New Construction
Section 3: Mechanical Systems List
Quantiltv System TvDe & Description
1 HVAC System 1: Heating: Radiant Beater, Gas / Single Zone
1 Storage Water h eater 1: Service Water Heuer
Section 4K. Requirements Checklist
Requirements Specific To: HVAC System 1
Des i gner/Contra-C-10 r:
Alan Cook
P.O. Box 131
Teton, I D 834 51
Requirements Specific To: Storage Water Heater I ;
LJ I. Heat traps in inletlout[et ftting5
D 2. 1l2 -1-n, insulation on B ft of inlet/outlet piing if no integral heat traps
❑ 3. No efficiency requirements for water heater with storage capacity less than 20, gallons_
Generic Requirements: Must met all stems which the i applicable;
1. Load calculations per 2001ASHRAE Fundamentals
2. Plant aui nt and systemrAnnnihi n r
tr tl�r� t ivu
Exception: Standby equipment automatically off when primary system is operating
Expf on.. Multiple unite controlled to sequence operation as a function of load
U 3, Minimum one temperature control devicep r system
L) . Minimum one. humidity contral dovice per installed humidification/dehumidification tem
Automatic Controls, Setback to 55 degrees F (heat) and 85 degrees l` (cool); 7 -day clock, -.dour occupant r aj
backup
Tenant Improvement
I0 -hour
Page
Exception: Contint y operating zones
Exception; 2 kW del 1id r less, submit calculations
. Outside -air souroe for ventilation; system capable of reducing OSA to required minimum
LJ 7. Hot water pipe insulation: 1 'In. for pipes =1.5 in. and 2 in. for pipes. >1.5in. Chilled water/regi r nt/ rin insulation:
in. for pipes � .5 in. and 1 .5 in. for Pipes >1. in. Steam pipe insulation. 1.5 in. for pipes =1.5 in. and 3 in. for pipes 1
in.
Exception: Piping within HVAC equipment
Exception: Fluid temperatures between 55 and 105 degrees F
Exception: Fluid not heated r copied
Exception, Runouts <4 ft in length
8. Operation and maintenance manual provided to building owner
LI . Newly purchased service water heating equipment meets the
fficienrequirements
LJ 10. Water heater temperature ontr i , 110 degrees 1= for dwelling units or 90 degrees F for other occupancies
IJ It Stair and elevator shaft vents are equipped with tri m per
Section 51.A Compliance Statement
Compliance Statement: Theproposed mechanical design r pr tinted in this document consistent with
specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed
to meet the 2003 IECC requirements in COMrheck Version 3.2.1 and to comply with the mandatory requirements in the
Requirements Checklist.
Principal I e h nice l Designer -Name Signature Date
Tenant Improvement P
A
iiR
COMcheck Software Version 3.2.1
FMO
Mechanical Require. ents
Description
2003 IECC
Report Date:
Data filename: G,kL}ocuments and 5etiings'u4LgN CppK}Desktop},Gamchks1WAREHaTlMP—I.CCK.cck
The following list provides more, detailed descriptions of the requirements in Sermon 4 of the Mechanical Comliana
Requirements Specific To: HVAC System 1
Requirements Specific T Storage Water Heater 1
1 e Heat traps are required on noncirculating water heating systems on both inlet and outlet connections. Heat traps
Purchased or field -fabricated by creatinglop or inverted U-shaped arrangernent on the inlet and outlet pipes.
2. Pipe insulation for the specifled noncirculating servicehot water system is required for all piping in the following cat des:
a)
the first 8 ft of outlet piping from any constant -temperature, noncirculating storage systemb the inlet Piping between the
storage tank and a heat trap in a noncirculating storage systemPipe insulation must be at least 1/2 in. and have a conductivity
no >0.28 Btu -i nl h -f -degrees F).
ri water heating equipment used solely for heating potable water, pool heaters, and hot water storage tanks must meet
the following min umum efficiency; No efficiency requirements for water heater with storage capacity less than 20 gallons..
Generic Requirements: Must be met by all systems to which the requirement is applicable:
I . Design heating and cooling leads for the building must be determined using procedures in the ASHRAE Handbook of
Fundamentals or an approved equivalent calculation procedure.
2. All equipment and systems must be sized to be no greater than needed to meet calculated loads. A single pike of equipment
providing both heating and cooling must satisfy this provision for one function with the capacity for the other function as srnafi
as possible, within available equipment notions.
- Exception: The equipment and/or SYSrteMGaPaCity may be greater than calculated loads fbr standby purposes. Standby
equipment must be automatically controlled to be off when the primary equipment and/or system is operating.
Exception, Multiple units of the same equipment type whose combined capacities exceed the c-ai Mated load are allowed
if they aro provided with controls to sequence operation of the units as the load increases or decreases.
3. Each heating or cooling system serving a single zone must have its own temperature control device.
. Each humidification system must have its own humidity control device.
. The system or zone control must be a programmable thermostat or other automatic control meeting the following rit r a -a).
capable of sefting back temperature to 55 degrees F during heating nd setting up to 85 degrees F during cool ire able of
automatically setting back or shutting down systems during unoccupied hours using 7 different day schedulesc)have an
accessible --hour a -part rr d ) have a battery backup capable of maintaining programmed sefflngs for at least t 1
hours without power.
Exception. A setback or shutoff rpt control is not required on thermostats that control systems serving areas that operate
continuously.
Exception: A. setback or shutoff control iz not required on of m with total energy demand oT 2 KW (5#826 tuth) or
less.
6. The systern must supply outsideventilation i systemsir re i Chapter f the International Mechanical . if the ventilation ntfatin
designed' to supply outdoor -air quantities exceeding ming ur required levels, the system must be capable of
reducing outdoor -air flow to the minimum required levels.
All pipes serving space -conditioning systema must be insulated d a full w : Hot water piping for heating systems: I in. for pipes
l 112 -in. nominal diameter 2 in. for pipes >1 1/2 -in. nominal diameter. Chilled water, refrigerant, and brine piping systems:
in. insulation for pipes <=I 1/2 -in. nominal diameter 11/2.in. insulation for pipes >1 1/2 -in, n minai diameter. Steam piping:
1/2 in. insulation for pipes <=1 112 -in. nominal diameter 3 in. insulation for pipes >1 1/2 -in. nominal diameter.
- Exception; Pipe insulation is not required for factory -installed piping within HVAC equipment.
a
Exception: Pipe insulation is not required for piping that convoys; ffijl having do F n operating temperakuro r n
go
between 55 degrees F and 105 degrees F.
Exception: Pipe insulation i not required for piping that conveys florid that have not been heated r cooled through � h the
use f fossil i f els or electric power.
Tenant Improvement
Exception: Pip n ulat not required for runout piping not exceeding 4 ft in I? i and I in. in diameter between the
control l and HVAG
8. Operation and maintenance documentation must be provided to the owner that includes t leastthe following` �nforatini
equipment p it (Input and output) and required maintenano 'rib equipment o r tfon and mvaintenance
HVAC system control maintenamce and calibration information, including widngdiagrams, schematics, and control sequence
d d tl n ; desired or Id -determined set points must be permanently recorded Orn control drawings, t Control d
digitalevi
for control systems. in programming commentsd)complete narrative of how each system [s intended to operate.,
t Service water heating equipment must meet minimum Federal e i ianrequirementsrequiremeffis included in the National App"Nance
Energy g Conservation Act and the Enengy Policy Act of 1992, which meet or exceed ASHRAE 90.1 Code. New ser iGe water
heating equipment can be assumed to rneet these requirements,
1 . Water -heating equipment must be provide with contmls that allow the user to set the water temperature
to 110 r P7 fa r
dwelling units and 90 degrees F f r other occupancies. Controls Must limit output temperatures of lavatories in publicli
restmoms to 110 degrees F.
Stair and elevator shalt vents rust be equipped with motorized dampers capable of being automatically closed during normal
building operation and interlocked to open as required by fire and smoke detection systems. All gran outdoor r airup l n .
exhaust hoods, vents, and ventilators must be equipped with motorized dampers that will automatically shut when the spaces
served are not in use. E eptions: - Gravity (non -motorized) dampen are acceptable in buildings less than three stories ion
height above grade. - Ventilation systems serving unconditioned spares.
Tenant Improvement Page 9 Of 9
P
bo
COMcheck Software
Perm It
07004()2,
Madison GNninastl*cs-Tcnant Fin-&
ish
8/23/(17
Envelope C P1
. . o iance C'ertificate
2003 IECC
'Report Date: 04130107
Data friename: Untitied.cck
Section 14. Project Information
Project Tide. Warehouse Building S -'ll
Con-strucation Site.-
Lot
hayLot 2.3 Rexburg Business Park
Rexburg, ID 83440
Owner/Agent:
Alan Cook
Design Development LLC,
P.O. BOX 131
Teton, ID 83451
709-4453
serotech@frti.om
Section 2: General Information
Building Lo ti n (for weaffier data):
Climate Zone:
Heating Degree Days (base 65 degrees F):
Cooling Degree Days (base 65 degrees F)-
Project
=Prof t Type:
Vertical Glazing Wali Area Pct.:
Buildina Tvpg
StorageF Industrial and Commercial
I.. r , Idaho
1
8693
143
New Construction
%
Section 3: Requirements Checklist
Designer/Contractor:
Alan Cook
P.O. Box 131
Teton, ID 83451
Climate -Specific Reqirema
Component me/Description Gross Area Cavity Cont Proposed Budget
or R - Value R -Valu -Factor U -Factor
-.--- �.- Perimeter
Roof 1: Metal Roof without Thermal Blocks
800 30.O0.076 0.047
Exterior vvaii 1: metal Wall without Thermal Blocks-
WindowI 'vinyl Frame:Double + Pate, Tinted, H 0.17 1 — ---
Door 1.1 Solid 252 0.340 0.520
Door .-Overhead 1
0350 0-112
0.350 0.112
a Budget -factors are used for sours baseline calculations ONLY ars
are not code requirements.
Air Leakage, Component Certification, and Vapor Retarder Requirements,:
El 1. All joints annetrtins are caulked, gasketed or covered with a moisture vapor -permeable wrapping material ial instali in
accordance tip the manufacturer's installation instructions,
LJ . Windows,. doors, and skylights certified as meeting leakage requirements.
. Component -values & U -factors labeled as certified.
CJ 4Insulation installed according to mnufaGturr'
s instructions, in substantial contact with the surfacei
being insulated, and n
Warehouse Building Shell Page 1
f
manner that ach'Ieves the r, -value without compressing the basal bon.
Li 5. Stair, elevator shy gents., and other dampers integral to the building envelope
LJ . Cargo doors and I Poading dock doors are weather sealed.
LI 7Recessed lighting fixtures are: i Type IC rated and sealed or gasketed, € r(Ii) installed inside an appropriate air -ti ht
assembly with a 0,5 inch clearance from combustible materials and with 3 inches efearance frorn insulation inateirial.,
. Building entrance doors have a vestibule and equipped with oin devices.
Exceptions:
Building entrances with re%vrolving dors.
Dors that open directly from a space less than 3000 q � ft. in area,
9. Vapor retarder in tail d,
Section 4@, Compfiance Statement
Compliance Statements The proposed envelope design represented in this docurnentis consistent with the building I n r
specifications n other calculations su itt with this permit pp1 i tion. The propose envelope system has been designed t
asst the 2003 IECC requirements in COMcheckVersion 12.1 and to complywith the mandatory requirements in the Requirements
Checklist-
Pn'ncipal Envelope Designer -Name Signature
Warehouse Building Shell
Page 2 of
'3
I-
2003 IECC
bo
COMcheck Software Version 3.2.1
D
Permit
Permit Date
Lighting Compliance Certificate
Report rate: 08/22107
Data filename: and SetfingKXIDesktopkcomchks�WAREHOTIMP-1,CCK.C;C;k
Section 1: Project Information
Project Tine: Tenant Improvement
Construction: Site --
301 Dividend
ebur! 183440
Owner/Agent
Alan Cook
Design Development LLC.
R0. Box 131
Teton, 10 83451
709-4453
aerotechCd-fretel.com
Secfion 2: General Information
Building Use Description by:
Project Type:
Activity 1'ype�
Gymnasium Playing Surface
Office
Other
Activity Type
New Construction
Section 3: Requirements Checklist
Interior Lighting:
0 1.
Floor
5272
Total actual watts must be fess than pry equal to total allowed watts.
Allowed Watts
7707
Actual Watts
1
Exp signs 5 Watts or less per side.
Exterior Lightlng:
Complies
YES
Designer/Contractor:
Alan Cook
P.O. Boy 131
Teton, ID 83451
. Efficacy greater than 45 lurrren sNV.
F_xcepto:
Specialized lighting highlighfing features f historic buildings; signage; safety or security lighting; low -voltage landscape
lighting.
Controls, Switching, and Wiring..
L) . Independent controls for each space it hl u an sensor).
Exceptions. -
Areas designated as security or emergency areas that must be continuously illuminated.
Lighting in stairways or corridors that are elements of the means of egress.
Ll . Master switch at entry to httotal guest room.
. Individual dwelling units separately metered.
7. Each space provided with a manual control to provide uniform light reduction by at. least 50%.
Tenant Improvement v
Page 3 of
0 1_0"kll
Exceptions:
Only one luminaire in space;
An occupant -sensing idevice controls the area;
The area is- acorridor, storeroom, restroo
Areas that use less th I an 0.6 Watts/sqft, M, public lobby or guest room;
U 8. Automatic fighting shutoff control in buildings larger than 5vOOO sq.ft,
U 9. Photo celllastronomical time switch oft exten"or lights.
Exceptions:
Lighting intended fbr 24 hour use.
LI 10. Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts).
Exceptions:
Electronic high -frequency ballasts; Luminaires on emergency circuits or with no available pair.
Section 4: Compliance Statement
Compliance Statement The proposed lighting design represented in this document, is consistent vWth the building plans,
specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to
meet the 2003, 1 ECC, Chapter 8, requirements in COMcheck Version 3.2.1 and to comply with the mandatory requirements in the
Requirements Checklist.
Principal Lighting Designer -Name
Tenant Improvement
Signature
Date
Page 4 of 9
I
Permit Date
COMch-eck Software Version 3.2.'I
Lighting Application Worksheet
20a3 IECC
Report Date:
Data filename: G:\Dvcuments and SetfirigsL4LAN COUMDesEcfioplcomchkslVIIAREHOTlNlP�1.CCK.cctc
Section 1: Allowed Lighting Power Calculation
B
Floor Area
OQ)
uynmasrum Playing Surface _ 5272 ----- 1.4 7381
a€�i�e 18th 1.1 198
'!
Other 2$ 1 128
Total Allowed Watts = 7707
C
Allowed
Wks I
n
Allowed Watts
ra Y M
Section 2: Actual Lighting Power Calculation
I
A
FixtureID : Description I Lamp #' �r�g Per I Ballast
1: MeW Halide 25OW I Electronic;
Section 3: Compliance Calculation
0
Lamps/
Fixture
U
C
of
i
D
Faure
Watt.
150
Til Actual 'wafts = 6750
TotalIf the Allowed Watts minus the Total Actual Wks is greater than or equal to zero ft building
Total Allow Waw
Total Aral Waw
7707
6750
�c�y
Tenant Int
Page
V
A
Permit
Peffnft Date
COMcheck Software Version 3.2.1
Mechanical Compliance Certificate
2003 IECC
Report Date: 08/22J07
Data filename: C:tDocuments and SetkngslALAN Ct}C3K1Uesk#opl mchkslWAREHUT[MP--i .CCK_rck
Section 1 : Project Information
Profect True: Tenant improvement
Construction Site.
-
301 Dividend
Rexburg, 10 83440
Alan .
RO. Box 131
Teton,, ID 83451
709-4453
aeroter,h@ftte1.wm
Section 2: General Information
Building Location (four weather data): Rexburg,Idaho
Climate Zone: 1
Heating Oagf9e Days(base degrees F). 8993
Cooling Degree Days (base 65 degreas143
P ct Type: Now Construction
Section 3.,& Mechanical Systems List
C..Wan IIA
HVAC System 1 s Heating: Radiant Heater Gas / Single Zone
Storage Water Heater 1: Service Water Heater
Section 4a. Requirements Checklist
Requirements Specific To: HVAC System 1
Designer/Contractor:
Alan .Cook
P.O. BOX 131
Teton, 1834 1
Requirements Specific To: Storage Water Heater I -w
1 . Heat traps in inlot/ouflot Wings
. 1/2 -in. insulation on 8, ft of inlet/outlet piping no integral het traps
Q I No efficiency requirements for water heater wfth storage capacity less than 20 gallons.
Generic Requ6.
irements: Must be met by all systems to which the requirement �s apRlicablea
0 1. Loyd cafpWatioms per 2001 ASHRAE Fundamentals
� �.
Plant equipment and system capacity no greater than needed to meet loads
Excapton: Standby equipment automaticAly off when pnmary system is operating
Exe tl : MutfiPle unb, controlled to sequence operation as a nn of load
3. Minimum one temperature control device per system
. Minimum one humidity conte device per installed humidification/dehumidification system
. Automatic Controls. Setback to 55 degrees i* (heat) and 85 degrees F cool * 7 -day cJock, -hour O=pant override,I O - hour,
backup
Tenant Improvement
Page 6 of 9
110
Excopfion: Confit l jGporafingzonoa
Exc- M demand r less, submit it l ti
Lj 6. Fr source for
on; system C4pable of reducing OSA to mquired minimum
U 7. HOt water pip e insulation: 1 in.. for pipes < = 1 .5 In . and 2 in, for pig > 1, 5 in. C h Wed Ovate r/refrigerant/brine Pi Pe 1 nsu
tion:
n:
in, for pipes <=1.5 in. and 1,5 in. for pipes >1.5 In. Steam pie n l ; 1.5 in. for pipes <000.5 in. and 3 in. for pipes 3
in.
EXCeLption, Piping within HVACq i ; nt
Exception: Fluid temperatures between 55 jjnd1Q5 OWNS F
txception: Fluid not heated or tooted
Exception.: Runouts <4 ft in length
Operationain enn manual provided to budding owner
Ll . Nerchasedservice water
heating, equipment meets the efficiency requirements
temperatureLl 10. Water heater troll, I 10 degrees F for dwelling units or 90 degrmsF for oMer mcupancies
D 11Stair and gator shaft vents are q peed with t rid d a m r
Section 55. Compliance Statement
COMPHance Statement The proposed mechanical deSigrn represented in thisn# is consistentwith the buildingptansl
SPecificabons andit Galculubmied With this mit�i � ,
� �� r Tho �r mechanical �tdesigned
to meet the 2003 IECC requirements 'in COMCheck Version 3.21 and tO Cornply with the mandatory requirementsin thie
Requirements Checklist.
Principal mechanical Designer -Name
9
Signature Date
Te6 ant Improvement
Page
rMO
COMcheck Software Version 3.2.1
0
Mechanical
uirements
D.escrii) ion
9"Mr t
2003 JECC
Report Date.
The following IISt provides more detailed descripflons
of the requirements in Section 4 of the Mechanical Gmliance Certificatet
Requirements specific To: HVACSy,%teM 1
Requirements Specific To:- Storage Water Heater I -
I - Heat "ps are required on non Circulating water heating systems on both inlet and outlet connections. Heat traps may be
PurChased or field -fabricated by creafingloop or inverted U-shaped
2. Pipe insulation fGr the specified noncirculating Service hot water system is the mquired for alf piping in the folloWngcategoAes:a)
first iping from any
n t N r tore, o it u late storage ` tem the inlet ' ing between the
'
storage tank and a heat trap in a noncirculatingstorage systemPipe insulation rust be at leapt have � .
n . Btu_I- -degrees .
.�� �. and
3.
Service water heating equipment used solely for heating potablewater,
the following miniumum efficiency: No efficiency requi I rements for water heate r wfth storag e capacity less tha n 20 gal I Ion s.
Generic Requirements: Must be met by all systems to which the requirement is applicable:
I . Design heating and coolinig loads for the building must be determined using proceduresin
Fundamentals or an approved lent caiculation PMGedure.
. All equi.pment and systems must be sized to be no greater than needed to meet calculated loads. A single piece of equipment
providing both heafing and cooling mut satlsfisprovision f r one function with the capacity for the other - b n as small
as Visible, Mhin available equipment options.
Excephon: The equipment and/or system Gapacity may be greater than calculatedloads for standby
equipment must be autocnatically controlled to be off when the primary equipment and/or system is operating.
Exception: Muffiple units of the same equipment type whose combined a e exceed the calctdated load are allowed
if they are provided wfth controls to sequence operation of the units as the load increases or decmases.
a Each heating or cc>olinq system serving a single zone must have its own temperature cowl device,
. Each humidification system must have its own humidity control device ■
S. The system or zone conA must be a programmable thermostat orother automatc wnW meeting the follovWng C-literia4a)
capable of sung back temperature to 55 degrees F during heating nd seffing up to 85 degrees F dun"ng coo! i capable of
automatiGally setting back or shutting down systems during unoccupied hours using 7 different rent d a chi u l have an
accessible 2-ftr occupant rrid have a battery back-up capable of maintaining programmed tfin for at least 1
hours wig mer.
Excepton: A setback or shutoff control is not req a .red on thermostats that control systems sang areas that operate
Exception: A setback w shutoffcontrol- is not require on systems with total energy demand of 2 kW (6,826 t 'h) or
less.
The system rn St supply outside ventilation air as required by Chapter 4 of the Ince Mechanical �. If the ventilation
system F designed t supply outdoor -air guanines exceeding nimum required levels, the system must be capable of
reducing outdoor -air flow to the mini required levels.
T. R pipes servingspace-condftioning SYStemst bel ✓dated as follows.- Hot water piping for heafing systams: I in. fbr pipes
11/ -ire. nominal diameter 2 in for pipe1 -ire. nominal diameter. Chilled water, ref gerant, and brine piping systems: I
in.. insulabon for pipes <=1/ 4 ; nominal diameter 1 1/2 In. insulation for pipes >1 11 _in nominal diameter.
1/2 In. insulabon for pipes <=I 1/2 -in. nominal diameter 3 in., insulation for pipes >1 V24n.. n r inal diameter,
i
Exception � Pipe in ul is not required for factory -in tubed piping within HVAC equipment.
.
Exceptiom Pipe insulation is not required for piping that conveys fluids having a design operating temperature ran
ge
between 55 degrees F and 105 degrees F.
F
Exception: Pipe insulation is not required for piping that conveys fluids that have not been heated Wiled through Um
w
use of fossil fuels or electic power.
• �+.PFr•YrW Tenant -
Improvement
Page 8 of
0
- r
FxcF.pfion- Pip@ ingul2fl-OMN 4ON
nOt MOW for runout n ii not din irn It and e &ametw
ntl valve and HVAC Il..
B. OPWafion and Ma"ntenance on must be provided to the Owner that muss at !,east the following ifo
t
on:a)
eqU1P.mL21nt capacity (input and out) and requiredI
ntopelr ,
r
HVAC system Wntrol maintenance and Fl I Don and ma"ntenance manuaisc) morin
uescnptions; desired or �conuoi sequence
yet Points must be permanent reccTded on control drawings at wntrol devices, or,
ford' #81 M*01 , in Programming C*Mmen tsd) complete narrabve system's
19
Service water heating equipment must meet minimum Federal efficienGy requirements induded in the Nafional Appliance
Energy Conserv.-Mon Act and the nergy Oflcy Act of 1992 r which meet Or exceed A%SHRAE 901 Code. New service water
healing eqUIPMMt can be asmMed -ito meet ftse nrq. 11 j h r nn p ntic,
Water -heating equipment must be PrOVWed with controls that allow the user to set the Water teMpeTatUre to I 10 degrees. F fbr
dwelling units and 90 Clegrees F for other pupaes. GoW must limit u� temperatures of lavages i
r � t 10 reel FL .I t I ity
Stair and elevator shaft vents must be equipped with mtorized dampers capable of being automatically closed d '
OW uring normal
building operation and intertocked to open as required by fire and smoke detection sYstems- All gravfty outdoor air supply and
exhaust hoods, vents, and ventilators must be equipped with motoijzed dampers that will automatically shut when the spaces
served are not in use. Exce ptions -. - Gravity (non-muto nized) dampers are acceptabi e i n build ing s less than th ree stodes in
height above grade. - Ventilation systems serving unconditioned
.�,=�-,r����-,��-• •-�-,�.,.-may... ,..
Tenant Improvement
����*�iC'�®�Neltui3���l�IT17�q1�C4fTi�1'!M`4�dfn��lw4•s��',h4"�I�IIT
page 9 Of !D