Loading...
HomeMy WebLinkAboutCOMCHECK - 07-00402 - Madison Gymnastics - Tenant Finish4P - 2003 IECC D CO M check Softwar M "t 0700402 Madison (jr\11111clstics- Tenant A 41sl1 8/23/07 Envelope Compliance Certificate Report Date. 08/22107 Data filename: Q-0ocuments and SattingsALAN CA00 MDes kto k orn h E Section 1: Project Information Project Title. Tenant Improvement Construction. Site; 01 Dividend Rexburg, ID 83440 Owner/Agent; Alan Cook Design D l p t LLC. P.O. Box 131 Teton, I 83451 70953 aerotech@fretel.com Section ZF!4 General Information Building Lon (for weather data). Climate Zone:- Heating one;Heating Degree Lays baso 65 degrees F: Cooling Degree Days, (base 65 degrees F): Project Type. - Vertical Gl ype,' rt 11 in / Wall Area Pet, iv -Type(-s) Gyrimasiurn Playing Burke Office Other Rexburg, Intl 1 869.3 143 New Construction 1% Section 3: Requirements Checklist Io or Ares 5272 180 128 Designer/Contractor'. Man Cook P.O. Box 131 Teton, ID 83451 Climate -Specific Requirements: Component Name/Descriptio Roof 1: Metal Roof without Thermal Blocks Exterior Wall 1: Metal Wall without TheFmal Bucks Window 1: Distal Frame with Thermal Break. -Double Pane, Tinted, SHGC 0.17 Door 1 Solid Door : Overhead Gross Area or Perimeter 1800 9840 252 196 Cavity -Value coat. Iue w Proposed l -Factor 0.076 0.111 ) AI 0.350 0.350 Budget -Factor 0,047 0.067 0.520 (a) Budget U=fac#ors are used for software baseline calculations ONLY, and are not cede requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements,* ❑ I. All joints and penetrations are caulked, gaskefed or covered with a moisture vapor -permeable wrapping materia] installed in accordance with the manufacturer's installation instructions. Tenant Improvement � . Page 1 of � a 2. Windows, doors, and rlic r rtiftd metro leakage requirements. . Component R - values -f ui r labeled as cerfiffed. .I nsulation i n t fled acmrding to manufacturersinstructions, in substantial contact with the surface being insulated , and in a manner that achieves the rated -value without compressing the insulation. . Stair, elevator shaft vents, nd other dampers integral to the building envelope are equippiad 0 6. Cargo doors and loading dorkdoors are weather sealed. Ll .. Recessed lighting fixtures are: 1 Type IC rated and sealed or 4 t d r ll installed inside .n appropdate inti 'h assembly with a 0.5inch clearance from combustible materials and with 3 inches clearance from insulation material, LJ 8. Building entrance doors have a vestibuleand equipped with closing, Exceptions.,, Building entrances with revolving doors. Doors that open directly fro$Pace less than 3000 sq. ft in area. LJ . Vapor retarder 'Installed. Section 4.w Compliance Statement Compliance Statement. The proposed envelope design r pr nt d In this document is wnsistent wfth the building plans, 5pecifications and other calculations submiftedwith this permit application. The proposed envelope system has been lesioned t asst the 2003 J ECC requirements in COM check Version 3.2.1 and to comply with the mandatory requirements in the Requirements Checklist. Principal Envelope Designer -Name Tenant Improvement Signature Date 2003 IECC D COMcheck Software Version 3.2.1 Q Permft Dam Lighting Compliance Certificate deport Date: 08122/07 Data filename: CADocuments and Semon \ALAN COO Section 1: Project Info ation Project Title: Tenant Improvement Construction Site: 301 Dividend Rexburg, ID 83440 Owner/Agent; Alan. Cook Deign [Development LLC. P.G. Box 131 Teton, ID 83451 709-4453 aerotech@fhatel.com SOction Z: General Information .1 Building Use Description by: ActI TYPE Project Type: New Constivction ,*'. a -W s o r ' Playl ng Surface ff Other lection 3: Requirements Checklist Floor .Area 5272 180 128 Interior Lighting: 13 1. Total actual waw must be less than or equal to ftl allowed watts. Allowed Waft Actual Waw COMIks 7707 6750 YES 2. Exit stgns 5 Watts or les per sWe. Desi n tr r: Alan Gook P.O. BOX 131 Teton, I 1 - — 0 % Exterior Lighting: . Efficacy greater than 45 lnf. Gem: Specialized fighUng highlighting features of historic buildings; signage- safety or security righting; lour- It a landscape lighting. Controls, Switching, and Wiring.. J 4 Independent controls for each space ithocany sensor). .do: Areas designated as securityr emergency areas that must be continuously illuminated. Lighting in stairways or odors that are elements of the means of egress. LJ . Master swftch at entry to hotllctl guest room. Lk . Individual dwelling units sopa tel et re . . Each space provided with a manual control to pfovideung It t reducdon by at least - _ - .-:�*-z...-••:—.• .•• :.. .. •, . '¢48'"€'rfYi9'.ilYho5l4: Y'�#A' Tenant Improvement Page 3 of Excapfionv Onty one luminaire in space; An - - n occupant -sensing device Controls the area The r is a Gori d ora store, rester Pubfic Areas that use less than 0.6 'wafts ., wntrol in buildings larger than 5,000 sq.ft. U! 19- Photoce 11/antro of y f [ match o exterior lights. Exceptions: Lighting intended for 24 hour use. U- 10. TarideLM wired one -lamp an'd three -lamp ballasted luminaires (No single4amp ballasts). Exo: Electonic high -frequency ballasts; Luminaires r Section 40m Compliance Statement OmPfianceStatement: The proposW ligtt N, ign represented i thIs istent with the F building sPecifications and other calculations submiftedVA'th this permit met the 2003 I, Chapter 8, requirements in COMcheck Version 3.2.1 and to comply with Requirements Cheddist. Prindpal Lighting Ine r -Name P, Temnt Impmement Signature Date Page 4 OT IF 7 L COMcheck Software Version 3,2.1 ,Permit Date Lighting Application Worksheet 2003 IECC Report oats: Data filename_ C:IOocumenfs and SettingslAl..AN COO FCtdesfctaplc0mchksIV4'AREHflT1MP-1.CGK_cck Section 1: Allowed Lighting Power Calculatio-n A Area Category Gynmasium Flaying Surface Office Floor Area 4ft�} Allowed Allowed Watts llilla#ts f ft2 (B x C) 5272 1.4 738i 180 1. 1 1' Other 128 1 128 Total Allowed Watts 7707 Section 2: Actual Lighting Power Calculation Fixture ID :. Description I Lamp I Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt, HID 1: Metal Halide OW Electronic X50 f'I 45 Total Actual Watts 6750 Section 3: Compliance Calculation If the Total Allowed Wafts minus the Total Actual Waft is greater= than or equal to zero, the building wrnplies. Total Allowed Watt = 7707 Total Actual 'watts = 6750 Project ornpli n = 957 Tenant Improvement Page 5 of 01 fA 2003 IECC Pan -nit Permit Date COMcheck Software Version 3.2.1 Mechanical Compliance Certificate Report Date: 08/22107 alfilename: : Documents and SettingL_ . KXDes ktop\camchks\WAREH0T1 P- I . cok Section 1: Project Information Project Title: Tenant Improvement Construction Site; 1 Dividend Rexburg, ID 8340 CMner/Agent: Alan Design Development LLC. P.O. Box 131 Teton, I C 83451 709-4453 aerotech@fretel.com Section 2w. General information Building Location (for weather data): Rexburg, Idaho Climate Zone., 1 Healing Degree Days (base 65 degrees F),,- 8693 Cooling Degree Days (base 65 degrees F: 143 Project Type: New Construction Section 3: Mechanical Systems List Quantiltv System TvDe & Description 1 HVAC System 1: Heating: Radiant Beater, Gas / Single Zone 1 Storage Water h eater 1: Service Water Heuer Section 4K. Requirements Checklist Requirements Specific To: HVAC System 1 Des i gner/Contra-C-10 r: Alan Cook P.O. Box 131 Teton, I D 834 51 Requirements Specific To: Storage Water Heater I ; LJ I. Heat traps in inletlout[et ftting5 D 2. 1l2 -1-n, insulation on B ft of inlet/outlet piing if no integral heat traps ❑ 3. No efficiency requirements for water heater with storage capacity less than 20, gallons_ Generic Requirements: Must met all stems which the i applicable; 1. Load calculations per 2001ASHRAE Fundamentals 2. Plant aui nt and systemrAnnnihi n r tr tl�r� t ivu Exception: Standby equipment automatically off when primary system is operating Expf on.. Multiple unite controlled to sequence operation as a function of load U 3, Minimum one temperature control devicep r system L) . Minimum one. humidity contral dovice per installed humidification/dehumidification tem Automatic Controls, Setback to 55 degrees F (heat) and 85 degrees l` (cool); 7 -day clock, -.dour occupant r aj backup Tenant Improvement I0 -hour Page Exception: Contint y operating zones Exception; 2 kW del 1id r less, submit calculations . Outside -air souroe for ventilation; system capable of reducing OSA to required minimum LJ 7. Hot water pipe insulation: 1 'In. for pipes =1.5 in. and 2 in. for pipes. >1.5in. Chilled water/regi r nt/ rin insulation: in. for pipes � .5 in. and 1 .5 in. for Pipes >1. in. Steam pipe insulation. 1.5 in. for pipes =1.5 in. and 3 in. for pipes 1 in. Exception: Piping within HVAC equipment Exception: Fluid temperatures between 55 and 105 degrees F Exception: Fluid not heated r copied Exception, Runouts <4 ft in length 8. Operation and maintenance manual provided to building owner LI . Newly purchased service water heating equipment meets the fficienrequirements LJ 10. Water heater temperature ontr i , 110 degrees 1= for dwelling units or 90 degrees F for other occupancies IJ It Stair and elevator shaft vents are equipped with tri m per Section 51.A Compliance Statement Compliance Statement: Theproposed mechanical design r pr tinted in this document consistent with specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2003 IECC requirements in COMrheck Version 3.2.1 and to comply with the mandatory requirements in the Requirements Checklist. Principal I e h nice l Designer -Name Signature Date Tenant Improvement P A iiR COMcheck Software Version 3.2.1 FMO Mechanical Require. ents Description 2003 IECC Report Date: Data filename: G,kL}ocuments and 5etiings'u4LgN CppK}Desktop},Gamchks1WAREHaTlMP—I.CCK.cck The following list provides more, detailed descriptions of the requirements in Sermon 4 of the Mechanical Comliana Requirements Specific To: HVAC System 1 Requirements Specific T Storage Water Heater 1 1 e Heat traps are required on noncirculating water heating systems on both inlet and outlet connections. Heat traps Purchased or field -fabricated by creatinglop or inverted U-shaped arrangernent on the inlet and outlet pipes. 2. Pipe insulation for the specifled noncirculating servicehot water system is required for all piping in the following cat des: a) the first 8 ft of outlet piping from any constant -temperature, noncirculating storage systemb the inlet Piping between the storage tank and a heat trap in a noncirculating storage systemPipe insulation must be at least 1/2 in. and have a conductivity no >0.28 Btu -i nl h -f -degrees F). ri water heating equipment used solely for heating potable water, pool heaters, and hot water storage tanks must meet the following min umum efficiency; No efficiency requirements for water heater with storage capacity less than 20 gallons.. Generic Requirements: Must be met by all systems to which the requirement is applicable: I . Design heating and cooling leads for the building must be determined using procedures in the ASHRAE Handbook of Fundamentals or an approved equivalent calculation procedure. 2. All equipment and systems must be sized to be no greater than needed to meet calculated loads. A single pike of equipment providing both heating and cooling must satisfy this provision for one function with the capacity for the other function as srnafi as possible, within available equipment notions. - Exception: The equipment and/or SYSrteMGaPaCity may be greater than calculated loads fbr standby purposes. Standby equipment must be automatically controlled to be off when the primary equipment and/or system is operating. Exception, Multiple units of the same equipment type whose combined capacities exceed the c-ai Mated load are allowed if they aro provided with controls to sequence operation of the units as the load increases or decreases. 3. Each heating or cooling system serving a single zone must have its own temperature control device. . Each humidification system must have its own humidity control device. . The system or zone control must be a programmable thermostat or other automatic control meeting the following rit r a -a). capable of sefting back temperature to 55 degrees F during heating nd setting up to 85 degrees F during cool ire able of automatically setting back or shutting down systems during unoccupied hours using 7 different day schedulesc)have an accessible --hour a -part rr d ) have a battery backup capable of maintaining programmed sefflngs for at least t 1 hours without power. Exception. A setback or shutoff rpt control is not required on thermostats that control systems serving areas that operate continuously. Exception: A. setback or shutoff control iz not required on of m with total energy demand oT 2 KW (5#826 tuth) or less. 6. The systern must supply outsideventilation i systemsir re i Chapter f the International Mechanical . if the ventilation ntfatin designed' to supply outdoor -air quantities exceeding ming ur required levels, the system must be capable of reducing outdoor -air flow to the minimum required levels. All pipes serving space -conditioning systema must be insulated d a full w : Hot water piping for heating systems: I in. for pipes l 112 -in. nominal diameter 2 in. for pipes >1 1/2 -in. nominal diameter. Chilled water, refrigerant, and brine piping systems: in. insulation for pipes <=I 1/2 -in. nominal diameter 11/2.in. insulation for pipes >1 1/2 -in, n minai diameter. Steam piping: 1/2 in. insulation for pipes <=1 112 -in. nominal diameter 3 in. insulation for pipes >1 1/2 -in. nominal diameter. - Exception; Pipe insulation is not required for factory -installed piping within HVAC equipment. a Exception: Pipe insulation is not required for piping that convoys; ffijl having do F n operating temperakuro r n go between 55 degrees F and 105 degrees F. Exception: Pipe insulation i not required for piping that conveys florid that have not been heated r cooled through � h the use f fossil i f els or electric power. Tenant Improvement Exception: Pip n ulat not required for runout piping not exceeding 4 ft in I? i and I in. in diameter between the control l and HVAG 8. Operation and maintenance documentation must be provided to the owner that includes t leastthe following` �nforatini equipment p it (Input and output) and required maintenano 'rib equipment o r tfon and mvaintenance HVAC system control maintenamce and calibration information, including widngdiagrams, schematics, and control sequence d d tl n ; desired or Id -determined set points must be permanently recorded Orn control drawings, t Control d digitalevi for control systems. in programming commentsd)complete narrative of how each system [s intended to operate., t Service water heating equipment must meet minimum Federal e i ianrequirementsrequiremeffis included in the National App"Nance Energy g Conservation Act and the Enengy Policy Act of 1992, which meet or exceed ASHRAE 90.1 Code. New ser iGe water heating equipment can be assumed to rneet these requirements, 1 . Water -heating equipment must be provide with contmls that allow the user to set the water temperature to 110 r P7 fa r dwelling units and 90 degrees F f r other occupancies. Controls Must limit output temperatures of lavatories in publicli restmoms to 110 degrees F. Stair and elevator shalt vents rust be equipped with motorized dampers capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. All gran outdoor r airup l n . exhaust hoods, vents, and ventilators must be equipped with motorized dampers that will automatically shut when the spaces served are not in use. E eptions: - Gravity (non -motorized) dampen are acceptable in buildings less than three stories ion height above grade. - Ventilation systems serving unconditioned spares. Tenant Improvement Page 9 Of 9 P bo COMcheck Software Perm It 07004()2, Madison GNninastl*cs-Tcnant Fin-& ish 8/23/(17 Envelope C P1 . . o iance C'ertificate 2003 IECC 'Report Date: 04130107 Data friename: Untitied.cck Section 14. Project Information Project Tide. Warehouse Building S -'ll Con-strucation Site.- Lot hayLot 2.3 Rexburg Business Park Rexburg, ID 83440 Owner/Agent: Alan Cook Design Development LLC, P.O. BOX 131 Teton, ID 83451 709-4453 serotech@frti.om Section 2: General Information Building Lo ti n (for weaffier data): Climate Zone: Heating Degree Days (base 65 degrees F): Cooling Degree Days (base 65 degrees F)- Project =Prof t Type: Vertical Glazing Wali Area Pct.: Buildina Tvpg StorageF Industrial and Commercial I.. r , Idaho 1 8693 143 New Construction % Section 3: Requirements Checklist Designer/Contractor: Alan Cook P.O. Box 131 Teton, ID 83451 Climate -Specific Reqirema Component me/Description Gross Area Cavity Cont Proposed Budget or R - Value R -Valu -Factor U -Factor -.--- �.- Perimeter Roof 1: Metal Roof without Thermal Blocks 800 30.O0.076 0.047 Exterior vvaii 1: metal Wall without Thermal Blocks- WindowI 'vinyl Frame:Double + Pate, Tinted, H 0.17 1 — --- Door 1.1 Solid 252 0.340 0.520 Door .-Overhead 1 0350 0-112 0.350 0.112 a Budget -factors are used for sours baseline calculations ONLY ars are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements,: El 1. All joints annetrtins are caulked, gasketed or covered with a moisture vapor -permeable wrapping material ial instali in accordance tip the manufacturer's installation instructions, LJ . Windows,. doors, and skylights certified as meeting leakage requirements. . Component -values & U -factors labeled as certified. CJ 4Insulation installed according to mnufaGturr' s instructions, in substantial contact with the surfacei being insulated, and n Warehouse Building Shell Page 1 f manner that ach'Ieves the r, -value without compressing the basal bon. Li 5. Stair, elevator shy gents., and other dampers integral to the building envelope LJ . Cargo doors and I Poading dock doors are weather sealed. LI 7Recessed lighting fixtures are: i Type IC rated and sealed or gasketed, € r(Ii) installed inside an appropriate air -ti ht assembly with a 0,5 inch clearance from combustible materials and with 3 inches efearance frorn insulation inateirial., . Building entrance doors have a vestibule and equipped with oin devices. Exceptions: Building entrances with re%vrolving dors. Dors that open directly from a space less than 3000 q � ft. in area, 9. Vapor retarder in tail d, Section 4@, Compfiance Statement Compliance Statements The proposed envelope design represented in this docurnentis consistent with the building I n r specifications n other calculations su itt with this permit pp1 i tion. The propose envelope system has been designed t asst the 2003 IECC requirements in COMcheckVersion 12.1 and to complywith the mandatory requirements in the Requirements Checklist- Pn'ncipal Envelope Designer -Name Signature Warehouse Building Shell Page 2 of '3 I- 2003 IECC bo COMcheck Software Version 3.2.1 D Permit Permit Date Lighting Compliance Certificate Report rate: 08/22107 Data filename: and SetfingKXIDesktopkcomchks�WAREHOTIMP-1,CCK.C;C;k Section 1: Project Information Project Tine: Tenant Improvement Construction: Site -- 301 Dividend ebur! 183440 Owner/Agent Alan Cook Design Development LLC. R0. Box 131 Teton, 10 83451 709-4453 aerotechCd-fretel.com Secfion 2: General Information Building Use Description by: Project Type: Activity 1'ype� Gymnasium Playing Surface Office Other Activity Type New Construction Section 3: Requirements Checklist Interior Lighting: 0 1. Floor 5272 Total actual watts must be fess than pry equal to total allowed watts. Allowed Watts 7707 Actual Watts 1 Exp signs 5 Watts or less per side. Exterior Lightlng: Complies YES Designer/Contractor: Alan Cook P.O. Boy 131 Teton, ID 83451 . Efficacy greater than 45 lurrren sNV. F_xcepto: Specialized lighting highlighfing features f historic buildings; signage; safety or security lighting; low -voltage landscape lighting. Controls, Switching, and Wiring.. L) . Independent controls for each space it hl u an sensor). Exceptions. - Areas designated as security or emergency areas that must be continuously illuminated. Lighting in stairways or corridors that are elements of the means of egress. Ll . Master switch at entry to httotal guest room. . Individual dwelling units separately metered. 7. Each space provided with a manual control to provide uniform light reduction by at. least 50%. Tenant Improvement v Page 3 of 0 1_0"kll Exceptions: Only one luminaire in space; An occupant -sensing idevice controls the area; The area is- acorridor, storeroom, restroo Areas that use less th I an 0.6 Watts/sqft, M, public lobby or guest room; U 8. Automatic fighting shutoff control in buildings larger than 5vOOO sq.ft, U 9. Photo celllastronomical time switch oft exten"or lights. Exceptions: Lighting intended fbr 24 hour use. LI 10. Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts). Exceptions: Electronic high -frequency ballasts; Luminaires on emergency circuits or with no available pair. Section 4: Compliance Statement Compliance Statement The proposed lighting design represented in this document, is consistent vWth the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2003, 1 ECC, Chapter 8, requirements in COMcheck Version 3.2.1 and to comply with the mandatory requirements in the Requirements Checklist. Principal Lighting Designer -Name Tenant Improvement Signature Date Page 4 of 9 I Permit Date COMch-eck Software Version 3.2.'I Lighting Application Worksheet 20a3 IECC Report Date: Data filename: G:\Dvcuments and SetfirigsL4LAN COUMDesEcfioplcomchkslVIIAREHOTlNlP�1.CCK.cctc Section 1: Allowed Lighting Power Calculation B Floor Area OQ) uynmasrum Playing Surface _ 5272 ----- 1.4 7381 a€�i�e 18th 1.1 198 '! Other 2$ 1 128 Total Allowed Watts = 7707 C Allowed Wks I n Allowed Watts ra Y M Section 2: Actual Lighting Power Calculation I A FixtureID : Description I Lamp #' �r�g Per I Ballast 1: MeW Halide 25OW I Electronic; Section 3: Compliance Calculation 0 Lamps/ Fixture U C of i D Faure Watt. 150 Til Actual 'wafts = 6750 TotalIf the Allowed Watts minus the Total Actual Wks is greater than or equal to zero ft building Total Allow Waw Total Aral Waw 7707 6750 �c�y Tenant Int Page V A Permit Peffnft Date COMcheck Software Version 3.2.1 Mechanical Compliance Certificate 2003 IECC Report Date: 08/22J07 Data filename: C:tDocuments and SetkngslALAN Ct}C3K1Uesk#opl mchkslWAREHUT[MP--i .CCK_rck Section 1 : Project Information Profect True: Tenant improvement Construction Site. - 301 Dividend Rexburg, 10 83440 Alan . RO. Box 131 Teton,, ID 83451 709-4453 aeroter,h@ftte1.wm Section 2: General Information Building Location (four weather data): Rexburg,Idaho Climate Zone: 1 Heating Oagf9e Days(base degrees F). 8993 Cooling Degree Days (base 65 degreas143 P ct Type: Now Construction Section 3.,& Mechanical Systems List C..Wan IIA HVAC System 1 s Heating: Radiant Heater Gas / Single Zone Storage Water Heater 1: Service Water Heater Section 4a. Requirements Checklist Requirements Specific To: HVAC System 1 Designer/Contractor: Alan .Cook P.O. BOX 131 Teton, 1834 1 Requirements Specific To: Storage Water Heater I -w 1 . Heat traps in inlot/ouflot Wings . 1/2 -in. insulation on 8, ft of inlet/outlet piping no integral het traps Q I No efficiency requirements for water heater wfth storage capacity less than 20 gallons. Generic Requ6. irements: Must be met by all systems to which the requirement �s apRlicablea 0 1. Loyd cafpWatioms per 2001 ASHRAE Fundamentals � �. Plant equipment and system capacity no greater than needed to meet loads Excapton: Standby equipment automaticAly off when pnmary system is operating Exe tl : MutfiPle unb, controlled to sequence operation as a nn of load 3. Minimum one temperature control device per system . Minimum one humidity conte device per installed humidification/dehumidification system . Automatic Controls. Setback to 55 degrees i* (heat) and 85 degrees F cool * 7 -day cJock, -hour O=pant override,I O - hour, backup Tenant Improvement Page 6 of 9 110 Excopfion: Confit l jGporafingzonoa Exc- M demand r less, submit it l ti Lj 6. Fr source for on; system C4pable of reducing OSA to mquired minimum U 7. HOt water pip e insulation: 1 in.. for pipes < = 1 .5 In . and 2 in, for pig > 1, 5 in. C h Wed Ovate r/refrigerant/brine Pi Pe 1 nsu tion: n: in, for pipes <=1.5 in. and 1,5 in. for pipes >1.5 In. Steam pie n l ; 1.5 in. for pipes <000.5 in. and 3 in. for pipes 3 in. EXCeLption, Piping within HVACq i ; nt Exception: Fluid temperatures between 55 jjnd1Q5 OWNS F txception: Fluid not heated or tooted Exception.: Runouts <4 ft in length Operationain enn manual provided to budding owner Ll . Nerchasedservice water heating, equipment meets the efficiency requirements temperatureLl 10. Water heater troll, I 10 degrees F for dwelling units or 90 degrmsF for oMer mcupancies D 11Stair and gator shaft vents are q peed with t rid d a m r Section 55. Compliance Statement COMPHance Statement The proposed mechanical deSigrn represented in thisn# is consistentwith the buildingptansl SPecificabons andit Galculubmied With this mit�i � , � �� r Tho �r mechanical �tdesigned to meet the 2003 IECC requirements 'in COMCheck Version 3.21 and tO Cornply with the mandatory requirementsin thie Requirements Checklist. Principal mechanical Designer -Name 9 Signature Date Te6 ant Improvement Page rMO COMcheck Software Version 3.2.1 0 Mechanical uirements D.escrii) ion 9"Mr t 2003 JECC Report Date. The following IISt provides more detailed descripflons of the requirements in Section 4 of the Mechanical Gmliance Certificatet Requirements specific To: HVACSy,%teM 1 Requirements Specific To:- Storage Water Heater I - I - Heat "ps are required on non Circulating water heating systems on both inlet and outlet connections. Heat traps may be PurChased or field -fabricated by creafingloop or inverted U-shaped 2. Pipe insulation fGr the specified noncirculating Service hot water system is the mquired for alf piping in the folloWngcategoAes:a) first iping from any n t N r tore, o it u late storage ` tem the inlet ' ing between the ' storage tank and a heat trap in a noncirculatingstorage systemPipe insulation rust be at leapt have � . n . Btu_I- -degrees . .�� �. and 3. Service water heating equipment used solely for heating potablewater, the following miniumum efficiency: No efficiency requi I rements for water heate r wfth storag e capacity less tha n 20 gal I Ion s. Generic Requirements: Must be met by all systems to which the requirement is applicable: I . Design heating and coolinig loads for the building must be determined using proceduresin Fundamentals or an approved lent caiculation PMGedure. . All equi.pment and systems must be sized to be no greater than needed to meet calculated loads. A single piece of equipment providing both heafing and cooling mut satlsfisprovision f r one function with the capacity for the other - b n as small as Visible, Mhin available equipment options. Excephon: The equipment and/or system Gapacity may be greater than calculatedloads for standby equipment must be autocnatically controlled to be off when the primary equipment and/or system is operating. Exception: Muffiple units of the same equipment type whose combined a e exceed the calctdated load are allowed if they are provided wfth controls to sequence operation of the units as the load increases or decmases. a Each heating or cc>olinq system serving a single zone must have its own temperature cowl device, . Each humidification system must have its own humidity control device ■ S. The system or zone conA must be a programmable thermostat orother automatc wnW meeting the follovWng C-literia4a) capable of sung back temperature to 55 degrees F during heating nd seffing up to 85 degrees F dun"ng coo! i capable of automatiGally setting back or shutting down systems during unoccupied hours using 7 different rent d a chi u l have an accessible 2-ftr occupant rrid have a battery back-up capable of maintaining programmed tfin for at least 1 hours wig mer. Excepton: A setback or shutoff control is not req a .red on thermostats that control systems sang areas that operate Exception: A setback w shutoffcontrol- is not require on systems with total energy demand of 2 kW (6,826 t 'h) or less. The system rn St supply outside ventilation air as required by Chapter 4 of the Ince Mechanical �. If the ventilation system F designed t supply outdoor -air guanines exceeding nimum required levels, the system must be capable of reducing outdoor -air flow to the mini required levels. T. R pipes servingspace-condftioning SYStemst bel ✓dated as follows.- Hot water piping for heafing systams: I in. fbr pipes 11/ -ire. nominal diameter 2 in for pipe1 -ire. nominal diameter. Chilled water, ref gerant, and brine piping systems: I in.. insulabon for pipes <=1/ 4 ; nominal diameter 1 1/2 In. insulation for pipes >1 11 _in nominal diameter. 1/2 In. insulabon for pipes <=I 1/2 -in. nominal diameter 3 in., insulation for pipes >1 V24n.. n r inal diameter, i Exception � Pipe in ul is not required for factory -in tubed piping within HVAC equipment. . Exceptiom Pipe insulation is not required for piping that conveys fluids having a design operating temperature ran ge between 55 degrees F and 105 degrees F. F Exception: Pipe insulation is not required for piping that conveys fluids that have not been heated Wiled through Um w use of fossil fuels or electic power. • �+.PFr•YrW Tenant - Improvement Page 8 of 0 - r FxcF.pfion- Pip@ ingul2fl-OMN 4ON nOt MOW for runout n ii not din irn It and e &ametw ntl valve and HVAC Il.. B. OPWafion and Ma"ntenance on must be provided to the Owner that muss at !,east the following ifo t on:a) eqU1P.mL21nt capacity (input and out) and requiredI ntopelr , r HVAC system Wntrol maintenance and Fl I Don and ma"ntenance manuaisc) morin uescnptions; desired or �conuoi sequence yet Points must be permanent reccTded on control drawings at wntrol devices, or, ford' #81 M*01 , in Programming C*Mmen tsd) complete narrabve system's 19 Service water heating equipment must meet minimum Federal efficienGy requirements induded in the Nafional Appliance Energy Conserv.-Mon Act and the nergy Oflcy Act of 1992 r which meet Or exceed A%SHRAE 901 Code. New service water healing eqUIPMMt can be asmMed -ito meet ftse nrq. 11 j h r nn p ntic, Water -heating equipment must be PrOVWed with controls that allow the user to set the Water teMpeTatUre to I 10 degrees. F fbr dwelling units and 90 Clegrees F for other pupaes. GoW must limit u� temperatures of lavages i r � t 10 reel FL .I t I ity Stair and elevator shaft vents must be equipped with mtorized dampers capable of being automatically closed d ' OW uring normal building operation and intertocked to open as required by fire and smoke detection sYstems- All gravfty outdoor air supply and exhaust hoods, vents, and ventilators must be equipped with motoijzed dampers that will automatically shut when the spaces served are not in use. Exce ptions -. - Gravity (non-muto nized) dampers are acceptabi e i n build ing s less than th ree stodes in height above grade. - Ventilation systems serving unconditioned .�,=�-,r����-,��-• •-�-,�.,.-may... ,.. Tenant Improvement ����*�iC'�®�Neltui3���l�IT17�q1�C4fTi�1'!M`4�dfn��lw4•s��',h4"�I�IIT page 9 Of !D